The class has a helipad and hangar which can accommodate a UH-60 Black Hawk helicopter. It is equipped with a medical center with a negative pressure area, a surgery suite, and a x-ray facility.[6][7]
History
The procurement is part of a decade long Coast Guard shipbuilding project with a projected budget of NT$42.6 billion ($1.4 billion).[6] The budgeted cost of the four 4,000 ton patrol vessels is NT$ 11.74 billion (US$392 million).[2] Delivery of all four is planned to be completed by 2025.[8]
The first vessel of the class, Chiayi (CG5001), was launched in June 2020.[6] The President of Taiwan Tsai Ing-wen presided over the launch.[3] The Coast Guard took possession of Chiayi in April 2021.[1]
The second vessel, Hsinchu (CG5002), was delivered in April 2022.[5]
Vessels
A total of 4 vessels are planned.
Chiayi (CG5001), launched in June 2020,[6] commissioned and delivered in April 2021.[9]
Hsinchu (CG5002), launched in April 2021,[10] commissioned and delivered in December 2022.
Yunlin (CG5003), launched in December 2022,[11] commissioned and delivered in March 2024.[12]