Ahmedli (Baku Metro)

Ahmedli

Azerbaijani: Əhmədli
Baku Metro
Baku Metro station
Ahmadli metro station
General information
LocationBaku, Azerbaijan
Coordinates40°13′48″N 49°34′17″E / 40.23°N 49.5715°E / 40.23; 49.5715
Owned byBaku Metro
Line(s)
Tracks2
History
Opened28 April 1989 (1989-04-28)
Services
Preceding station Baku Metro Following station
Halglar Doslugu Red line
Hazi Aslanov
Terminus
Halglar Doslugu
towards Darnagul
Green line

Ahmedli (Azerbaijani: Əhmədli) is a Baku Metro station. It was opened on 28 April 1989.[1]

The length of the station is 3.1 km . For 23 years until 2002, until the Azi Aslanov station was opened, it was the terminus of the red line of the metro.

The construction was supervised by the architects L. Kochubey and L. Avramenko.[2][3]

See also

References

  1. ^ "Baku Metro". UrbanRail.
  2. ^ "Станция метро Ахмедлы - Баку". 101Hotels.com (in Russian). Retrieved 2023-10-17.
  3. ^ "Станция «Ахмедли»". Мир метро (in Russian). 2017-12-20. Retrieved 2023-10-17.