Arena Kombëtare

Arena Kombëtare
Map
Former namesQemal Stafa
AddressSheshi Italia 1, 1010
LocationTirana, Albania
Coordinates41°19′6″N 19°49′27″E / 41.31833°N 19.82417°E / 41.31833; 19.82417
Elevation112 m (367 ft)
OwnerAlbanian Football Association
OperatorQendra Sportive Kuq e Zi Sh.A.[1]
Capacity22,500
Field size110 x 68 m
SurfaceGrass
ScoreboardLED
Construction
Broke groundJune 2016
Built2016–2019
Opened17 November 2019 (2019-11-17)
Construction cost85 million
ArchitectMarco Casamonti (Archea Associati)
BuilderAlbStar Sh.P.K.
Tenants
Website
arenacenter.al

Arena Kombëtare (pronounced [aˈɾena ˌkɔmbəˈtaɾɛ]; known for sponsorship reasons as the Air Albania Stadium) is an all-seater, multi-purpose football stadium located in the capital city of Tirana which was built on the ground of the former Qemal Stafa Stadium.[2] The stadium has a seating capacity of 22,500 constituting the largest stadium in Albania.[3][4]

The stadium is owned by the governing body of Albanian football, the Albanian Football Association (FSHF) and the Albanian State through Shoqëria Sportive Kuq e Zi Sh.A, a subsidiary established for the purpose of building, managing and maintaining the structure.

Designed by Marco Casamonti of Archea Associati, the structure of the stadium is a peculiar multi-faceted form (an 8-faceted rectangle) so that each side allows access to distinct functions. At one corner of the stadium structure is an 112-metre tall tower (24 floors). Each facet accommodates different streams, thus identifying users of private areas, such as the hotel tower, shopping areas and stadium spectators.

In May 2022, the stadium hosted the first ever Europa Conference League final between AS Roma and Feyenoord Rotterdam.

Location

The stadium is located in the city-centre of the capital city of Tirana. Precisely on the Italia Square which itself is alongside one of the two main squares of the city, the Mother Teresa Square, named after the Albanian-born Saint Teresa of Calcutta. Both squares are located at the southern end of the Dëshmorët e Kombit Boulevard, which on that side is confined to the University of Tirana building and the Grand Park of the city. The whole area, including the old Qemal Stafa Stadium, was conceived and built during the Kingdom of Albania and later during the Italian occupation by architects and urban planners Gherardo Bosio, Armando Brasini and Florestano Di Fausto.[5] The stadium is surrounded by other public buildings such as the University of Tirana, the Palace of Congress, the Archaeological Museum, University of Arts, the Presidential palace, etc.

History

Planning and attempts

The Qemal Stafa Stadium in the 90s

For more than 60 years since its construction, Qemal Stafa Stadium served as the main stadium in Albania, the home of the Albania national team, as well as the home of several athletic competitions and other events. After its degradation over the years, around 2010s the Albanian Football Association (FSHF) and the Albanian government began to discuss the possibility of renovating the facility or, if not possible, building a new stadium in the same location.[6] The government and the FSHF came to an agreement to create a joint venture that would handle the tendering, construction and then management of the new stadium, with the condition that the destination of the sports facility would not be changed. Thus, on 26 March 2011, was established Qëndra Sportive Kuq e Zi Sh.A with 70% of shareholding belonging to the FSHF and 25% to the Albanian Government through the Ministry of Sports.[7][8]

On 19 October 2010, Albania's PM Sali Berisha after a meeting with the President of UEFA Michel Platini, declared that the government is seriously considering the construction of a new stadium.[9] Soon after, at a meeting of the Council of Ministers on 2 February 2011, a decision was taken that for the 100th Anniversary of the Independence of Albania, which will occur in 2012, a new national stadium will be built in Tirana.[10] Fenwick Iribarren Architects was commissioned to design the new stadium. The project envisioned the construction of a 33,000 all-seated stadium with an exterior facade representing Albanian state borders and its flag colours.[11] But it never went ahead with the implementation of the project, considering it too expensive for the state budget which would cover most of the construction costs.[12]

In November 2013 the President of the FSHF, Armand Duka stated that UEFA will no longer allow European competitions such as the Champions League, UEFA Europa League and other international leagues to be played at Qemal Stafa Stadium or any other stadium in Albania because neither of them does not meet UEFA standards. Consequently, the Albania national team and the Albanian Superliga teams participating in international competitions risked playing their matches abroad.[13] Soon after, FSHF in cooperation with the new government elected, took steps to finance the reconstruction of the Elbasan Arena stadium to avoid UEFA's penalties, thus giving time for the construction of a new national stadium in Tirana.

Efforts were made again in 2015, but this time trying new forms of financing without burdening the state budget. The Italian company Serenissima Costruzioni in collaboration with MANICA Architecture and Progetto CMR as designer, presented its project for the stadium.[14] The project envisioned the transfer of ownership of all non-sporting and commercial spaces in favour of the company, as well as the construction of a tower on one side of the stadium which would also be owned by the company.[15] This attempt also failed during negotiations between the government and the investor because the company requested the government to provide bank guarantees for the loans that the company would obtain during construction.[16]

On 22 May 2016 after the stadium was previously excluded from UEFA due to non-compliance with the standards, the last match between FK Kukësi and KF Laçi valid for the Albanian Cup Final was played in the Qemal Stafa Stadium before its final closure until the new stadium begins to build.[17]

Final effort and tendering

A final attempt was made the following month by reopening the invitation to tender, with AlbStar Sh.p.k presenting a concrete offer.[7] Compared to previous projects, AlbStar presented a new project with a reduced capacity of 22.500 all-seated stadium which also envisioned a tower in one corner of the stadium structure. The project was designed by Florentine architect Marco Casamonti of Archea Associati, who envisioned a faceted rectangular stadium bound by a curved line.[18] Such a form of the stadium was associated with the symbolism of the map of Albania which has a similar rectangular shape from north to south with some curved incisions at the northeast, northwest, southeast and southwestern extremes of the country. The external facade is covered with black and red metal panels combining them with the use of glass on the whole facade, including the tower. The metal panels have a curved triangular form, stylised with some shapes reminiscent of traditional Albanian carpets. The tower itself is 112 metres high and it fits the curved line of the structure on that side. The sports spaces inside the stadium consists of 3 uniform two-ring grandstands, and the main grandstand of one level which serves only for VIP stands.

Demolition and construction

Arena Kombëtare during construction

On 21 April 2016, the project was officially presented by the President of FSHF Armand Duka, accompanied by the PM Edi Rama.[19] At the design stage and during its presentation, the project was named "Arena Kombëtare" (English: National Arena), becoming the common name and widely used throughout its construction. The preliminary cost of the construction was initially said to be around 50 million but later was increased to 60m, and according to comments from FSHF officials, the final cost exceeded 75 million euros.[20]

The signed contract stipulates that most of the cost of construction will be carried out by the private company itself, somewhere around 40 million, and the difference of 10 million would be covered by UEFA’s HatTrick assistance programme.[21] Also, any cost increases during construction would also be carried by the company. While the company would be rewarded with the ownership of all non-sporting parts and the tower which will be built simultaneously on one corner of the structure, as well as exempting the company from VAT payments for any work done related to the project.[22]

On the other hand, any other cost for everything sports spaces or game-related spaces will be carried out by the federation itself in cooperation with the government. The FSHF will pay for the interior design of the sports spaces, such as the changing rooms, conference rooms, etc. Also for the natural grass for the pitch, all the seats, the LED floodlights, as well as a large screen also in LED to be installed on the roof of the main grandstand.[20]

On 9 June 2016, the demolition of the National Stadium Qemal Stafa officially began.[23] A new stadium, the Arena Kombëtare, will be built in its place, which will serve as the new home of the Albania national football team. The stadium will have 21,690 seats, but the facility is projected to be multi-functional.[7] Simultaneously with the demolition began the disassembling stone by stone of the monumental staircase built by Gherardo Bosio in 1939, which is considered Monument of Culture and part of the cultural heritage of the capital. It will be conserved and then integrated by reassembled in the same location into the new stadium, where it will serve the same function as the main entrance to the stadium as it has had since its construction.[24][25]

Initially it was said that at least the sports areas of the stadium would be completed within two years of the start of construction, otherwise there would be penalties for the company. But since the beginning of the works there were problems with the sewage system of the capital which passed just under the old stadium, which caused the work to be delayed until the solution was found in cooperation with the Municipality. Then there were some other postponements making the stadium finally wrap up on 10 November 2019, waiting for the first time a test match between women's football teams of Vllaznia Shkodër and Apolonia Fier.

Opening

Air Albania Stadium during its inauguration match between Albania and France

The FSHF initially announced that the stadium would most likely be inaugurated on 11 June 2019 but had to be tested and inspected by UEFA officials beforehand.[22] However, the plan for the inauguration was postponed due to the delay in work and the pitch just being installed.[26] The first test match was originally set to be played on 3 November, but was delayed by a week due to heavy rains.[27] The first match, a women's fixture between KF Vllaznia and KF Apollonia held on 10 November, was attended by many fans and won by Vllaznia 2–0, with the first-ever goal at the stadium scored by Arbiona Bajraktari.[28]

Arena Kombëtare, now under the new official name of Air Albania Stadium, was officially inaugurated with a ceremony on 17 November 2019, 1274 days after the final game at the old stadium. The first match, was valid for the Euro 2020 qualifiers played at 20:45 between the national teams of Albania and France, which the host team lost 0–2.[29] A crowd of more 21,000 was in attendance. Many celebrities of sport, politics and art were invited to the ceremony, with the UEFA President Aleksander Čeferin and Prime Minister of Albania Edi Rama were among them.[21]

Tirana-Partizani match on 28 February 2020

Naming

Since 1946, the time at which the stadium was finished, was named Qemal Stafa Stadium in honor of Qemal Stafa, a hero of the second world war and founder of the Communist Party, which was in power after the war. The old stadium held this name until 9 June 2016, the day on which its demolition officially began.

During a ceremony held to present the winning project and the conclusion of the agreement for the construction of the new stadium, Albania's PM Edi Rama referred to the new stadium with the name of Arena Kombëtare. This made the stadium widely known and referred to as "Arena Kombëtare" from the day the works began until a few weeks before the completion of the work. However, much controversy arose during the construction of whether the stadium should retain its old name "Qemal Stafa", the new one "Arena Kombëtare" or should be renamed in honor of a prominent Albanian football player to honor him as well as the history of this sport in the country. The most discussed figure was that of Panajot Pano, the former striker of KF Partizani, one of the capital's teams, as well as the national football team player. His name is widely respected and is considered one of the greatest footballers the country has ever known.

Towards the end of the works, however, the FSHF hinted that the stadium could be named after a private company for sponsorship reasons. According to the federation, such a stadium will require ongoing funding due to maintenance and this necessitates taking advantage of any sponsorship opportunities.[30]

This led to the opening of the tender on 8 August 2019, just months before the inauguration, for the new stadium name. Some domestic and foreign companies were interested in the competition, including oil, telecommunications, insurance, and airline companies. On 15 November 2019, Kuq e Zi Sh.A issued a press release announcing that two companies, Bolv Oil and Air Albania, went in the final phase of negotiations. With the Air Albania being announced as the winner with the most favourable bid.[31][32]

The deal stipulates that within the next five years starting from the date of signing, the new stadium name will be "Air Albania Stadium". It was also decided that each tribune would have its own name.

Structure and facilities

Tirana Marriott Hotel and Arena Centre

The stadium is located near the centre of the capital Tirana. The building built on the side of the stadium includes a Tirana Marriott Hotel.[33] The stadium includes a history museum, changing rooms, and other facilities such as cafeterias, lavatories including access for the disabled, a press area, a convention centre, a trophy room, etc.

There is no room for a running track as capacity will grow to over 22,000 seats, all covered. The overall project is part of the Arena Shopping Centre together with the 112-metre tower, 80-room hotel and 256 underground parking spaces. All of the stadium facilities will be hidden behind a unique set of blinders in national colours of Albania.

Tirana's TUMO Center

In October 2020, the Municipality of Tirana alongside the Albanian-American Development Fund (AADF) decided to temporarily open the TUMO Center on the Arena Kombëtare internal spaces.[34] The center offers for adolescents aged 12–18, extracurricular educational programs, innovative in design and technology, providing adolescents with space and equipment to advance their education while developing technical skills.[35] The original location of the TUMO Tirana is the Pyramid of Tirana which is planned to be reconstructed and returned to the headquarters of this teaching center.[36][37]

See also

References

  1. ^ "QENDRA SPORTIVE KUQ E ZI". www.opencorporates.al. Retrieved 2019-03-31.
  2. ^ "Prezantohet "Arena Kombëtare"" [Presentation of Project] (in Albanian). Albanian Public Television. Albanian Public Television. 21 April 2016. Archived from the original on 17 July 2018. Retrieved 21 April 2016.
  3. ^ "Albania's New Stadium Finally Has a Name". Albanian Daily News.
  4. ^ "Fillon zyrtarisht prishja e stadiumit Qemal Stafa" [The demolition of Qemal Stafa Stadium has officially begun] (in Albanian). Albanian Public Television. Albanian Public Television. 9 June 2016. Archived from the original on 18 August 2016. Retrieved 9 June 2016.
  5. ^ "Italianët që projektuan Tiranën moderne". Gazeta Dita. Archived from the original on 2020-01-15. Retrieved 2020-01-15.
  6. ^ "Fytyra e re e stadiumit "Qemal Stafa"". FUNKY FISH. 2009-12-11. Retrieved 2020-01-14.
  7. ^ a b c Vincent W.J. van Gerven Oei (2016-11-15). "Government Favorites Line Up for Stadium Construction". Exit - Explaining Albania. Archived from the original on 2020-08-04. Retrieved 2020-01-14.
  8. ^ "Open Corporates Albania". open.data.al. Retrieved 2020-01-14.
  9. ^ "Platini "firmos" stadiumin e ri". top-channel.tv. Retrieved 2020-01-14.
  10. ^ "Keshilli i Ministrave". arkiva.km.gov.al. Retrieved 2020-01-14.
  11. ^ "Albanian National Football Stadium - Fenwick Iribarren Architects". www.fenwickiribarren.com. Retrieved 2020-01-14.
  12. ^ "UEFA president visits Albania, new national stadium outside the capital". Independent Balkan News Agency. 2014-02-19. Archived from the original on 2020-01-14. Retrieved 2020-01-14.
  13. ^ "Alarmi i UEFA-s: Aktualisht mund të luani vetëm jashtë!". Gazeta Shqip (in Albanian). Retrieved 2020-01-14.
  14. ^ "National Stadium of Tirana". Progetto CMR - Massimo Roj Architects. Retrieved 2020-01-14.
  15. ^ "Stadiumi i ri Kombëtar (2015)". Radio Televizioni Shqiptar. 2015-11-03. Archived from the original on 2015-11-09. Retrieved 2020-01-16.
  16. ^ "Ana e errët e Stadiumit të ri dhe e vërteta e Kullës së tij 19-katëshe". Gazeta Dita. Archived from the original on 2020-01-14. Retrieved 2020-01-14.
  17. ^ "Kukësi fiton Kupën e Shqipërisë, Laçi jashtë Europës (VIDEO)". www.panorama.com.al (in Albanian). Retrieved 2020-01-14.
  18. ^ "Stadio Nazionale dell'Albania | Archea Associati". www.archea.it. Retrieved 2020-01-14.
  19. ^ "50 milionë euro investim, prezantohet projekti i stadiumit "Arena Kombëtare"". Telesport. Retrieved 2020-01-14.
  20. ^ a b "Kostoja e stadiumit rreth 70 mln euro Arben Dervishi tregon detajet e Arenës Kombëtare". GazetaExpress. 2019-05-31. Archived from the original on 2020-01-14. Retrieved 2020-01-14.
  21. ^ a b UEFA.com (2019-11-19). "Aleksander Čeferin hails Albania's new national stadium | Inside UEFA". UEFA.com. Retrieved 2020-01-13.
  22. ^ a b "Kur përfundon stadiumi i Kombëtares?" (in Albanian). Retrieved 2020-01-14.
  23. ^ "Fillon zyrtarisht prishja e stadiumit Qemal Stafa". Radio Televizioni Shqiptar. 2016-07-09. Archived from the original on 2018-10-13. Retrieved 2020-01-16.
  24. ^ "Fasada e Arenës Kombëtare ashtu si e kërkoi Kryeministri Rama, pa basorelieve". Exit | Shpjegon Shqipërinë (in Albanian). 2019-11-01. Archived from the original on 2020-01-14. Retrieved 2020-01-14.
  25. ^ "The Unofficial View of Tirana". Berfrois. 2016-08-15. Retrieved 2020-01-14.
  26. ^ "E konfirmon UEFA, shtyhet inagurimi i stadiumit "Arena Kombëtare"". Balkanweb.com - News24 (in Albanian). 2019-05-01. Retrieved 2020-01-12.
  27. ^ "Vllaznia-Apolonia, shtyhet për një javë ndeshja e kampionatit të femrave". FSHF (in Albanian). 2019-11-01. Retrieved 2020-01-16.
  28. ^ "Arena Kombëtare kalon testin/ Fitoren e parë e shijojnë vajzat e Vllaznisë kundër Apolonisë! Pamjet brenda stadiumit - Shqiptarja.com". shqiptarja.com (in Albanian). Retrieved 2020-01-12.
  29. ^ UEFA.com. "Albania-France | European Qualifiers". UEFA.com. Retrieved 2020-01-13.
  30. ^ "Stadiumi i Ri / Përtej shiritit të inaugurimit: për një menaxhim të qendrueshëm dhe afatgjatë". FSHF (in Albanian). 2019-08-21. Retrieved 2020-01-16.
  31. ^ "Official statement". fshf.org (in Albanian). 2019-11-15. Retrieved 2020-01-16.
  32. ^ ""Air Albania" fiton garën për emrin e stadiumit, kontrata firmoset të hënën". Balkanweb.com - News24 (in Albanian). 2019-11-09. Retrieved 2020-01-16.
  33. ^ "Marriott to open hotel in Albania's Tirana - govt". seenews.com. 28 November 2018. Retrieved 2019-11-16.
  34. ^ "Tirana enters the digital age, almost "Tumo Center", Veliaj: I can not wait to turn it into a success story". tiranapost.net. Retrieved 2020-11-07.
  35. ^ "Tirana becomes fourth capital city to open a TUMO technological centre". euronews.al (in Albanian). Retrieved 2020-11-07.[permanent dead link]
  36. ^ "Albanian-American Development Foundation". Retrieved 2020-11-07.
  37. ^ "Locations". TUMO. Retrieved 2020-11-07.

Read other articles:

Universitas Indonesia MandiriJenisPerguruan Tinggi SwastaDidirikan25 Juni 2021; 2 tahun lalu (2021-06-25)RektorLuluh Abdilah Kurniawan, S.E, M.MAlamatJl. Kampus Teratai Putih, RT.001/RW.006, Cimuning, Kec. Mustika Jaya, Kota Bekasi, Jawa Barat 17310, Situs webuimandiri.ac.id Universitas Indonesia Mandiri atau dikenal dengan UIMANDIRI adalah sebuah perguruan tinggi swasta yang terdapat di Kota Bekasi, Jawa Barat, Indonesia. Universitas Indonesia Mandiri berada di bawah naungan Yayasan Bat...

2013 video game This article is about the relaunched game, also known as A Realm Reborn. For the defunct original release, see Final Fantasy XIV (2010 video game). 2013 video gameFinal Fantasy XIVCollector's edition cover artDeveloper(s)Square EnixPublisher(s)Square EnixDirector(s)Naoki YoshidaProducer(s)Naoki YoshidaDesigner(s)Naoki YoshidaNobuaki KomotoProgrammer(s)Hideyuki KasugaArtist(s)Hiroshi MinagawaAkihiko YoshidaTakeo SuzukiWriter(s)Kazutoyo MaehiroComposer(s)Masayoshi SokenNobuo Uem...

Daryl Stuermer Stuermer spelar med Phil Collins i Royal Albert Hall 2017.FödelsenamnDaryl Mark StuermerFödelsedatum27 november 1952 (70 år)FödelseortMilwaukee, Wisconsin, USAGenrerProgressiv rock,[1] rock, jazzrock,[1] poprockRollMusiker, låtskrivare, musikproducentInstrumentGitarr, basgitarrÅr som aktiv1970 –Relaterade artisterGenesis, Phil Collins, Jean-Luc Ponty, Era, Gino Vannelli, Anni-Frid Lyngstad Daryl Mark Stuermer, född 27 november 1952 i Milwaukee, Wisconsin,[2] är e...

كامل الشناوي معلومات شخصية اسم الولادة مصطفى كامل الشناوي الميلاد 7 ديسمبر 1908الدقهلية،  مصر الوفاة 30 نوفمبر 1965 (العمر 56 سنة)القاهرة،  مصر الجنسية مصري الزوجة لم يتزوج أقرباء أخو مأمون الشناوي الحياة العملية المهنة شاعر، صحفي اللغات العربية  بوابة الأدب تعديل مصدري -

You can help expand this article with text translated from the corresponding article in Korean. Click [show] for important translation instructions. Machine translation, like DeepL or Google Translate, is a useful starting point for translations, but translators must revise errors as necessary and confirm that the translation is accurate, rather than simply copy-pasting machine-translated text into the English Wikipedia. Do not translate text that appears unreliable or low-quality. If possibl...

Prussian general (1848–1915) Otto von EmmichBorn(1848-08-04)4 August 1848Minden, PrussiaDied22 December 1915(1915-12-22) (aged 67)Hanover, Imperial GermanyAllegiance Kingdom of Prussia North German Confederation German EmpireService/branch Prussian Army Imperial German ArmyYears of service1866–1915RankGeneral der InfantrieCommands heldX Army CorpsArmy of the MeuseBattles/warsFranco-Prussian War World War I Albert Theodor Otto Emmich (since 1913 von Emmic...

ТЕС Ашдод (PAZ) 31°50′49″ пн. ш. 34°41′00″ сх. д. / 31.84722200002777726° пн. ш. 34.6836110000277741960° сх. д. / 31.84722200002777726; 34.6836110000277741960Координати: 31°50′49″ пн. ш. 34°41′00″ сх. д. / 31.84722200002777726° пн. ш. 34.6836110000277741960° сх. д. / 31.84722200002777726; 34.6836110000...

فاست تايمز آت ريدجمونتFast Times at Ridgemont High (بالإنجليزية) معلومات عامةالصنف الفني كوميديالمواضيع عذرية — إجهاض تاريخ الصدور 1982مدة العرض 90 دقيقةاللغة الأصلية الإنجليزيةالبلد الولايات المتحدةمواقع التصوير كاليفورنيا — سانتا مونيكا، كاليفورنيا — لوس أنجلوس الطاقمالمخرج إيمي...

Artikel ini bukan mengenai [[:musim kedua (1999) dari Journey to the West (serial TV 1996)]]. Journey to the West IISampulGenreMitologi Tiongkok, shenmo, fantasi, petualanganDitulis olehWu Cheng'en (cerita asli)Cheung Wah-biuSutradaraFong Chun-chiuPemeranBenny ChanKwong WahWayne LaiEvergreen MakNaratorJimmy KwokPenggubah lagu temaAki KubotaLagu pembukaChui Yat Nim (取一念) ditampilkan oleh Benny ChanNegara asalHong KongBahasa asliBahasa KantonBahasa MandarinJmlh. episode42ProduksiProduserL...

تحتاج هذه المقالة إلى الاستشهاد بمصادر إضافية لتحسين وثوقيتها. فضلاً ساهم في تطوير هذه المقالة بإضافة استشهادات من مصادر موثوقة. من الممكن التشكيك بالمعلومات غير المنسوبة إلى مصدر وإزالتها. هيئة علماء المسلمين التأسيس تاريخ التأسيس 2003 م المؤسسون مجموعة من علماء العراق الق

العلاقات الأبخازية السورية     [[{{{بلد1}}}]]   [[{{{بلد2}}}]] تعديل مصدري - تعديل   العلاقات بين أبخازيا وسوريا (بالروسية: Абхазско-сирийские отношения)‏ تشير إلى العلاقة الثنائية بين جمهورية أبخازيا وسوريا. اعترفت سوريا بأبخازيا في 29 مايو 2018. تم الإعلان عن إقامة علاقا

This article does not cite any sources. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed.Find sources: Château des Rudel – news · newspapers · books · scholar · JSTOR (July 2021) (Learn how and when to remove this template message) You can help expand this article with text translated from the corresponding article in French. (October 2011) Click [show] for important transl...

League of Legends esports team TSM League of Legends divisionGameLeague of LegendsFounded2011LeagueLCS (2013–2023)Based inLos Angeles, CaliforniaOwnerAndy Reginald DinhLCS titles7Spring 2013Summer 2014Spring 2015Summer 2016Spring 2017Summer 2017Summer 2020Websitetsm.gg The League of Legends division of TSM is a gaming team based in Los Angeles, California, that competed in the League Championship Series (LCS), the top-level professional league for video game League of Legends in the United ...

This article needs additional citations for verification. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed.Find sources: Funkentelechy vs. the Placebo Syndrome – news · newspapers · books · scholar · JSTOR (June 2010) (Learn how and when to remove this template message) 1977 studio album by ParliamentFunkentelechy vs. the Placebo SyndromeStudio album by ParliamentReleased...

Malibu, CA redirects here. For the TV series, see Malibu, CA (TV series). Malibu Beach redirects here. For the film, see Malibu Beach (film). City in California, United StatesMalibu, CaliforniaCityAerial view of Downtown Malibu and surrounding neighborhoods FlagSealNickname: The 'Bu[1][2][3]Location of Malibu in Los Angeles County, CaliforniaMalibuLocation in the Los Angeles Metropolitan AreaShow map of the Los Angeles metropolitan areaMalibuLocation in California...

Artikel ini bukan mengenai Stasiun Soka. Soka jawa Ixora javanica Status konservasiRisiko rendahIUCN136139187 TaksonomiDivisiTracheophytaSubdivisiSpermatophytesKladAngiospermaeKladmesangiospermsKladeudicotsKladcore eudicotsKladasteridsKladlamiidsOrdoGentianalesFamiliRubiaceaeSubfamiliIxoroideaeTribusIxoreaeGenusIxoraSpesiesIxora javanica DC., 1830 Tata namaBasionimPavetta javanica (en) lbs Bunga soka jawa (Ixora javanica) adalah tanaman semak yang terdapat pada Pulau Jawa.[1] Bunga in...

يعتبر محمد المنصف المرزوقي مفكرا وسياسيا وأحد المعارضين السابقين لنظام زين العابدين بن علي، ومدافعا عن حقوق الإنسان، وأحد منظري ثورات الربيع العربي قبل قيامه إلى جانب العديد من الوجوه البارزة، خصوصا في السنوات الأخيرة من المنفى السياسي، وأحد وجوه الربيع العربي البارزة، ...

Simple acoustic torpedo. Two acoustic transducers will react upon sound and the torpedo will detect that the signal comes from one of the sides. It will then issue a command to turn towards the target. When the sound is equal on both sides, the torpedo will follow a straight path until it reaches its target. An acoustic torpedo is a torpedo that aims itself by listening for characteristic sounds of its target or by searching for it using sonar (acoustic homing). Acoustic torpedoes are usually...

Ongoing accession process of Serbia to the EU EU accession process of SerbiaCurrent StatusCandidate Overview Chapters closed 5.9% complete Prerequisites & Negotiations Membership application22 December 2009Application approved1 March 2012Negotiations start21 January 2014Negotiations finishTBD Not yet applicable Travel Economic & Monetary Policy National currency and the Euro Impact New EU statistics upon accession Population446,828,803Area4,233,262 km2 1,634,472 mi2HDI0.896GDP (PP...

Historic site in Childs Way, Los AngelesWidney Alumni HouseLocation650 Childs Way, Los AngelesCoordinates34°01′11″N 118°16′58″W / 34.0196°N 118.2828°W / 34.0196; -118.2828Built1880ArchitectKysor & Morgan[1]Governing bodyUniversity of Southern California California Historical LandmarkOfficial nameOriginal Building of the University of Southern CaliforniaReference no.536 Los Angeles Historic-Cultural MonumentDesignatedDecember 16, 1970[2&...