On 30 April 2014, the wharf closed for a five-month rebuild. The existing wharf was demolished, with a new one being built comprising a steel floating pontoon, a small concrete fixed entry platform and an aluminium gangway connecting the entry platform to the pontoon. It reopened on 17 September 2014.[2][3]