The tender to construct the center was held in May 2012. Construction of the building started in February 2014 and completed a year later in February 2015.[1]
Architecture
The center was designed by MAYU architects+.[2][3] It was constructed on a 7,652 m2 of land with building area of 2,053 m2 and a total floor area of 2,918 m2.[1]