The bridge is divided into five sections: the east approach, the suspension bridge section, the middle approach, the segmental concrete section, and the west approach. Hurricanes are common occurrences, so the design wind speed at the bridge deck level was established at 61 m/s.
Incidents
On May 5, 2020, the bridge was caught on camera violently shaking up and down. At 15:32 local time, the bridge was shut down by traffic police for safety reasons. According to Chinese state-run media, engineers inspected the main structure of the bridge, and it was found to be intact. Experts told Chinese media that the shaking was normal, and would not affect the safety of driving if the shaking was contained to a tolerable range.[6] At 16:30 on May 7, the navigable waters of the bridge resumed navigation. On May 10, the bridge passed the structural safety assessment.[7] On May 15, the bridge resumed traffic, but buses with more than 40 seats and trucks were prohibited from passing.[8]