The Gabčíkovo–Nagymaros Dams (more precisely Gabčíkovo–Nagymaros Waterworks, Hungarian: Bős–nagymarosi vízlépcső, Slovak: Sústava vodných diel Gabčíkovo – Nagymaros) is a large barrage project on the Danube. It was initiated by the Budapest Treaty of 16 September 1977 between the Czechoslovak Socialist Republic and the Hungarian People's Republic. The project aimed at preventing catastrophic floods, improving river navigability and producing clean electricity.
Only a part of the project has been finished in Slovakia, under the name Gabčíkovo Dam, because Hungary first suspended, then tried to terminate, the project due to environmental and economic concerns.[1] Slovakia proceeded with an alternative solution, called "Variant C", which involved diverting the Danube, the border river. These caused a still unresolved international dispute between Slovakia and Hungary. Both parties turned to the International Court of Justice for a ruling.
Budapest Treaty
The joint Hungarian–Czechoslovak project was agreed upon on 16 September 1977 in the "Budapest Treaty". The treaty envisioned a cross-border barrage system between the towns of Gabčíkovo, Czechoslovak Socialist Republic (now Slovak Republic) and Nagymaros, People's Republic of Hungary (now Hungary). The dams would eliminate regular flooding (like the disastrous ones of 1954 and 1965) and provide a clean source of electric power. They would also allow year-long navigability of the river and serve as a part of the Rhine-Main-Danube Canal system of inland navigation.
The plan was to divert part of the river into an artificial canal at Dunakiliti (a village in Hungary) to the hydroelectric power plant near Gabčíkovo (eight turbines, 720 MW). The canal would return the water into a deepened original riverbed and at Nagymaros a smaller dam and power-plant (158 MW) would be constructed. The plant in Gabčíkovo was to be a peak-power plant and the dam in Nagymaros, about 100 km downstream, was to limit fluctuations of the water level.
Because most of the construction was planned to occur in Slovak territory, the Hungarian government was obligated to participate in some construction in Slovakia, to ensure equal investment by both sides. Electricity produced was to be shared equally between the two countries.
An important provision of the treaty was its Article 15.1, which stated: "the Contracting Parties shall ensure, by the means specified in the joint contractual plan, that the quality of the water in the Danube is not impaired as a result of the construction and operation of the System of Locks".[2]
Limited project
In 1981 the two countries agreed to slow down the project because of their economic problems.[3][unreliable source?] In 1984 a movement protesting against the dam, the "Danube Circle" (Duna Kör), was founded in Hungary, which was later awarded the Right Livelihood Award[4] and the Goldman Environmental Prize[5] for protecting the Danube. The group objected to the withholding of information on the project from the public by the Communist government to avoid debate on its environmental impact. Biologists worried that the dams would damage both the treasured scenery of the Danube Bend and the underground water reserves on which more than a million Hungarians depend,[6] especially around Budapest. After an intensive campaign the project became widely hated in Hungary as a symbol of the old regime. In Slovakia, construction continued and many people were involved in building the hydro-electric plant. The Hungarian government eventually decided to suspend work until the environmental effects of the project were fully assessed.[7] Soon after, the Slovak authorities decided to unilaterally proceed with an alternative solution, called "Variant C".[7] This effectively diverted the Danube into Slovak territory and kept the development entirely within its borders.[7] This scheme dramatically reduced the amount of water flowing into Hungary and had a significant impact on that nation's water supply and environment.[7] As a result, the Hungarian government attempted to terminate the 1977 Treaty.
The 7 proposals originally put forward by experts from Czechoslovakia in 1992 were as follows.
Proposal
Description
Comment
A
Complete the original plans from 1977 together with Hungary.
Slovak preference
B
Complete only the Czechoslovak part of the waterworks.
C
Reduce the reservoir, build the waterworks only on the territory of the Slovak Republic and postpone construction at Nagymaros in Hungary. Split the shared reservoir into two with a dam and instead of the dam in Dunakiliti build a dam in Čunovo. This variant is called temporary, as it is technically possible to build the Dunakiliti dam and flood the Čunovo dam in order to finish the waterworks according to the 1977 treaty.
winning project
D
Complete only the upper part of the dam and finish the Dunakiliti dam.
E
Use the waterworks only for flood prevention and ensure navigability.
F
Stop construction and retain the site in its current state.
G
Remove all buildings and return the river to its original state.
Hungarian preference
In the end it was decided to switch to an alternative solution on a smaller scale, Proposal C. The artificial canal would start at Čunovo, part of the Slovak capital city Bratislava, and the Gabčíkovo power plant would operate in run-of-the-river mode with no water level fluctuation. Construction started in November 1991. In October 1992 diversion of part of the water into the canal started and the Čunovo reservoir was filled; the secondary structures (such as the power-plant) were finished and made operational in 1996.
Parts of the waterworks
Built parts
Supply channel for Čunovo Dam conveys water from Bratislava about 10 km to Čunovo.
Čunovo Dam is the first level of the Waterworks, producing 24 MW of electricity, and there is an additional smaller power plant with 1 MW power output. Čunovo includes also the Čunovo Water Sports Centre, a site of world championships in water slalom and rafting.
Hrušov reservoir (replacing the joint Slovak-Hungarian Dunakiliti reservoir) accumulates water for the main power plant in Gabčíkovo and also regulates water level. It is 16 km long and from 1 to 4 km wide. Its capacity is 196 million cubic metres. As part of the Proposal C redesign, the reservoir was reduced in size and separated from Hungarian territory by a 10.5 km long embankment.
Gabčíkovo Dam is the main part of the waterworks. It consists of two main structures: a hydropower plant and two lock chambers. This level of the waterworks was designed to use differential water level to produce electricity, to allow ships to pass safely through locks and to divert flood water. The chambers are on the left bank of the Danube and the difference in water levels is about 20 metres. The power plant on the right riverbank was designed to produce 2650 GWh annually. A 10 m wide road bridge passes over the complex. Operation of the power plant is fully automated. In 2012, after 20 years of service, 300.000 ships have passed through the locks with totally 5.000.000 passengers.[8]
Outlet channel leads water back to the old riverbed and also helps against floods. The channel is 185 m wide at the bottom and 8.2 km long and re-enters the Danube at Sap.
The waterworks on the Danube were designed to have an additional level at Nagymaros, consisting of a reservoir 95 km long and the Nagymaros power plant. This level was to be located between the Hungarian towns of Visegrád and Nagymaros and its purpose was to use the gradient of the reservoir for production of electricity and also to allow ships to pass. The Gabčíkovo works were designed for control and peak running of the power plant, and the Nagymaros works as an equalising power plant to provide better conditions for shipping and to regulate peak outflow from Gabčíkovo. Because the Nagymaros works were not built, the Gabčíkovo power plant cannot work at peak efficiency, which causes appreciable economic damage.[citation needed]
Non-existence of Nagymaros dam also causes main obstacle of inland navigation on the 2400 km Danube Pan-European corridor due to low levels of water. Hungary requests Slovakia to manage regulation works on problematic stretch of Danube that were supposed to be solved by Nagymaros backwater. Transportation damages include also missing upgrade of river Váh waterway in Slovakia.[9]
Lawsuit
After Czechoslovakia split up in 1993, the newly established Slovak Republic carried on with the project. In 1989 Hungary abandoned the site when scientists on both sides of the border expressed fears about the environmental consequences.[10] After Hungary tried to terminate the 1977 treaty in May 1992, both[6]
parties (Hungary and Slovakia) agreed to take their dispute to the International Court of Justice in The Hague.
In 1994, the Socialists came back into power in Hungary but could hardly back out of the court case, which was hailed as a landmark: for the first time, the court would rule over an environmental dispute. Hearings on the case were held between 3 March and 15 April 1997, and the Court paid a site visit (the first ever in its history). Besides other issues, the Hungarian representatives wanted the court to decide whether or not Czechoslovakia was entitled to embark on Proposal C, and to rule that the 1977 treaty was not binding on Slovakia and Hungary. The court handed down a decision in 1997:
The Court found that Hungary had breached their legal obligations in almost all points. It ordered Hungary to finish the Nagymaros part of waterworks. Per the Court decision, Czechoslovakia and later Slovakia was entitled to build alternative workaround after Hungary stopped work, but Slovakia breached on one point - it should not have started to operate an alternative temporary solution before the court handed down its ruling. It called on both States to negotiate in good faith to complete the objectives of the 1977 Budapest Treaty, which the Court declared was still in force, while taking account of the factual situation that had developed since 1989.[11]
Each Party must compensate the other Party for the damage caused by its conduct.[12][13]
Another four months of negotiations between Slovakia and Hungary led to a treaty between the two countries about the ICJ judgment. In March 1998 the government of Slovakia approved this treaty, but the government of Hungary, which was supposed to build Nagymaros or a Pilismarót waterworks, delayed approving the treaty and proclaimed a competition for the project. After elections in Hungary, the new government cancelled this competition.[13] In 1998, after two appeals to Hungary, the Slovak government turned to the International Court, demanding the Nagymaros part be built.
The international dispute was not resolved for more than a decade.[14] In June 2017, the Slovak Government requested that the International Court of Justice "place on record the discontinuance of the proceedings". In a letter dated 12 July 2017, the Agent of Hungary stated that his Government "did not oppose the discontinuance of the proceedings instituted by means of the Request of Slovakia of 3 September 1998 for an additional judgment".[15]
The area of the Čunovo reservoir is 40 km2, exclusively on the Slovak side (the original Hrušov-Dunakiliti reservoir was to be 60 km2). The operational water level is 131.1 metres above sea level (minimal and maximum levels are 129 and 131.5 m respectively).
The power station has eight vertical Kaplan turbines with runners 9.3 m in diameter and a maximum capacity of 90 MW each. Total capacity is 720 MW at operational discharge of 4000 m3/s. Water level differences are 24 and 12.88 m.
The original river bed has a discharge of between 250 and 600 m3/s.
Two navigation locks were built. A bypass canal will handle floods.
In 1996, Europe's largest artificial whitewater slalom course, the Water Sports Centre Čunovo, was built on a river island at the head of the bypass canal. When operating at capacity, it diverts 22 m3/s into the bypass canal.
The Gabčíkovo Hydroelectric Power Station produces 2600 GWh of electricity annually, making it the largest hydroelectric plant in Slovakia. It supplies around 8% of the country's electricity consumption.
Environmental consequences
Regarding the environmental consequences of the dam, results of a 1996–2002 study by K. Holubová, Z. Capeková and J. Szolgay[16] were:
Intensive degradation of the Danube River bed downstream (especially at the Old Danube river bed) caused by the absence of the Nagymaros waterworks.[16]
Annual joint studies of the Slovak-Hungarian governments claim:
Stabilization of groundwater levels, local improvement of groundwater quality,[17][18][19]
Stabilization of the riverbed of the old Danube.[18][19][20]
Improved living conditions of aquatic animals and forest animals in areas around old Danube.[20][verification needed]
Differences between 2002 study and newer works may be attributed to size of studied area. As 1996–2002 study was done on area from Vienna to end of Slovak-Hungarian Danube. Government studies are targeting only Gabčíkovo waterworks and immediate area around it.
Groundwater levels are dependent on big floods, like in 2002, which removed fine silt from river bottom and allowed increased filtration. After that groundwater levels on many places reached pre-reservoir filling levels, on some places reached even higher.[21]
Damming of the Danube improved ground water quality at Rusovce and Čuňovo water supply[22] which are on right side of Danube. It was due changed infiltration conditions and changed groundwater flow direction from NW-SE to N-S.[23] The ground water quality at water supplies situated on the left side of the Danube were not influenced to the same extent as on the right side.
One of the same problems identified is increased sedimentation upstream and riverbed erosion downstream from reservoir, which is a typical problem of water reservoirs.
^ ab"New Scientist". New Science Publications. 3 February 1994 – via Google Books.
^ abcdOwen McIntyre: Gabčíkovo – Nagymaros Project: A Test Case for International Water Law?, In: Anton Earle, Anders Jagerskog and Joakim Öjendal (editors): Transboundary Water Management: Principles and Practice, Stockholm International Water Institute, 2010, page 228 [2]
Artikel ini sebatang kara, artinya tidak ada artikel lain yang memiliki pranala balik ke halaman ini.Bantulah menambah pranala ke artikel ini dari artikel yang berhubungan atau coba peralatan pencari pranala.Tag ini diberikan pada Januari 2023. Trachysomus camelus Klasifikasi ilmiah Kerajaan: Animalia Filum: Arthropoda Kelas: Insecta Ordo: Coleoptera Famili: Cerambycidae Genus: Trachysomus Spesies: Trachysomus camelus Trachysomus camelus adalah spesies kumbang tanduk panjang yang tergolong fa...
دوري الدرجة الأولى الروماني 1929–30 تفاصيل الموسم دوري الدرجة الأولى الروماني النسخة 18 البلد رومانيا التاريخ بداية:11 مايو 1930 نهاية:8 يونيو 1930 المنظم اتحاد رومانيا لكرة القدم البطل نادي بترولول بلويشتي عدد المشاركين 12 دوري الدرجة الأولى الروماني 192...
This is a list of traditional windmills in the American state of Illinois. Map all coordinates using OpenStreetMap Download coordinates as: KML GPX (all coordinates) GPX (primary coordinates) GPX (secondary coordinates) Windmills having coordinates below can be seen together in Map all coordinates using OpenSourceMap at right. Windmill Location Type Built Notes Photograph Heidemann MillOld Mill Addison Smock 1868[1] Burnt down 1958[1] Siedhoff MillOld Dutch MillBarrington Rol...
For the village in Noguera, see Àger. Municipality in Catalonia, SpainCorçàMunicipalityCentre of Corçà FlagCoat of armsCorçàLocation in CataloniaShow map of Province of GironaCorçàCorçà (Spain)Show map of SpainCoordinates: 41°59′14″N 3°0′54″E / 41.98722°N 3.01500°E / 41.98722; 3.01500Country SpainCommunity CataloniaProvince GironaComarcaBaix EmpordàGovernment • MayorMaria Carme Güell Parnau (2015)[1]Area[2...
Triptolemos berdiri di antara Demeter dan Persefone, relief di Museum Arkeologi Nasional Athena. Triptolemos (Yunani: Τριπτόλεμος) dalam mitologi Yunani adalah putra raja Keleus dari Eleusis, atau putra dari Gaia dan Okeanos.[1] Triptolemos merupakan salah satu tokoh penting dalam Misteri Eleusis dan dihubungkan dengan Demeter. Triptolemos dikaitkan dengan harapan tentang kehidupan setelah mati dalam Misteri Eleusis.[2] Dalam mitologi Ketika Demeter sedang menca...
Pemberontakan NovemberLukisan oleh Marcin ZaleskiTanggal29 November 1830 – 21 Oktober 1831LokasiPolandia, Lituania dan tepi kanan UkrainaHasil Kemenangan Rusia, penghapusan otonomi PolandiaPihak terlibat Polandia Kongres Angkatan Darat Polandia Kongres Kekaisaran Rusia Angkatan Darat Kekaisaran RusiaTokoh dan pemimpin Józef Chłopicki Michał Gedeon Radziwiłł Jan Zygmunt Skrzynecki Ignacy Prądzyński Kazimierz Małachowski Maciej Rybiński Jan Nepomucen Umiński Nikolas I dari Rusia Han...
العلاقات الكوستاريكية الكولومبية كوستاريكا كولومبيا كوستاريكا كولومبيا تعديل مصدري - تعديل العلاقات الكوستاريكية الكولومبية هي العلاقات الثنائية التي تجمع بين كوستاريكا وكولومبيا.[1][2][3][4][5] مقارنة بين البلدين هذه مقارنة عامة ومرجع...
Grand Prix d'Australie 2013 Circuit de l'Albert Park Données de course Nombre de tours 58 Longueur du circuit 5,303 km Distance de course 307,574 km Résultats Vainqueur Kimi Räikkönen,Lotus-Renault,1 h 30 min 3 s 225 (vitesse moy. : 204,927 km/h) Pole position Sebastian Vettel,Red Bull-Renault,1 min 27 s 407 (vitesse moy. : 218,413 km/h) Record du tour en course Kimi Räikkönen,Lotus-Renault,1 min 29...
Vanessa LacheyMinnillo mengadiri acara Maxim Magazine 10th Annual Hot 100 Celebration, Santa Monica, CA pada 13 Mei 2009Lahir9 November 1980 (umur 43)PekerjaanAktris, model, pembawa acaraTahun aktif2001–sekarangSuami/istriNick Lachey (m. 2011–sekarang) Vanessa Joy Lachey (lahir 9 November 1980) adalah seorang pesohor Amerika, pembawa acara, model, dan aktris. Dia juga merupakan mantan Miss Teen USA pada tahun 1997. Dia telah pula menjadi koresponden berbasis di New York untuk E...
Disambiguazione – Gürcü Mehmed Pascià II rimanda qui. Se stai cercando il Gran Visir che governò dal 21 settembre 1622 al 5 febbraio 1623, vedi Gürcü Mehmed Pascià. Gürcü Mehmed Pascià Gran visir dell'Impero ottomanoDurata mandato27 settembre 1651 –20 giugno 1652 MonarcaMehmed IV PredecessoreAbaza Siyavush Pascià I (I mandato) SuccessoreTarhuncu Ahmed Pascià Gürcü Mehmed Pascià (il Georgiano; ... – Buda, 1665) è stato un politico ottomano. Fu schia...
Fictional character from the Gerry and Sylvia Anderson television series Thunderbirds Fictional character John TracyThunderbirds characterThe classic puppet characterFirst appearanceTrapped in the Sky(30 September 1965)Created byGerry and Sylvia AndersonDesigned byMary Turner (puppet sculptor)[1]Portrayed byLex Shrapnel(2004 live-action film)Voiced byRay Barrett (original series)[2]Keith Alexander (Thunderbird 6)Thomas Brodie-Sangster(remake series)In-universe informationOccup...
Stub article of a Malaysian government agency Department of Statistics MalaysiaJabatan Perangkaan Malaysiaجابتن ڤراڠكأن مليسياCoat of arms of MalaysiaAgency overviewFormed1949; 75 years ago (1949)Preceding agencyBureau of StatisticsJurisdictionGovernment of MalaysiaHeadquartersBlock C6, Complex C, Federal Government Administrative Centre, 62514 Putrajaya, Malaysia.Employees3,190 (2020)Annual budgetMYR 193,488,000Agency executiveMohd Uzir Mahidin, Chief Stat...
City in Washington, United StatesChehalis, WashingtonCity FlagSealNickname(s): the Rose City, the Mint City[1]: 31 Location of Chehalis, WashingtonCoordinates: 46°39′36″N 122°57′48″W / 46.66000°N 122.96333°W / 46.66000; -122.96333CountryUnited StatesStateWashingtonCountyLewisArea[2] • Total5.88 sq mi (15.23 km2) • Land5.81 sq mi (15.04 km2) • Water0.07...
Geographical and cultural region in Africa and the Middle East This article is about geographical region. For the geopolitical entity, see Arab League. Arab worldArea13,132,327 km2 (5,070,420 sq mi)[1]Population456,520,777[2]Population density29.839/km2 (70.37/sq mi)[3]GDP (nominal)$2.782 trillion[4]GDP per capita$6,647[5]DemonymArabCountries 22 sovereign states Minimum definition: Algeria Bahrain Egypt Iraq ...
Steve Bannon Kepala Strategiwan Gedung PutihPetahanaMulai menjabat 20 Januari 2017PresidenDonald TrumpPendahuluJabatan dibentukPenggantiPetahanaPenasihat Senior PresidenPetahanaMulai menjabat 20 Januari 2017Menjabat bersama Kellyanne Conway, Dina PowellPresidenDonald TrumpPendahuluJohn Podesta (2015)PenggantiPetahana Informasi pribadiLahirStephen Kevin Bannon27 November 1953 (umur 70)Norfolk, Virginia, A.S.Partai politikRepublikSuami/istriCathleen Houff Jordan(cerai)Mary ...
Basketball rule violation Look up carrying in Wiktionary, the free dictionary. Carrying is a rule violation in the game of basketball. It occurs when a player places a hand underneath the basketball while dribbling, pauses the dribble, and then resumes the dribble. If a carrying violation occurs, it will count as a turnover and the opposing team will be in possession of the ball.[1][2] References ^ Carrying or Palming the Ball. Jr. NBA. Retrieved March 22, 2024. ^ What is a Ca...
For other people named John Aird, see John Aird (disambiguation). British politician John AirdAird in his late yearsBorn(1833-12-03)3 December 1833Died6 January 1911(1911-01-06) (aged 77)NationalityEnglish Sir John Aird, 1st Baronet (3 December 1833 – 6 January 1911) was an English civil engineering contractor of the late 19th and early 20th centuries. He also served as Conservative Member of Parliament (MP) for Paddington North from 1887 to 1906, was the first Mayor of Paddington in 1...
Jake LaMottaJake LaMotta in una cartolina del 1952Nazionalità Stati Uniti Altezza173 cm Peso76 kg Pugilato CategoriaPesi medi Termine carriera14 aprile 1954 CarrieraIncontri disputatiTotali106 Vinti (KO)83 (30) Persi (KO)19 (4) Pareggiati4 Palmarès 1949-1951Titolo mondiale Unificato Pesi medi Modifica dati su Wikidata · Manuale Giacobbe Jake LaMotta, soprannominato Il Toro del Bronx e Toro scatenato (New York, 10 luglio 1922 – Aventura, 19 settembre 2017), è stato un pu...