The tracks that the Florida Central Railroad operate on were once part of a few independent railroads that were built mostly in the 1880s that were eventually merged into a single system.
The main route of the Florida Central Railroad from Tavares to Orlando was originally built by the Tavares, Orlando and Atlantic Railroad. It was incorporated in 1883, and built as an extension of the Leesburg and Indian River Railroad, which branched off the Florida Central and Peninsular Railroad in Wildwood and ran through Leesburg to Tavares. The FC&P leased the line in 1891, which became part of the Seaboard Air Line Railroad in 1900. This line west of Tavares west was abandoned in the 1970s. A wye on the CSX S Line (former Seaboard main line) near Wildwood Yard is what remains of the connection.[1]
The Florida Central Railroad branch from Tavares to Umatilla was originally part of the St. Johns and Lake Eustis Railway. This company was chartered in 1879 and was completed in 1882-83.[2] It extended as far north as Astor on the St. Johns River when it was first built. In 1893, the St. Johns & Lake Eustis Railway became part of the Plant System and was converted to standard gauge. The Plant System would become part of the Atlantic Coast Line Railroad in 1902.
The Atlantic Coast Line and Seaboard Air Line Railroads merged in 1967 which brought all of the trackage under a single owner, the Seaboard Coast Line Railroad. In 1980, the Seaboard Coast Line's parent company merged with the Chessie System, creating the CSX Corporation. The CSX Corporation initially operated the Chessie and Seaboard Systems separately until 1986, when they were merged into CSX Transportation.
On November 21, 1986, the newly formed Florida Central Railroad Company, Incorporated leased the lines from CSX from Toronto west and each of the branches. The line from Toronto southeast to Orlando was still run by CSX until September 28, 1990, when the Florida Central Railroad leased the rest of the line from Toronto to the CSX A Line (now the Central Florida Rail Corridor) in Orlando.
On October 1, 1998, an agreement was signed between the railroad and other affected parties to abandon the line between Ocoee and Winter Garden west of Boyd Street, and the line to Diamond R Fertilizer west of 9th St, and build a new connector east of Winter Garden. This would eliminate grade crossings in downtown Winter Garden; trains had to go to the west end of downtown and then reverse direction along the other track to reach Diamond R Fertilizer. As the West Orange Trail was built before this, there is a fence separating it from the former railroad east of downtown Winter Garden.
On November 24, 2003, the Florida Central Railroad was granted an easement for a new connector track in the northwest corner at Toronto. Once this was built, the track crossing the mainline was removed, and the Forest City Branch was abandoned.
Renovations to 57 miles between the CSX connection in Orlando, and the terminus in Umatilla, Florida, began in September, 2013. The $18.4 million project received funding from various counties, the Florida Department of Transportation, FCEN itself, as well as a $2.2 million grant[3] from the Federal Railroad Administration’s Rail Line Relocation program. The upgrades, which include replacing the current track with continuously welded rail, improving the bridge over the Dora Canal, improving grade crossings and tie replacement, as well as increase the speed limit of the line, from 10 mph to 25 mph. Upgrades to the line are in hopes of future commuter rail use, connecting Apopka, Tavares, and Orlando along FCEN track.[4]
On October 16, 2023, the Florida Central revealed a new logo and a new paint scheme that is closely based on the Seaboard Coast Line's logo and paint scheme.[6]