J Kumar Infraprojects was awarded the contract to construct the station in June 2016.[4] The MMRDA announced that electrification of the line had been completed on 26 May 2020.[5]
Borivali West was opened to the public on 2 April 2022, along with the first phase of Line 2A.[6][7]
Station layout
G
Street Level
Exit/Entrance
L1
Mezzanine
Fare control, station agent, Metro Card vending machines, crossover
Like all other stations and railways of Mumbai metro, Borivali West station also uses 25,000 volt AC power system by overhead catenary to operate the trains.