Balakot Hydropower Project
| Balakot Hydropower Project | |
|---|---|
| Country | Pakistan |
| Location | Kunhar River, Khyber Pakhtunkhwa |
| Status | under construction |
| Construction began | September 2022[1] |
| Construction cost | USD 550 million |
| Owner | Government of Khyber Pakhtunkhwa[2] |
| Operators | Pakhtunkhwa Energy Development Organisation, Government of Khyber Pakhtunkhwa |
| Power generation | |
| Units operational | 3 |
| Make and model | Francis turbines |
| Nameplate capacity | 300 MW |
| Annual net output | 1,143 GWh |
The Balakot Hydropower Project is designed as a run-of-river scheme and is slated to be built on the Kunhar River.[3] Its primary objective is to generate clean energy and alleviate the demand-supply disparity in Khyber Pakhtunkhwa and nearby areas.[4] The project is anticipated to yield a power generation capacity of 300 MW, contributing to a significant average annual energy production of 1143 GWh.[3][5]
The Balakot Hydropower Project is a joint venture financially supported by both the Asian Development Bank and the Asian Infrastructure Investment Bank. The overall funding for this venture amounts to US$550 million, with the Asian Development Bank providing US$300 million, and the Asian Infrastructure Investment Bank contributing US$250 million.[3][6][7]
Construction
The Balakot Hydropower Project encompasses various key components, foremost being the construction of a 58-meter-high gravity concrete dam along with associated appurtenant structures. The project also involves river diversion works, a sediment bypass tunnel, and a comprehensive power circuit. The power circuit infrastructure comprises a power intake, a concrete-lined headrace tunnel, an upstream surge shaft, steel-lined pressure shafts and penstocks, a downstream surge shaft, and a concrete-lined tailrace tunnel. Additionally, the project includes a cavern-type powerhouse that accommodates three Francis turbines, collectively offering an installed capacity of 300 MW. This powerhouse is equipped with access tunnels and an exterior switchyard for efficient functioning.[8][9][10]
References
- ^ "Project Implementation Monitoring Report (#6)" (PDF). www.aiib.org.
- ^ "KP signs pact for 300MW Balakot hydropower project". DAWN. March 10, 2021.
- ^ a b c "Balakot Hydropower Development Project". Asian Development Bank. July 15, 2021.
- ^ "ECONOMIC ANALYSIS" (PDF). www.adb.org. Retrieved 27 March 2026.
- ^ Buneri, Aziz (August 15, 2022). "Balakot hydropower project faces further delay". Profit by Pakistan Today.
- ^ "Pakistan: Balakot Hydropower Development Project - Projects - AIIB". www.aiib.org.
- ^ "KP signs pact for 300MW Balakot hydropower project". DAWN.COM. March 10, 2021.
- ^ "Bidding extended for 300 MW Balakot project in Pakistan | Hydropower & Dams International". www.hydropower-dams.com.
- ^ "Work stepped up on Balakot Hydropower Project". August 17, 2023.
- ^ "Development work on Balakot Hydropower Project to start this year". October 26, 2022.
Content Disclaimer
Informasi ini disarikan dari Wikipedia dan disajikan kembali untuk tujuan edukasi. Konten tersedia di bawah lisensi CC BY-SA 3.0. Kami tidak bertanggung jawab atas ketidakakuratan data yang bersumber dari kontribusi publik tersebut.
- The information displayed on this website is sourced in part or in whole from Wikipedia and has been adapted for the purpose of restating it. We strive to provide accurate and relevant information, however:
- There is no guarantee of absolute accuracy. Wikipedia is an open, collaborative project that can be edited by anyone, so information is subject to change.
- It is not intended to constitute professional advice. The content displayed is for informational and educational purposes only. For important decisions (e.g., medical, legal, or financial), please consult a professional.
- Content copyright. Wikipedia is licensed under the Creative Commons Attribution-ShareAlike License (CC BY-SA). This means that content may be reused with appropriate attribution and shared under a similar license.
- Responsible use. Any risk arising from the use of information from this website is entirely the responsibility of the user.