Cricket Valley Energy Center is a power plant in Dover, New York, operated by EthosEnergy. The 1,100-megawatt natural gas-fired plant came online in 2020.[1]
In 2022, Cricket Valley Energy Center retrofitted its combined cycle power plant as an early step to prepare for conversion into a hydrogen fuel cell power plant.[4]
History
Pursuant to Article 10 of the Public Service Law, Cricket Valley Energy Center LLC was granted a Certificate of Public Convenience and Necessity to build a 1,000-megawatt (MW) combined cycle natural gas-powered plant in 2013. An Article VII Certificate of Environmental Compatibility and Public Need was granted on April 20, 2016, to build 345-kV transmission lines to interconnect to the site. The 1,100-MW project went into service in April 2020. There are three combustion turbines whose exhaust creates steam to drive a steam turbine. All of the turbines are manufactured by General Electric.[5] It uses an air-cooled condenser to reduce water draw. It is located on a 193-acre former industrial area, the former Mid-Hudson Recycling Center, which was destroyed in a massive 1996 fire.[6] It is fueled by natural gas supplied from a trunk pipeline, one of many that are located along the east coast. Its power is sold into the electric wholesale market administered by the NYISO.