The seating capacity is 12,000. The Gangneung Ice Arena is designed to house two ice rinks (60 m × 30 m [197 ft × 98 ft]), one for competition and one for training. The building has four floors aboveground and two underground levels. An environmentally-friendly ice cooling system was adopted, and the facility is used for local recreational purposes since the Games.
The cost of construction was US$85 million and the facility was inaugurated on 14 December 2016.[2]