Boston College station is a light rail station on the MBTAGreen Line B branch. It is located at St. Ignatius Square on the Boston College campus near the intersection of Commonwealth Avenue and Lake Street, on the border between the Brighton neighborhood of Boston and the Chestnut Hill neighborhood of Newton, Massachusetts. Originally opened in 1896, it has been the terminus of the Commonwealth Avenue line since 1900. The current station is planned to be replaced by a new station located in the median of Commonwealth Avenue just east of Lake Street.
BERy cars from Lake Street began running into the Tremont Street subway via Beacon Street when the subway opened on September 1, 1897. On May 26, 1900, tracks on Commonwealth Avenue were completed from Chestnut Hill Avenue to Packards Corner, at which point Lake Street became the terminus of the Commonwealth Avenue line, which also ran into the subway.[2] Except for occasional service disruptions due to track work or blockages on Commonwealth Avenue, Boston College has been the terminus of the Commonwealth Avenue line (B branch) since 1900.[2]
Move to the north
Around 1916, the BERy constructed a pair of loops on the north side of Commonwealth Avenue just west of Lake Street; this allowed use of two-car motor-trailer trains on the line.[4][5][6] On November 20, 1918, an out-of-service BERy streetcar rolled down a hill and destroyed the station, killing a waiting passenger.[7]
Remaining M&B service on Commonwealth Avenue was replaced by buses in 1930, and the BERy no longer needed the old median station. The BERy built a storage yard on the site of the loops; a platform and waiting room in the yard opened on September 12, 1930.[2] The M&B used a bus stop adjacent to the new inbound platform.[8] The station was renamed to Boston College on May 21, 1947, by vote of the Boston Elevated Railway trustees after Boston College bought adjacent land for their Newton campus.[8] Boston College station has not had MBTA bus connections since the 535 Lake Street–Auburndale route (the direct descendant of the Commonwealth Avenue Street Railway) was discontinued in 1976.[9] (Boston College operates a system of private shuttle buses, but they stop on the campus rather than at the station.[10])
On May 23, 1979, the MBTA opened a new carhouse at the Lake Street yard. The carhouse provides light maintenance services to reduce the load on Reservoir and Riverside.[11][2] In early 1980, the platforms were replaced; additional platforms were also constructed along the median east of Lake Street.[12] Not a separate station, they were used when congestion in the yard (common with the introduction of the new Boeing LRVs) prevented trains from entering or exiting. The eastbound of these platforms, and a bus shelter on the westbound side, were removed during a 1980-81 renovation of the line.[9] The westbound platform is still occasionally used when track work is being performed in the yard.[13][14]
Proposed new station
In the early 2000s, the MBTA modified key surface stops with raised platforms for accessibility as part of the Light Rail Accessibility Program. Portable lifts were installed at Boston College around 2000, along with a wooden mini-high platform (for level boarding on older Type 7 LRVs) on the inbound side.[15][16] By 2005, the MBTA planned to relocate the station to the median of Commonwealth Avenue, just east of the Lake Street intersection.[17] Boston College later agreed to aid the project financially and to donate land to widen Commonwealth Avenue to accommodate the station.[18] New raised platform allowing level accessible boarding on newer low-floor Type 8 LRVs were completed on the existing site in 2009 at a cost of $296,000.[19]
Planning continued for the relocated station. The project was advanced to 15% design by a $656,000 federal grant and $164,500 of MBTA funds.[19] The design was advanced to the 30% level in November 2012 with an environmental review package completed the previous month. Once funds are made available, the new station was expected to take 24 months to construct at a cost of $20 million.[20]
The new station was planned to have two side platforms, with a narrower platform between the tracks for passengers offloading from outbound trains and a wider platform with canopies for those waiting to board inbound trains.[19] It would eliminate trains having to cross Commonwealth Avenue traffic to access the platforms, which would reduce moves across Commonwealth Avenue by 89%, though trains would still need to cross to access the yard.[20] It was to have raised platforms for accessible boarding on newer low-floor LRVs and a ramp for accessible boarding on older high-floor LRVs.[21]
A $29.3 million reconstruction and expansion of Lake Street Yard to support new Type 10 LRVs is planned for the late 2020s.[22] A design shown in March 2024 called for the maintenance building to be removed, the yard tracks reconfigured, and a traction power substation added. Boston College station would be relocated to the median of Commonwealth Avenue, with a single island platform east of Lake Street.[23]
^ abcdefClarke, Bradley H.; Cummings, O.R. (1997). Tremont Street Subway: A Century of Public Service. Boston Street Railway Association. pp. 58–59. ISBN0938315048.
^"Executive Summary"(PDF). Program of Mass Transportation. Boston Regional Metropolitan Planning Organization. January 2004. pp. 2–9. Archived from the original(PDF) on February 20, 2012.
^"Subway Map"(PDF). Massachusetts Bay Transportation Authority. 2001. Archived from the original(PDF) on July 1, 2001.