The name of the station was finalized on 1 July 2021.[1]
Kushida Shrine Station is scheduled to begin operations on 27 March 2023 when the Nanakuma Line is extended east to Hakata Station.[2] Originally scheduled for a 2020 opening, a sinkhole pushed back the opening date by three years.[3]
Kushida Shrine Station opened on 27 March 2023.[4]
^"新駅の名称と新車両が決定しました!!" [The name of the new station and the new train cars have been decided!!] (PDF). city.fukuoka.lg.jp (in Japanese). 1 July 2021. Archived from the original(PDF) on 6 August 2021.
^"福岡市交通局,七隈線延伸区間(天神南—博多間)の開業は2023年3月27日に" [Fukuoka City Transportation Bureau, Nanakuma Line extension section (Tenjin Minami - Hakata) will open on 27 March 2023]. Japan Railfan Magazine Online (in Japanese). 1 September 2022. Archived from the original on 3 September 2022. Retrieved 3 September 2022.
^"七隈線延伸工事に係る道路陥没事故報告 福岡市交通局 (報告資料)" [Report of Road Collapse Accident Related to Nanakuma Line Extension Work Fukuoka City Transportation Bureau (Report Material)] (PDF). subway.city.fukuoka.lg.jp (in Japanese). 12 May 2017. Archived(PDF) from the original on 28 February 2020. Retrieved 12 January 2022.