The construction of the power station, which was undertaken by a consortium of AEI and John Thompson,[1] began in 1956.[2] It had two Magnoxreactors producing 276megawatts (MW) in total – enough electricity on a typical day to serve an urban area the size of Bristol. The reactors were supplied by The Nuclear Power Group (TNPG) and the turbines by AEI.[3] Electricity generation started in 1962 and ran for 27 years to 1989.[4]
Nuclear fuel for Berkeley power station was delivered and removed via the nearest railhead, a loading facility on the Sharpness single railway line. This included a dedicated siding and a gantry crane.[5]
Specification
Berkeley had four 83MW turbo-alternator generators, giving a gross capability of 334.4MW and a net capability of 276MW.[6] The steam conditions at the turbine stop valve were 20.3 / 3.9 bars (2,030 / 390 kPa) and 319 / 316 °C (606 / 601 °F). In the year 1978/9 the station generated 1,392.63GWh, and in 1980/1 the station generated 1,003.923GWh, The overall thermal efficiency of the station in 1981 was 21.12 per cent.[6]
Closure
Reactor 2 was shut down in October 1988, followed by Reactor 1 in March 1989. Berkeley was the first commercial nuclear power station in the United Kingdom to be decommissioned.
So far the nuclear decommissioning process has involved the removal of all fuel from the site in 1992, and the demolition of structures such as the turbine hall in 1995 and cooling ponds in 2001.[7] The next step of decommissioning will be the care and maintenance stage of the nuclear reactor structures, scheduled to commence in 2026, until radioactive decay means that they can be demolished and the site completely cleared between 2070 and 2080.[8]
In March 2012, five of the 310 long tons (310 t) boilers were moved from the station to Sweden for decontamination and recycling.[9][10]
In May 2023, a £30.8million (US$38.8million) contract was awarded to Altrad for the design, asbestos removal, deplant, demolition and construction works which will take place and conclude in the full removal of the four blower houses that surround the reactor buildings. This was previously slated to be completed when the reactor buildings themselves are demolished in the 2070s.[14]
Berkeley Nuclear Laboratories
Just south of the power station were Berkeley Nuclear Laboratories, one of the UK’s three main nuclear power industry research centres. At its peak about 750 staff worked at the labs including 200 scientists and engineers.[15]
By 2023, the site and some surrounding land was converted into a 50-acre (20-hectare) technology park now called Gloucestershire Science & Technology Park, by a subsidiary of South Gloucestershire and Stroud College. At the centre of the site the former engineering rig hall, building D24, the John Huggett Engineering Hall, was converted into a college engineering campus.[16][17][15] Alongside which was built a university technical college. The site now accommodates Bloodhound LSR and Gloucestershire Constabulary.
In August 2024, South Gloucestershire and Stroud College sold the site for £6.5 million to the Chiltern Vital Group, who plan to redevelop the site for a nuclear technology and low-carbon energy "super cluster" of businesses.[18]