Kingsmeadow won the DFES School Achievement Award in 2001, 2002 and 2003 and contains the Life Long Learning Centre (LLLC).
In 2007, Kingsmeadow began construction of a new school building. The Duke of Kent visited on 20 March 2009 to officially open the new school building.
In 2009 the Speaker of the House of Commons, John Bercow visited the school.
In March 2010 the school was inspected by Ofsted and deemed "good with outstanding features".
In April 2015 the school was inspected by OFSTED and deemed "good" but "requires improvement". Key Stage 4 performance in 2015 saw 32% of students achieving 5+ A*-C GCSEs; significantly below the Gateshead local authority average of 58.1% and the national average of 53.8%.[1]