Barrington Tower was developed by Halifax Developments Limited as the second office tower of the Scotia Square development. The building was officially completed on 1 April 1971.[3]
Tenants
The tower is used for office and commercial space. It was formerly the home of Emera, owner of Nova Scotia Power, who relocated to a converted power plant on Lower Water Street in 2011.[4]
Located in the lobby is a branch office for Medavie Blue Cross.[5]
Bike room facilities
Crombie REIT opened a bike room for tenant use in 2014. It is located in the loading bay below the ground floor of the tower with an entrance onto Barrington Street. The facilities feature lockers, showers, changing room, bicycle repair equipment and is secured via card access technology.[6]
With the opening of this facility, Crombie REIT was named the "Most Cycling-friendly Landlord" 2014 by the Halifax Cycling Coalition.[7]
References
^"Barrington Tower". Emporis. Archived from the original on September 30, 2004.