The original Fremantle station opened in Cliff Street on 1 March 1881 as the terminus of the Eastern Railway to Guildford via Perth. As the Eastern Railway was extended its importance grew, becoming an important hub for gold miners arriving in Western Australia via ship and then travelling to the Yilgarn and Eastern Goldfields when the line opened to Kalgoorlie in 1896.
In 1907, a new station and marshalling yards were established 300 metres to the north-east on the site of the former Fremantle Railway Workshops to better service the newly constructed Fremantle Harbour.[1][2][3]
The station was designed by William Dartnall, Chief Engineer of Existing Lines of the Railway Department in 1905.[4] The construction contract, at an estimated cost of £80,000, was awarded in May 1906 to S.B. Alexander and completed on 20 April 1907, with the official opening on 1 July 1907.[1][5][6]
Originally, the station had three 150 metre platforms, one side and one island, with a subway connection and an overall roof.[7][8] This had been taken out of use by the 1960s and was later demolished. Until the 1960s, passenger services continued south of Fremantle to Kwinana. A signal cabin was relocated from the eastern end of the platform to the Bennett Brook Railway in 1985.[9]
Opposite the station once lay an extensive yard. Today, only a stabling siding and dual gauge freight line that is served by trains from Cockburn to the container terminal at North Quay remain.
Restoration
The station features Donnybrook stone construction on the façade with red face brick infill panels on a Donnybrook stone plinth, in Federation Free Classical style featuring a rare example of a large train hall roof. The facade remained unpainted (except for metalwork and timberwork) until it was painted in 1950.[12]
The station was classified by the National Trust in 1974 and entered into the Heritage Council of Western Australia's Register of Heritage Places in 2001.[1] A rationalisation of the rail reserve in 2004 was part of a plan to revitalise the precinct. In 2005, a program of staged conservation and restoration works in line with a conservation plan prepared in 1999 commenced.[13] This included paint removal and restoration of the main entry façade, refurbishment of most of the internal areas and an electrical upgrade to bring the station up to modern standards. In August 2011, the project was completed with the restoration of external facades of the station building.[11][14]
^ abc"Fremantle Railway Station". Register of Heritage Places – Permanent Entry. Heritage Council of Western Australia. 21 September 2001. Archived from the original on 1 March 2016. Retrieved 19 February 2016.
^Waldock, Reece. "Network and Infrastructure". Perth Transport Authority Annual Report Year Ended 30 June 2010. Archived from the original on 6 December 2010. Retrieved 14 December 2010.
^"Manual – Rail Access"(PDF). Public Transport Authority. 19 August 2022. Archived(PDF) from the original on 1 September 2022. Retrieved 10 September 2022.
^"Route 548". Bus Timetable 126(PDF). Transperth. 5 November 2024 [effective from 9 December 2024].
^"Route 549". Bus Timetable 125(PDF). Transperth. 9 October 2024 [effective from 9 December 2024].
^"Route 530". Bus Timetable 121(PDF). Transperth. 6 November 2024 [effective from 9 December 2024].
^"Route 531". Bus Timetable 121(PDF). Transperth. 6 November 2024 [effective from 9 December 2024].
^"Route 532". Bus Timetable 120(PDF). Transperth. 6 November 2024 [effective from 9 December 2024].
^"Route 520". Bus Timetable 119(PDF). Transperth. 8 May 2024 [effective from 15 July 2024].
^ ab"Route 999". CircleRoute Timetable 200(PDF) (CircleRoute). Transperth. 31 October 2024 [effective from 9 December 2024].
^"Route 511". Bus Timetable 37(PDF). Transperth. 22 October 2024 [effective from 9 December 2024].
^"Route 513". Bus Timetable 37(PDF). Transperth. 22 October 2024 [effective from 9 December 2024].
^"Route 107". Bus Timetable 31(PDF). Transperth. 6 November 2024 [effective from 9 December 2024].
^ ab"Route 998". CircleRoute Timetable 200(PDF) (CircleRoute). Transperth. 31 October 2024 [effective from 9 December 2024].
^"Route 111". Bus Timetable 39(PDF). Transperth. 29 May 2024 [effective from 15 July 2024].
^"Route 910". Bus Timetable 207(PDF). Transperth. 6 November 2024 [effective from 9 December 2024].
^"Route 148". Bus Timetable 39(PDF). Transperth. 29 May 2024 [effective from 15 July 2024].
^"Route 158". Bus Timetable 39(PDF). Transperth. 29 May 2024 [effective from 15 July 2024].
^"Route 160". Bus Timetable 34(PDF). Transperth. 4 September 2024 [effective from 6 October 2024].
^"Route 502". Bus Timetable 38(PDF). Transperth. 29 October 2024 [effective from 9 December 2024].
^"Route 915". Bus Timetable 212(PDF). Transperth. 25 October 2024 [effective from 9 December 2024].