Göttingen–Bodenfelde railway

Göttingen–Bodenfelde railway
Overview
Line number1801
LocaleHesse and Lower Saxony, Germany
Service
Route number
  • 356 Süd
  • until 1992: 245
  • until ?: 246
  • until 1970: 202d, ex 200c
Technical
Line length36.780 km (22.854 mi)
Minimum radius500 m (1,640 ft)
Operating speed80 km/h (49.7 mph) (maximum)
Maximum incline0.092%
Route map

0.0
Göttingen
Until ca. 1986
3.3
Hannover–Göttingen, junction since ca. 1990
3.3
Weende, until 1976
Autobahn 7 Hannover–Kassel
8.0
Lenglern
closed 1988–2005
Harste
11.2
Emmenhausen
until 1988
14.2
Lödingsen
17.8
Adelebsen
(Kr.Göttingen)
20.7
Eberhausen
1929–1973
Hessenbach
24.7
Offensen (Kr. Northeim)
28.2
Verliehausen
until 1988
Lower Saxony / Hesse state border
32.1
Vernawahlshausen
Schwülme (2 parallel)
Hesse / Lower Saxony state border (3x)
Runs parallel to Solling Railway from Northeim
36.5
Bodenfelde
Kr.Northeim
Source: German railway atlas[1]

The Göttingen–Bodenfelde railway, also called the Oberweserbahn (Upper Weser Railway) and in Göttingen the Bodenfelder Bahn[2] (Bodenfeld Railway), is a standard gauge railway in South Lower Saxony. The single-track, non-electrified branch line runs from Göttingen to Bodenfelde through the Weser Uplands. It is used mainly by local traffic, but it is also used by through traffic. The route was once used, for example, by Düsseldorf–Göttingen traffic.

The only freight is from a basalt quarry in Adelebsen.

Route

The route runs approximately from the southeast to the northwest, with important intermediate stations at Lenglern and Adelebsen.

It now branches about 3 kilometres north of Göttingen station at the former Weende station from the Hanoverian Southern Railway (part of the old North–South railway). Until the construction of the Hanover–Würzburg high-speed railway, it had its own track to Göttingen station. It successively crosses the high-speed railway, federal highway 3 and the Leine. On the western edge of the Leine valley it passes under Autobahn 7 and rises briefly to Lödingsen. Between Emmenhausen and Offensen it runs through the Münden Nature Park. From Adelebsen to Bodenfelde the line follows the Schwülme river to the Weser river. This section is sometimes referred to as the Schwülmetalbahn (Schwülme Valley Railway). Vernawahlshausen station is located in the state of Hesse. From there it runs parallel to the Solling Railway, which it joins at Bodenfelde station.

History

During the planning of the Hanover–Hann. Münden–Kassel railway (opened from Hanover to Göttingen in 1854 and to Hann. Münden in 1856) options to the west of the town were discussed. In the mid-1860s, a connection between Göttingen and the Frederick William Northern Railway (Friedrich-Wilhelms-Nordbahn) at Bad Karlshafen via Adelebsen was discussed. This was demanded repeatedly especially in Adelebsen as its quarries had already become important. This line would have been useful for long-distance traffic, as the Halle–Kassel railway was extended via Arenshausen to Göttingen in 1867, but an extension to Kassel was very controversial. Nevertheless, the Arenshausen–Münden link (connecting to Kassel) was completed in 1872. The Solling Railway via Uslar and Hardegsen was opened further north in 1878. This meant that east-west traffic skirted Göttingen and Adelebsen. The construction of another mainline railway in the same general direction was not expected. Demands and discussions followed for three decades. Among other things, the western extension of the narrow-gauge Garte Valley Railway (Gartetalbahn, connecting Duderstadt and Göttingen) via Adelebsen and Uslar to Schönhagen was planned from 1897 (the last section of this route was similar to the later Uslar–Schönhagen (Han) railway.

From about 1901, the Prussian state railways became interested in this region. On 25 June 1904, the Prussian parliament approved a package of several secondary and light railways, including one from Göttingen to Bodenfelde. In 1906 the route was surveyed and construction began in the spring of 1908. It was briefly interrupted by a flood on the line, but the terrain was unproblematic. The branch line with a maximum slope of 1:109 was less steep than the adjacent Solling Railway and the Dransfeld ramp of the Hanoverian Southern Railway. The Göttingen–Bodenfelde railway was opened on 15 August 1910.

Operation until 1945

The branch line was one of the most profitable in the country in the 1920s. 2,000 tonnes were loaded daily from three basalt quarries in Adelebsen. In addition, through traffic developed. The stations in Lenglern, Adelebsen and Verliehausen were upgraded from 1926 to 1928.

During the Second World War, a munitions plant was connected to the line near Lenglern. During fighting in April 1945, this line, among other things, was also damaged by the bombardment of an ammunition train. Supposedly damage in Emmenhausen arose when the U.S. troops participated in the making of a film about the war and they set alight wagons carrying ammunition. The railway was restored to operation in mid-June.

An Uerdingen railbus on the Göttingen side of Vernawahlshausen station in about 1970. Behind (higher) is the Solling Railway

1950s to the 1980s

In the 1950s and early 1960s, traffic increased again, but did not reach the level of the pre-war period. The basalt quarry in Adelebsen was reopened and today it is the only quarry in operation. In contrast, a sawmill closed. From the mid-1960s passenger numbers declined. Eberhausen station was closed In 1973, Weende followed in 1976 and Lenglern, Emmenhausen and Verliehausen in 1988. Since 1976, only the services from Göttingen route have stopped in Vernawahlshausen (see picture), those on the Solling Railway have since run through without stopping at the former junction station, the station building was demolished in the same year. Deutsche Bundesbahn several times favoured decommissioning the line in the medium-term or using the line only for long distance traffic between the Ruhr and Göttingen. Neither of these options have been implemented to date.

Until the opening of the new Egge Tunnel on the line between Kassel and Paderborn, many trains between Kassel and the Ruhr region were diverted via Adelebsen if the direct route through the Egge range was blocked by landslides, as in 1988.

During the construction of the Hannover–Würzburg high-speed line a long bridge was built for the railway line to Bodenfelde, which later also crossed Federal highway 3.

For the construction of the Hanover–Würzburg high-speed railway, the former access route to Göttingen station was demolished. The traffic of the branch line was first diverted from Weende temporarily via the new line until the former railway embankment was extended by a bridge over the high-speed line and the new Federal highway 3 and connected to the railway at the former Weende station to the Hanover–Kassel railway. Thus, the trains to Bodenfelde were the first to run on the new line in Göttingen.

Today

In December 2005, after prolonged pressure on Deutsche Bahn and the Lower Saxony state transport company (Landesnahverkehrsgesellschaft Niedersachsen), they reopened the station in Lenglern, which had been closed in 1988.[2] The line, which was still working with mechanical signalboxes in Adelebsen and Bodenfelde, has been controlled by an electronic interlocking in Göttingen since October 2008. The maximum speed on most of the line remains 60 km/h for the time being, contrary to the original announcements. While two level crossings were made technically secure with half barriers in Erbsen and Lödingsen in October/November 2013,[3] the technical backup at some other level crossings is still unclear. The lack of several engineering backup systems have led to speed restrictions. Since late 2009, the section between Offensen (25.6 kilometres) and Bodenfelde can be run at 80 km/h. There is no wheelchair access to trains in Lenglern and Adelebsen. Trains can only be reached by stairs in Bodenfelde. Maps and directions to buses or taxis for the onward journey are missing at the halts at Leglern, Lödingsen, Offensen (Kr. Northeim) and Vernawahlshausen.

Operations

Since 15 December 2013, services on the line have been by operated by NordWestBahn GmbH.[4] This has run at weekdays at hourly intervals. This represented an intensification of operations as the previous operator DB Regio had operated a two-hour regular interval service with additional Regionalbahn services for students since December 2007. Due to the lack of crossing facilities (which was only possible in Adelebsen), the journey time between Bodenfelde and Göttingen was lengthened by about six to eight minutes with the reintroduction of hourly services and now amounts to around 50 minutes.

The trains continue from Bodenfelde on the Solling Railway to Ottbergen, where there are good connections both towards Paderborn and towards Höxter, Holzminden and Kreiensen. The NordWestBahn operates three-part Bombardier Talent diesel railcars. DB Regio operated two-part LINT railcars until 14 December 2013. Until 2005, most DB services were operated with class 614 and 628 diesel multiple units.

A Paderborn–Kreiensen/Göttingen service was established with sections uncoupling in Ottbergen (thus offering a transfer-free connection between Paderborn and Göttingen) at the timetable change in December 2015 (RB 84/RB 85).

In 1910, there were five pairs of passenger trains with a travel time of 82 minutes, in 1937 there were ten pairs, in the 1950s there were 13 to 16 pairs, including several long-distance express trains that stopped only in Adelebsen. Until 1989, an Eilzug (semi-fast) service ran between the Ruhr and Göttingen, which was upgraded to an express (D-Züge) in 1983. The carriages ran to Bodenfelde as through coaches in the last few years.

References

Footnotes

  1. ^ Eisenbahnatlas Deutschland (German railway atlas). Schweers + Wall. 2009. ISBN 978-3-89494-139-0.
  2. ^ a b Katharina Klocke (24 January 2010). "Strecke sang- und klanglos eröffnet. 100 Jahre Bodenfelder Bahn/Gustav Meier forscht für das Jubiläumsjahr". Göttinger Tageblatt (in German). p. 10. Retrieved 14 April 2014.
  3. ^ "Endlich Schranken für zwei Bahnübergänge". Hessische/Niedersächsische Allgemeine (in German). 9 October 2013. Retrieved 14 April 2014.
  4. ^ "Gemeinsam durch Ostwestfalen-Lippe" (PDF) (in German). NordWestBahn. Archived from the original (PDF) on 16 December 2013. Retrieved 14 April 2014.

Sources

  • Gustav Meier; Gerd Busse; Harald Henne; Klaus-Peter Lorenz (1989). Eisenbahn Göttingen – Bodenfelde, Bahnlinie – Lebenslinie (in German). Nordhorn: Verlag Kenning. ISBN 3-927587-03-6.
  • Gerd Aschoff; Gerd Busse; Gustav Meier. Höchste Eisenbahn. Zur Geschichte und Gegenwart der Bundesbahn-Nebenstrecke Göttingen–Adelebsen–Bodenfelde (in German). PRO BAHN - Regionalgruppe Göttingen.

Read other articles:

Get Up Stand UpPoster filmSutradaraTeezar SjamsuddinProduserBagus BramantiDitulis olehArgalaras KusumahanandaPemeranBabe CabiitaAbdur ArsyadAcha SinagaPerusahaanproduksiKG StudioTanggal rilis7 April 2016Durasi100 MenitNegara IndonesiaBahasaBahasa Indonesia Get Up Stand Up adalah sebuah film komedi romantis Indonesia yang dirilis pada 7 April 2016. Film yang diproduksi oleh KG Studio ini menampilkan kisah asmara para komika. Film yang disutradarai oleh Teezar Sjamsuddin dibintangi Babe Ca...

 

For other uses, see Beihai (disambiguation). Prefecture-level city in Guangxi, People's Republic of ChinaBeihai 北海BwzhaijPakhoiPrefecture-level cityBeihai Silver BeachLocation of Beihai in GuangxiCoordinates (Beihai government): 21°28′52″N 109°07′12″E / 21.481°N 109.120°E / 21.481; 109.120CountryPeople's Republic of ChinaRegionGuangxiMunicipal seatHaicheng DistrictArea • Prefecture-level city3,337 km2 (1,288 sq mi)Elevatio...

 

The TigerFront page of the February 12, 2015, issueTypeWeekly student newspaperFormatBroadsheetSchoolClemson UniversityEditor-in-chiefBlake MauroAssociate editorJustin RobertsonManaging editorSydney WestphalBusiness ManagerKaylee MorrisFoundedJanuary 21, 1907; 117 years ago (1907-01-21)LanguageEnglishHeadquarters720 McMillan Road311 Hendrix Student CenterClemson, SC 29634CountryUnited StatesWebsitethetigercu.comMedia of the United StatesList of newspapers The Tiger is the s...

Cet article est une ébauche concernant le jeu vidéo. Vous pouvez partager vos connaissances en l’améliorant (comment ?) (voir l’aide à la rédaction). Si ce bandeau n'est plus pertinent, retirez-le. Cliquez ici pour en savoir plus. Cet article ne cite pas suffisamment ses sources (mars 2017). Si vous disposez d'ouvrages ou d'articles de référence ou si vous connaissez des sites web de qualité traitant du thème abordé ici, merci de compléter l'article en donnant les référ...

 

2017 single by Sir Sly&RunSingle by Sir Slyfrom the album Don't You Worry, Honey ReleasedJune 30, 2017[1]Genre Alternative rock indie pop synthpop Length3:52LabelInterscopeSongwriter(s) Hayden Coplen Landon Jacobs Jason Suwito Producer(s)Tiffany SuhSir Sly singles chronology Astronaut (2017) &Run (2017) Change (2018) Music video&Run on YouTube &Run (pronounced and run) is the seventh single by American indie pop band, Sir Sly. The song was released as the fourth single...

 

هذه المقالة بحاجة لصندوق معلومات. فضلًا ساعد في تحسين هذه المقالة بإضافة صندوق معلومات مخصص إليها. بعثة المراقبة الدائمة لمنظمة التعاون الإسلامي لدى الاتحاد الأوروبي (بالإنجليزية: Permanent Observer Mission of the Organization of Islamic Cooperation to the European Union، بالفرنسية: Mission Permanente d'Observation de l'Organisation de...

Long-distance hiking trail in Canada and the United States This article needs additional citations for verification. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed.Find sources: Chilkoot Trail – news · newspapers · books · scholar · JSTOR (September 2011) (Learn how and when to remove this message) Chilkoot Trail1. Dyea, 2. Finnegan's Point, 3. Canyon City, 4. Pleasant Camp, 5....

 

丹尼爾·奧蒂嘉José Daniel Ortega Saavedra尼加拉瓜總統现任就任日期2007年1月10日前任恩里克·博拉尼奥斯任期1985年1月10日—1990年4月25日前任自己(國家重建軍政府协调员)继任比奥莱塔·查莫罗國家重建軍政府协调员任期1979年7月18日—1985年1月10日前任安纳斯塔西奥·索摩查·德瓦伊莱继任改任總統 个人资料出生 (1945-11-11) 1945年11月11日(78歲) 尼加拉瓜瓊塔萊斯省[1]政...

 

J. Searle DawleyDawley, s. 1919LahirJames Searle Dawley(1877-10-04)4 Oktober 1877[1]Del Norte, Colorado, Amerika SerikatMeninggal20 Maret 1949(1949-03-20) (umur 71)Hollywood, California, Amerika SerikatPekerjaanSutradara, produser, penulis naskah, pemeran panggung, pengarang sandiwaraTahun aktif1894–1938Suami/istriGrace Owen Givens(1918–1949; kematiannya)AnakTidak ada James Searle Dawley (4 Oktober 1877 – 30 Maret 1949) adalah seorang sutradara, produser...

Class of toxins found in some snake venoms Fasciculin 1, Dendroaspis angusticeps (green mamba). Fasciculins are a class of toxic proteins found in certain snake venoms, notably some species of mamba. Investigations have revealed distinct forms in some green mamba venoms, in particular FAS1 and FAS2[1] Fasciculins are so called because they cause intense fasciculation in muscle fascicles of susceptible organisms, such as the preferred prey of the snakes. This effect helps to incapacita...

 

West Germanic language For other uses, see Low German (disambiguation) and Low Saxon (disambiguation). Low GermanLow SaxonPlattdütsch, Plattdüütsch, Plattdütsk, Plattdüütsk, Plattduitsk (South-Westphalian), Plattduitsch (Eastphalian), Plattdietsch (Low Prussian); Neddersassisch; NedderdüütschNative toNorthern and western GermanyEastern NetherlandsSouthern DenmarkEthnicityDutchGermansFrisiansRussian MennonitesHistorically SaxonsNative speakersEstimated 4.35–7.15 million[a ...

 

1563 work by English historian John Foxe Actes and Monuments of these Latter and Perillous Days, Touching Matters of the Church A page of the first English-language edition, printed by John Day in 1563AuthorJohn FoxeLanguageEarly Modern EnglishSubjectMartyrology; history of ProtestantismPublisherJohn DayPublication date20 March 1563 (1563-03-20)Publication placeEnglandMedia typePrint (folio)OCLC751705715Dewey Decimal272.6LC ClassBR1600 .F62TextActes and Monuments of t...

Pujaan HatiAlbum studio karya Kangen BandDirilisMaret 2009GenrePopLabelWarner Music IndonesiaKronologi Kangen Band Bintang 14 Hari (2008)Bintang 14 Hari2008 Pujaan Hati (2009) Jangan Bertengkar (2011)Jangan Bertengkar2011 Pujaan Hati merupakan sebuah album musik ketiga karya Kangen Band yang dirilis pada tahun 2009. Lagu utamanya di album ini ialah Terbang Bersamaku, Pujaan Hati dan Nilailah Aku. Daftar Lagu seluruh lagu diciptakan oleh Dodhy Terbang Bersamaku Nilailah Aku Pujaan Hati Jum...

 

.ag

Country code top-level domain for Antigua and Barbuda This article needs additional citations for verification. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed.Find sources: .ag – news · newspapers · books · scholar · JSTOR (March 2022) (Learn how and when to remove this message).agIntroduced3 September 1991TLD typeCountry code top-level domainStatusActiveRegistryNicAgSponsorNon...

 

علوم سياسيةصنف فرعي من الدراسات السياسية جزء من الدراسات السياسية — علوم اجتماعية يمتهنه عالم سياسة فروع ethnopolitics (en) الموضوع سياسة شخصيات مهمة موريس دوفرجيهإلينور أوستروم تعديل - تعديل مصدري - تعديل ويكي بيانات جزء من سلسلة مقالات حولسياسة المخطط الفهرس  [لغات أخرى]R...

هذه المقالة يتيمة إذ تصل إليها مقالات أخرى قليلة جدًا. فضلًا، ساعد بإضافة وصلة إليها في مقالات متعلقة بها. (ديسمبر 2020) سو وين   معلومات شخصية الميلاد 10 مايو 1947   تاونغيي  الوفاة 12 أكتوبر 2007 (60 سنة) [1]  يانغون  سبب الوفاة ابيضاض الدم  مواطنة ميانمار  مناصب ر�...

 

克里斯·艾芙特Chris Evert全名Christine Marie Evert國家/地區 美国居住地 美国佛羅里達州羅德岱堡出生 (1954-12-21) 1954年12月21日(69歲) 美国佛羅里達州羅德岱堡身高1.68米(5英尺6英寸)轉職業年1972退休年1989持拍右手持拍(雙手反拍)職業獎金$8,895,195美元名人堂1995 (名人堂網站)單打成績職業戰績1309–146(89.97%)冠軍頭銜157(網球史上第二)最高排名1(1975年11月3日)�...

 

City in New South Wales, Australia This article is about the suburb. For the local government area, see City of Campbelltown (New South Wales). For the electoral district, see Electoral district of Campbelltown. CampbelltownSydney, New South WalesQueen Street in Campbelltown c. 2005Population16,577 (SAL 2021)[1]Established1820Postcode(s)2560Elevation76 m (249 ft)Location 53 km (33 mi) south-west of Sydney CBD 16 km (10 mi) north of Appin 142 km ...

American actor Albert BrooksBrooks at the Toronto International Film Festival in 2011BornAlbert Lawrence Einstein (1947-07-22) July 22, 1947 (age 76)Beverly Hills, California, U.S.Alma materCarnegie Mellon UniversityOccupationsActorcomediandirectorwriterYears active1969–presentSpouse Kimberly Shlain ​(m. 1997)​Children2ParentsHarry Einstein (father)Thelma Leeds (mother)RelativesBob Einstein (brother)Charles Einstein (half-brother)Websitealbertbroo...

 

Saskatchewan Legislature29th Saskatchewan LegislatureTypeTypeUnicameral HousesLegislative AssemblySovereignThe lieutenant governor (representing the King of Canada)HistoryFounded1905 (1905)Preceded byNorthwest Territories LegislatureMeeting placeLegislative Building, Regina, Saskatchewan, Canada The Saskatchewan Legislature is made of two elements: the lieutenant governor[1] as representative of the King of Canada, and the unicameral assembly called the Legislative Assembly....