Baltic 1 Offshore Wind Farm

EnBW Baltic 1
image of several of the wind turbines
Map
Country
  • Germany
LocationBaltic Sea
Coordinates54°36′50″N 12°40′00″E / 54.6139°N 12.6667°E / 54.6139; 12.6667
StatusOperational
Construction began
  • June 2010
Commission date
  • 2 May 2011
Owner
Wind farm
Type
Distance from shore16 km (10 mi)
Rotor diameter
  • 93 m (305 ft)
Site area7 km2 (3 sq mi)
Power generation
Units operational21 × 2.3 MW
Make and modelSiemens Gamesa SWT-2.3-93 (21)
Nameplate capacity
  • 48.3 MW
External links
Websitewww.baltic1.de
CommonsRelated media on Commons
Map
Wind farm layout

EnBW Baltic 1 is the first commercial offshore wind farm of Germany in the Baltic Sea. Siemens supplied 21 SWT 2.3-93 wind turbines for the 48.3 megawatt wind farm.[1] EnBW Baltic 1 is located about 16 kilometres (9.9 mi) north of the Darss-Zingst Peninsula and covers about seven square kilometers. Work started in July 2010;[2][3] the wind farm was officially commissioned on 2 May 2011.[4]

Due to the Kriegers Flak Combined Grid Solution, power from Sweden (via Zealand), the 600 MW Kriegers Flak, the 288 MW Baltic 2 is sent via Baltic 1 to Germany, and is synchronized to the Nordic grid (not the German grid) via a 150 kV 400 MW alternating current subsea cable.[5][6]

Generation

Energy-Substation of EnBW Baltic 1 Offshore windfarm in the Baltic Sea
Baltic 1 production[7]
Year Production
GWh
Full load hours
2012 204 4,224
2013 191 3,954
2014 196 4,048

See also

References

  1. ^ Siemens wins offshore wind contract
  2. ^ Two Important New Offshore Windfarm Contracts Signed by Nordsee – GeoSea
  3. ^ "EnBW prelims state that Baltic 1 will be complete "in a few weeks time" from 2011-02-08". Archived from the original on 2011-04-11. Retrieved 2011-02-13.
  4. ^ Connor, Richard; Darren Mara (2 May 2011). "Offshore wind park powers German hopes for non-nuclear future". Deutsche Welle. Retrieved 2011-05-02.
  5. ^ "Kriegers Flak Combined Grid Solution | Energinet". en.energinet.dk. Energinet.dk. Archived from the original on 4 August 2020.
  6. ^ Garus, Katharina (2016-03-14). "ABB gets order for Kriegers Flak onshore converter". ABB. Retrieved 2016-08-22 – via offshorewindindustry.com.
  7. ^ Knight, Sara (29 May 2015). "Politics block German offshore wind link". Windpower Monthly. Archived from the original on 28 January 2016. Retrieved 12 July 2016.