The tunnel's cost was estimated to be around 4.6 billion kr, and was financed through Oslo Package 1, with part of the funding coming from the city's toll ring.[2] The project includes an additional 8.0 kilometres (5.0 mi) of roads, 5.7 kilometres (3.5 mi) of pedestrian and cycle paths and 3.5 kilometres (2.2 mi) of bus lanes. The project will create a 6.0 kilometres (3.7 mi) continuous tunnel from Framnes (at the Kiel ferry terminal) to Ryen. The connection with the Festning Tunnel will require a 100 metres (330 ft) sinking of the latter, and it will have a basement built under it.[1]
References
Wikimedia Commons has media related to E18 Bjørvika.