Jixi Pumped Storage Power Station

Jixi Pumped Storage Power Station
Official name绩溪抽水蓄能电站
CountryChina
LocationJixi County
Coordinates30°09′33″N 118°45′42″E / 30.1593°N 118.7617°E / 30.1593; 118.7617
StatusOperational
Construction began2010
Opening date2019-2021
Construction costCNY¥8.2 billion (US$ 1.2 billion)[1]
Upper reservoir
Total capacity10,598,000 m3 (8,592 acre⋅ft)
Lower reservoir
Total capacity10,944,000 m3 (8,872 acre⋅ft)
Power Station
Turbines6 x 300 MW Francis pump turbines
Installed capacity1,800 MW

The Jixi Pumped Storage Power Station (Chinese: 绩溪抽水蓄能电站) is a pumped-storage hydroelectric power station currently under construction in Jixi County, Anhui Province, China. Studies were carried out in 2008 and construction began in December 2010. It is expected to last 6 years.[2][3] As of April 2017 the dam is completed.[4] First turbine was commissioned in December 2019, followed by second in May 2020 and third and fourth in August 2020. The last two units were commissioned in February 2021.[5]

Reservoirs

The lower reservoir is formed by a 63.9 m (210 ft) tall and 480 m (1,575 ft) long concrete-face rock-fill dam (CFRD), with a storage capacity of 10,944,000 m3 (8,872 acre⋅ft) of which 8,670,000 m3 (7,029 acre⋅ft) is active (or 'usable') for pumping. The upper reservoir is formed by a CFRD as well, which is 114.2 m (375 ft) tall and 330 m (1,083 ft) long, withholding a 10,598,000 m3 (8,592 acre⋅ft) man-made lake. The normal elevation of the lower reservoir is 339.3 m (1,113 ft) and the upper 961 m (3,153 ft). This difference in elevation affords a rated hydraulic head of 599 m (1,965 ft). The power station is located underground near the bank of the lower reservoir and contains six 300 MW Francis pump turbine-generators.[6]

See also

References

  1. ^ "Jixi pumped-storage hydro plant begins operation in China". HydroWorld. Retrieved 20 January 2012.
  2. ^ "Jixi 7 billion to build pumped storage power station" (in Chinese). Jixirj. Archived from the original on 26 January 2013. Retrieved 20 January 2012.
  3. ^ "National Development and Reform Commission approved the Jixi pumped-storage power plant project to carry out preparatory work" (in Chinese). Bureau of Energy. Archived from the original on 4 March 2016. Retrieved 20 January 2012.
  4. ^ "安徽省最大抽水蓄能电站下水库大坝填筑完成 - 北极星电力新闻网". news.bjx.com.cn. Retrieved 2017-07-23.
  5. ^ "宣城绩溪抽水蓄能电站,全力保障华东电网安全!". www.sohu.com (in Chinese (China)). Retrieved 3 May 2022.
  6. ^ "About Anhui Jixi pumped storage power station" (in Chinese). Electric Technology Co., Ltd. Archived from the original on 25 December 2014. Retrieved 20 January 2012.