A swingbridge crosses the river near its junction with the Heaphy. This bridge is part of the Heaphy Track.[2] Heavy rain in the Buller District in February 2022 caused significant damage. The suspension bridge over the Gunner River was damaged but was deemed repairable, while the Pitt Creek bridge was swept away, and the suspension bridge over the Heaphy River was destroyed. The track re-opened in October 2023, after the replacement of bridges and restoration of tracks damaged in the 2022 floods.[3]