The $150 million plan was developed to facilitate more efficient travel on NS rail lines between the Norfolk, Virginia port region and two Midwest destinations—Chicago, Illinois and Columbus, Ohio.[2] One of the project goals was to increase clearances in tunnels to permit the operation of double-stackintermodal trains,[1] increasing the capacity of rail lines, shortening rail journeys and reducing tractor-trailer traffic. New shipping terminals for intermodal connections are also planned for key locations.[3]
Construction began in 2007,[4][5][6] and the route opened for double stack service on September 9, 2010.[1]
The project involved raising clearances in 28 tunnels and 24 other overhead obstacles. A total of around 5.7 miles (9.2 km) of tunnels were modified. When completed, the new routing was expected to reduce travel times from port facilities in Virginia to Chicago to three days, improving on the previous four-day travel time and to reduce the distance traveled by 250 miles (400 km).[7]
In June 2010, NS announced that it had reached an agreement with Ohio to extend a leg of the Heartland Corridor southwesterly from Columbus to Cincinnati, which is located on the Ohio River near the border where Ohio, Kentucky and Indiana converge. The $6.1 million cost will be funded with federal economic stimulus funds and the Ohio-Kentucky-Indiana Regional Council of Governments, plus money from NS.[8]