The Trans-Manhattan Expressway also carries US Route 1. Approximately 280,000 vehicles traverse the expressway on a daily average basis.[3] Completed in 1960, the expressway is located below ground level, in an open cut; however, the George Washington Bridge Bus Station and the highrise Bridge Apartments are built over the expressway, creating intermittent tunnels. It is maintained by the Port Authority of New York and New Jersey (PANYNJ).[4] Although the highway geographically runs east–west, it carries the north–south routings of I-95 and US 1. The westbound lanes carry the southbound designations of both routes, while the eastbound lanes carry the northbound designations.
The expressway was announced in 1957 and built in conjunction with the addition of the lower level of the George Washington Bridge.[7] Originally known as the George Washington Bridge Expressway,[8] the highway was originally planned as an open cut between 178th and 179th Streets, traversed by overpasses carrying the major north–south avenues in upper Manhattan. The City of New York approved the creation of the highway in June 1957 as part of a joint effort with the Port Authority that also called for the creation of the lower deck on the George Washington Bridge and construction of the George Washington Bridge Bus Terminal above the cut for the Expressway.[9] The expressway, the main New York approach to the George Washington Bridge, is only 0.8 miles long.[10] The projects required demolition of numerous buildings and the relocation of 1,824 families.[11] Overpasses over the open cut passing under Broadway, Wadsworth Avenue, and St. Nicholas Avenue were in place in December 1959.[12]
The George Washington Bridge Expressway, with three lanes of traffic heading in each direction to and from each deck of the double-decked bridge, opened to traffic in 1962 as part of a $60 million program to improve access roads for the George Washington Bridge, whose lower deck opened that same year.[13]
The expressway was one of the first to use air rights over a major highway. After completion of the expressway, the George Washington Bridge Bus Terminal was built.[4] After purchasing the air rights in 1961, Marvin Kratter built four high-rise apartment buildings, known as the Bridge Apartments, over the expressway. The 32-story buildings are among the first aluminum-sheathed high-rise structures built in the world.[14] Local traffic reporters frequently refer to congestion "under the Apartments" during morning and evening rush hours.[15]
After exit 2, I-95 crosses over the Harlem River and enters the Bronx, entering an interchange with the Major Deegan Expressway (I-87), which is marked both exit 1C (following with the Cross Bronx Expressway) and exit 3A–B (matching with the Trans-Manhattan Expressway). Now the Cross Bronx Expressway, I-95 and US 1 continue east under University Avenue and enter exit 2A, which serves Jerome Avenue. Crossing under the Grand Concourse, the six-lane expressway crosses into exit 2B, which is for Webster Avenue. This interchange also marks the eastern end of the I-95/US 1 concurrency. Passing south of Tremont Park, the Cross Bronx Expressway westbound serves exit 3, which serves Third Avenue.[6]
At East 176th Street, the Cross Bronx Expressway turns southeast, entering exit 4A eastbound, which marks the northern terminus of NY 895 (Sheridan Boulevard). After crossing the Bronx River, the expressway enters a full interchange, exit 4B, with the Bronx River Parkway.[6] After a curve from the parkway, the Cross Bronx Expressway begins paralleling East 177th Street[16] and enters exit 5A, which connects to White Plains Road in Parkchester. Continuing southeast, the roadway enters exit 5B, Castle Hill Avenue, which is an eastbound-only exit. After Castle Hill Avenue, the route enters exit 6A, which reaches the Hutchinson River Parkway at the Bruckner Interchange. Changing to the Bruckner Expressway, which runs to the northeast, I-95 enters the Bruckner Interchange with the northern terminuses of I-678 and I-278; the Cross Bronx Expressway Extension turns southeast along I-295 at the same interchange.[6]
After the Bruckner Interchange, I-95 crosses Tremont Avenue before crossing over I-695 (the Throgs Neck Expressway). Southbound, exit 7A serves I-695, while northbound the two Interstates merge. Continuing north, the Bruckner Expressway and I-95 parallel Bruckner Boulevard and run along the western edge of Pelham Bay Park. Entering exit 8A southbound services Westchester Avenue while northbound, exits 8B and 8C serve Pelham Parkway and Shore Road through the park, which marks the northern end of the Bruckner Expressway. Now known as the New England Thruway, I-95 leaves Pelham Bay Park and enters exit 9, a junction with the Hutchinson River Parkway. In the middle of the interchange with the Hutchinson River, exit 10 forks to the left, reaching Gun Hill Road.[6]
Now paralleling Baychester Avenue, which also services exit 11 and Bartow Avenue, the New England Thruway continues north and enters exit 12 which connects to Baychester Conner Street is connected via exit 13 before I-95 turns east and crosses over the Hutchinson River. After crossing the river, the route enters an interchange once again with the Hutchinson River Parkway (exit 14) but this time southbound only.[6]
Westchester
Crossing through the northern reaches of Pelham Bay Park, I-95 turns more northeast and enters Westchester County. Now in Pelham Manor, the route crosses through Pelham Country Club, entering exit 15, which connects to US 1 (Main Street). After US 1, the route crosses out of the Pelham Country Club, entering New Rochelle.[6]
Crossing over Metro-North Railroad tracks, the Interstate turns northeast and crossing through downtown New Rochelle, reaching exit 16, serving several local streets including Cross Avenue, Cedar Street, and Garden Street. North of exit 16, the New England Thruway enters its lone toll gantry along the alignment, serving the northbound direction only. The road continues northeast through New Rochelle, passing exit 17 as it enters the town of Mamaroneck. Exit 17 connects to Chatsworth Avenue in the Larchmont section. Passing a pedestrian footbridge for the Larchmont station, crossing over NY 125 (Weaver Street). Winding north through Mamaroneck, I-95 enters exit 18A, servicing Fenimore Road in the village of Mamaroneck.[6]
Turning northeast again, I-95 enters exit 18B, a partial cloverleaf interchange with Mamaroneck Avenue before crossing into the town of Harrison. The road turns east, crossing over NY 127 (Harrison Avenue), and enters exit 19, the western terminus of Playland Parkway, which connects the expressway to Playland as the road enters Rye. The route crosses through the Rye Village area, entering exit 20, which connects to US 1 (Boston Post Road) and the village. Almost immediately after exit 20, exit 21 marks the eastern end of the Cross Westchester Expressway (I-287). Proceeding westbound, exit 21 and nearby exit 22 (Midland Avenue and Port Chester) are merged but are separate exits going eastbound. Crossing through the eastern edges of Port Chester, I-95 reaches the Byram River and crosses into Connecticut, becoming the Connecticut Turnpike.[6]
Robert Moses first recommended the construction of what became the New England Thruway in 1940. Construction began in 1951, but major work on the highway did not commence until 1956–1957. By 1950, the New York State Thruway Authority (NYSTA) assumed control of the construction and made the New England Thruway a part of the thruway toll system.[17] Construction lasted until 1961.
I-95 was assigned on August 14, 1957, as part of the establishment of the Interstate Highway System[2] and has always run along its current path in New York. The route was overlaid on the under-construction New England Thruway northeast of New York City and assigned to the then-proposed Cross Bronx and Bruckner expressways through New York City.[18] The thruway opened in October 1958, connecting the Bruckner Expressway and the Connecticut Turnpike.[19] The final sections of the Cross Bronx and Bruckner expressways were finished in 1963 and 1972, respectively. Prior to the 1972 completion of the Bruckner Expressway, coinciding with the completion of the new Bruckner Interchange, the old Bruckner Boulevard (once part of NY 164) was used by through traffic.[20][21]
The expressway was announced in 1957 and built in conjunction with the addition of the lower level of the George Washington Bridge.[22] Originally known as the George Washington Bridge Expressway,[23] the highway was originally planned as an open cut between 178th and 179th streets, traversed by overpasses carrying the major north–south avenues in Upper Manhattan. The City of New York approved the creation of the highway in June 1957 as part of a joint effort with the PANYNJ that also called for the creation of the lower deck on the George Washington Bridge and construction of the George Washington Bridge Bus Station above the cut for the expressway.[24] The expressway, the main New York approach to the George Washington Bridge, is only 0.8 miles (1.3 km) long.[10] The projects required demolition of numerous buildings and the relocation of 1,824 families.[25] Overpasses over the open cut passing under Broadway, Wadsworth Avenue, and St. Nicholas Avenue were in place in December 1959.[26]
The George Washington Bridge Expressway, with three lanes of traffic heading in each direction to and from each deck of the double-decked George Washington Bridge, opened to traffic in 1962 as part of a $60-million (equivalent to $463 million in 2023[27]) program to improve access roads for the George Washington Bridge, whose lower deck opened that same year.[28] The Trans-Manhattan Expressway provides access to and from the Henry Hudson Parkway and Riverside Drive on the West Side of Manhattan and to and from Tenth Avenue and the Harlem River Drive on the East Side.
The expressway was one of the first to use air rights over a major highway. After completion of the expressway, the George Washington Bridge Bus Station was built.[4] After purchasing the air rights in 1961, Marvin Kratter built four highrise apartment buildings, known as the Bridge Apartments, over the expressway. The 32-story buildings are among the first aluminum-sheathed highrise structures built in the world.[14] Local traffic reporters frequently refer to congestion "under the Apartments" during morning and evening rush hours.[29]
The first change to exit numbers along the New England Thruway section of I-95 was in April 1980 when the section was converted for sequential exits.[30] Prior to the change, the Cross Bronx/Bruckner Expressway and New England Thruway sections had different exit numbering systems. More specifically, exit 19 on the Bruckner Expressway was followed immediately by exit 2 on the New England Thruway. As a result, because exit numbers on I-95 repeated themselves in close succession, the old exit numbering system frequently caused confusion.[31]
As part of an experiment, I-95 was one of the few roads in New York to receive mileage-based exit numbers. This was implemented over both the PANYNJ section and the New York State Department of Transportation (NYSDOT) section of the highway (exits 1A–8C). The thruway section (which had originally carried its own sequential exit numbers) was then renumbered by the NYSTA to a system of sequential numbers starting from 9 (where the mileage-based system left off). This led to a situation in which exits 1 through 8 were mileage-based (all but one of which contained lettered suffixes as a result) and exits 9 through 22 were sequential.
During the late 1970s, and 1980s, in various stages, the mid-mast cuptlight-luminaire, a variant of high-mast lighting, lamps were installed onto the entire New England Thruway. These lights remain there to this day, although they've been recently replaced by LED luminaires since 2015.
Around 2005, NYSDOT began a project to renumber I-95 with sequential numbers throughout. However, the idea never fully got traction with all three agencies. The PANYNJ did complete the renumbering on its section of the road. NYSDOT itself renumbered only one section of the road in Parkchester. Meanwhile, the NYSTA did not renumber any of the exits on its stretch of the road. This led to a situation from 2005 through 2012 in which some exits were signed with two different numbers, while some numbers were repeated twice, but only on some of the signs.
Finally, in 2012, NYSDOT restored the mileage-based numbers to its portion of the highway, which once again line up with the thruway portion. This has eliminated all of the exit number conflicts, with one exception. The exception exists because the PANYNJ has not changed the numbers back on its portion of the road creating a confusing situation at the Amsterdam Avenue exit, which is maintained by NYSDOT southbound but the PANYNJ northbound. The exit is signed as exit 1B southbound (which is the proper number within the mileage-based), but as exit 2 northbound (a holdover from the failed renumbering project).
Exit list
Exit numbers on the New England Thruway (north of exit 8C) are sequential,[32] but exit numbers on the remaining section are mileage-based.
I-895, also known as the Sheridan Expressway, was a short connection from I-278 to I-95 in the Bronx.[36] It was planned to continue north from I-95 to rejoin it near Pelham Bay Park, making it another bypass road.[43][44] I-895 was downgraded to NY 895 in 2017[45] and was converted to a boulevard between 2018 and 2019.