You can help expand this article with text translated from the corresponding article in German. Click [show] for important translation instructions.
Machine translation, like DeepL or Google Translate, is a useful starting point for translations, but translators must revise errors as necessary and confirm that the translation is accurate, rather than simply copy-pasting machine-translated text into the English Wikipedia.
Do not translate text that appears unreliable or low-quality. If possible, verify the text with references provided in the foreign-language article.
You must provide copyright attribution in the edit summary accompanying your translation by providing an interlanguage link to the source of your translation. A model attribution edit summary is Content in this edit is translated from the existing German Wikipedia article at [[:de:Berliner Elektronenspeicherring-Gesellschaft für Synchrotronstrahlung]]; see its history for attribution.
You may also add the template {{Translated|de|Berliner Elektronenspeicherring-Gesellschaft für Synchrotronstrahlung}} to the talk page.
BESSY supplies synchrotron light and provides support for science and industry. There are institutional long-time users, like the Max-Planck-Society, the German Federal Institute for Materials Research and Testing (BAM) and the national metrology institute of Germany (the PTB). Furthermore, research groups from other institutes or universities can apply for utilization (so called beam time) for certain projects.
BESSY I
This original synchrotron facility, costing the equivalent of 66.5 million Euro, became operational on 19 December 1981.[citation needed] It was situated in Wilmersdorf, then a borough of Berlin. The storage ring had a circumference of approx. 60 m. The circulating electrons that provided the radiation were in the energy range of 200 to 800 MeV (Vacuum Ultraviolet through Extreme Ultraviolet).[citation needed]
After its decommissioning in 1999, the component parts of the BESSY I machine were donated to the SESAME project by the German Authorities and have consequently been shipped to Jordan.[2]
Groundbreaking for the new improved BESSY II synchrotron source in Adlershof took place on 4 July 1994, and the facility was inaugurated on 4 September 1998. The project cost was an equivalent of approximately 100 million Euros. The successor of BESSY I has a circumference of 240 m, providing 46 beam lines, and offers a multi-faceted mixture of experimental opportunities (undulator, wiggler and dipole sources) with excellent energy resolution. The combination of brightness and time resolution enables both femtosecond time and picometer spatial resolutions.
Electrons can be accelerated to an energy of up to 1.7 GeV (X-ray regime), and are subsequently injected into the storage ring. Synchrotron radiation emerges from the dipole magnets that bend the beam on a circular path, as well as from undulators and wigglers. The total power input during regular operation is 2.7 MW.
BESSY II can be run in different modes, according to the time-distance between the electron wave packets that circulate in the storage ring:
multi bunch: This is the most common mode. Around 350 equal packets are in the ring, with a time-distance of 2 ns
single bunch: This mode is in effect for two weeks each half-year. Only one single electron packet is in the ring, thus enabling the users to measure with the highest possible time resolution. Two light pulses arrive with a gap of 800 ns and can therefore be easily separated.
low alpha: This mode exists in single and multi bunch sub-modes. The spatial resolution of the electron packet is higher (it is compressed), which leads to a higher rate of Terahertz radiation and shorter light pulses.
BESSY maintains a close co-operation with other synchrotron sources in the world, most notably with DESY in Hamburg.
Operation of BESSY II was interrupted on 15 June 2023 because of a cyberattack. The emission of light was restored at the beginning of July, but initially only for Physikalisch Technische Bundesanstalt.[4][5][6][7][8][9][10]
Other facilities
In September 2008, the Metrology Light Source (MLS)[11] was inaugurated. This facility in close proximity to BESSY II is run by PTB and provides synchrotron radiation in the energy range of far infrared and Terahertz radiation. The two facilities complement one another.
In 2000, the construction of a free electron laser on the BESSY site was planned, which was dubbed BESSY-FEL.[12] It was supposed to create extremely short and bright ultraviolet and X-ray pulses. In the autumn of 2008, the project was cut, and only an extension to the FLASH free electron laser in Hamburg is now to be built.