Before the opening of the Jōetsu Shinkansen in 1982, the Joetsu Line had frequent service by express trains connecting Tokyo and Niigata. With the opening of the Jōetsu Shinkansen, however, the line became dominated by local and freight trains.
The Nippon Railway opened the Takasaki to Maebashi (now Shinmaebashi) section in 1884. The company was nationalised in 1906.
The first railway between Niigata and the east coast of Honshu was the Ban'etsu West Line, completed in 1914. In 1920, it was decided to build the Jōetsu Line as a more direct route between Tokyo and Niigata. The Miyauchi to Echigo-Yuzawa section opened in stages between 1920 and 1925, and the Shinmaebashi to Minakami section of the line opened in stages between 1921 and 1928.
In 1931, with the completion of the 9,702 m (31,830 ft 9 in) Shimizu tunnel, the Echigo-Yuzawa - Minakami section of the line opened, including electrification at 1,500 V DC between Echigo-Yuzawa and Ishiuchi. When completed, the line shortened the Ueno to Niigata route by 98 km (61 mi), and included two spiral sections in the tunnels.
In 1947, the Takasaki to Minakami and Ishiuchi to Miyauchi sections were electrified, making this one of the first non-urban JNR lines to be completely electrified.
The Takasaki to Shinmaebashi section was double-tracked in 1957, and the rest of the line was double-tracked between 1961 and 1967, the final section involving the construction of the 13,500 m (44,291 ft 4 in) Arashimizu tunnel. Passengers catching Miyauchi-bound trains at Yubiso and Doai stations do so from platforms situated within the Arashimizu tunnel.
Service disruptions
The 2004 Chūetsu earthquake seriously damaged the Jōetsu Line, closing the Minakami to Miyauchi section for about two months. Single-line operation at speeds limited to 30–45 km/h then resumed, being raised to 45–65 km/h four months after the earthquake, and the second track reopened, also with speed restrictions, 5 months after the quake. Full service was restored 9 months after the line had first closed.
In late July 2011, torrential rainfall damage resulted in the closure of the Echigo-Yuzawa - Muikamachi section for two weeks.
References
^上越線・吾妻線で211系の営業運転開始 [211 series enter service on Joetsu Line and Agatsuma Line]. Japan Railfan Magazine Online (in Japanese). Japan: Koyusha Co., Ltd. 24 August 2016. Retrieved 27 August 2016.
External links
Wikimedia Commons has media related to Jōetsu Line.