Construction of the motorway began in 1990, but a decade-long hiatus between the mid-1990s and 2004 caused by funding issues and the setting up of a separate company to develop and operate the motorway meant it was not completed until 2007. As of July 2011, the entire motorway route is completed, consisting of a dual-carriageway and four traffic lanes, except for a relatively short segment which is still a single carriageway road. The motorway is currently operated by Autocesta Zagreb – Macelj.
The motorway carries a considerable volume of traffic throughout the year; however, in the summer, its peak volume is nearly double the average, as traffic intensifies because of tourists travelling to and from Adriatic Sea resorts. Furthermore, the southernmost sections of the motorway serve Zagreb's sizeable suburban traffic.
The motorway spans 59.2 kilometres (36.8 mi) between the Macelj border crossing with Slovenia and the Zagreb–Jankomir interchange on the A3 motorway. The route serves Zagreb via the Ž1035 at the Jankomir interchange, Zaprešić via the D225, Zabok, Klanjec and Oroslavje via the D307, Sveti Križ Začretje via the D35, Krapina and Pregrada via the D206, Đurmanec via the D207 and Trakošćan via the D508. The D1 state road runs as a parallel, toll-free route along the motorway, and most of the motorway exits connect to that route directly, switching to D35, D206, D207 and D508 shortly afterwards.[6]
The A2 motorway has at least two traffic lanes and an emergency lane in each direction along its entire length, except in tunnels, where there are emergency bays instead. All of the interchanges are trumpet interchanges, except the Jankomir and Zaprešić interchanges, which are cloverleaf interchanges. There are a number of rest areas along the motorway providing various types of services, ranging from simple parking spaces and restrooms to filling stations, restaurants and hotels.[7] As of July 2011, the motorway has seven interchanges providing access to numerous towns and cities and the Croatian state road network.[6] The motorway is operated by the Autocesta Zagreb–Macelj company.[8]
An automatic traffic monitoring and guidance system is in place along the motorway. It consists of measuring, control and signalling devices located in zones where driving conditions may vary, such as at interchanges, viaducts, bridges, tunnels and zones where fog and strong wind are known to occur. The system uses variable traffic signs to communicate changing driving conditions, possible restrictions and other information to motorway users.[9] The A2 motorway mainly runs through the plains and rolling hills of Hrvatsko Zagorje region, although the northernmost sections of the route traverse rugged terrain, requiring a number of viaducts and long tunnels along the route.[10]
Toll
The A2 is a tolled motorway, based on the vehicle classification in Croatia, using a closed toll system. As of July 2011, the toll charged along the A2 route between the Zaprešić and Trakošćan mainline toll plazas varies depending on the length of route travelled, ranging from 1.00 kuna (0.13 euros) to 42.00 kuna (5.48 euros) for passenger cars and 47.00 kuna (6.13 euro) to 187.00 kuna (24.40 euro) for semi-trailer trucks. The toll is payable in either Croatian kuna or euros and by major credit and debit cards. A prepaid toll collection system is also used. The A2 is the only motorway in Croatia which does not provide for use of the ENC—an electronic toll collection (ETC) system shared by most motorways in Croatia that provides drivers with discounted toll rates for dedicated lanes at toll plazas.[11] In addition to the vehicle classification in Croatia, the motorway operator maintains an additional vehicle category for motorbikes, which are charged from 7.00 kuna (0.91 euros) to 25.00 kuna (3.26 euros) toll. The southernmost Jankomir–Zaprešić section of the motorway is not tolled, as it is part of the Zagreb bypass.[12]
The toll collected by Autocesta Zagreb–Macelj from the A2 motorway in the first quarter of 2011 amounted to 27.7 million kuna (3.61 million euros); however, this period does not include the significantly increased tourist traffic during the summer.[13] In 2010, Autocesta Zagreb–Macelj collected 166.9 million kuna (22.4 million euros) from A2 tolls.[14]
Notable structures
The southernmost section of the motorway, between the Jankomir and Zaprešić interchanges, forms part of the Zagreb bypass and entails a number of viaducts spanning roads and railways, including a 373-metre (1,224 ft) viaduct across the Zagreb–Ljubljana railway. Furthermore, the section comprises the Sava River Bridge, spanning 1,072 metres (3,517 ft). All the structures along the section are executed as dual structures with four traffic lanes.[15]
The northernmost segment between the Krapina interchange and the Macelj border crossing traverses rugged terrain, requiring further viaducts and tunnels. Among those, the most notable ones are the 579-metre (1,900 ft) Krapinčica Viaduct and the 1,740-metre (5,710 ft) Sveta Tri Kralja Tunnel. The tunnel is part of a sequence of two tunnels and three viaducts in a 3.7-kilometre (2.3 mi) segment between Krapina and Đurmanec.[16] Generally, the Krapina–Macelj border crossing segment of the A2 motorway required numerous expensive engineering works, including six tunnels and nine viaducts, which caused the construction cost to be over 235 million euros.[10]
History
The first section of the present A2 motorway was completed as a single-carriagewaylimited-access road between the Jankomir and Zaprešić interchanges, forming the westernmost section of Zagreb bypass, in 1980.[17] The section included a number of bridges and viaducts, spanning the Sava River and numerous roads and railroads, making construction of a dual-carriageway prohibitively expensive at the time. In 1991, the 7.4-kilometre (4.6 mi) section was extended by 17 kilometres (11 mi) of dual-carriage motorway to Zabok (more precisely to the nearby village of Gubaševo). Lack of funding greatly slowed further construction, and the following 16.2-kilometre (10.1 mi) section to Velika Ves south of Krapina, was only completed in 1996, which also included the construction of Gubaševo interchange. This part of motorway was built at the site of the so-called "Zagorje Highway" (Croatian: Zagorska Magistrala) – a limited-access two-lane expressway built in 1950's and 1960's that connected Slovenian border through Hrvatsko Zagorje with Zagreb, which today exists only in the southern part of its original route (between Zaprešić interchange and Gubaševo – where it terminates in the immediate vicinity of the motorway interchange).[18][19]
In 1997, the governments of the Republic of Croatia and the German state of Bavaria made a joint declaration regarding their future transport infrastructure development cooperation. The cooperation primarily dealt with the construction of the remaining A2 motorway sections and the Franjo Tuđman Bridge, and the two issues were formally settled between the Croatian government and Walter Bau AG. In 2003, the Autocesta Zagreb–Macelj company was established by the Croatian government and was awarded a concession contract to operate the motorway. Furthermore, a joint investment agreement with Walter Bau AG was signed by the government, effectively securing the financial assets required to resume construction. In 2004, Strabag replaced Walter Bau AG as a contract partner and construction finally resumed. In 2006, the section between Jankomir and Zaprešić was upgraded to dual-carriage motorway, and the motorway was extended to Krapina itself.[15][20] In 2007, after 33 months of construction defined by the contracts, the motorway was completed along its entire length, except for a short segment near Krapina which, as of July 2011, is still a single-carriageway road. The total cost of the motorway was approximately 372 million euros.[10][21][22] The largest portion of the total pertains to the northernmost 20-kilometre (12 mi) section between Krapina and Macelj, which was reported to cost 235 million euros.[23]
Further construction
The company Autocesta Zagreb-Macelj received a location permit in January 2021 to upgrade 3.7-kilometre (2.3 mi) of full profile on the section of the Đurmanec-Macelj highway, and the building permit is expected in the first half of 2022, while work is expected to begin in autumn 2022. The cost of construction is estimated at 70 million euros, and the entire project has been applied for funding from the EU Recovery Fund.[24]
Of the total 3.7-kilometre (2.3 mi) of the section, only 500-metre (1,600 ft) of the route are open road; everything else is facilities. The largest facility is the Sveta Tri Kralja Tunnel, 1,740-metre (5,710 ft) long, where a new tunnel pipe needs to be dug. During the construction of this tunnel, a service pipe of about 1,400-metre (4,600 ft) was dug, which should be dug to the end and a tunnel pipe for traffic should be made. An additional 600-metre (2,000 ft) long pipe from the Brezovica tunnel should also be dug. In addition, new viaducts should be built – Šumi (173 m), Puhi (237 m) and Ravninščica (397 m). It is estimated that the works themselves could last as long as two years.[24]
Traffic volume
Traffic is regularly counted and reported by Autocesta Zagreb–Macelj, the operator of the motorway, and is published by Hrvatske Ceste.[25] As the motorway traffic volume is measured through an analysis of toll ticket sales, the southernmost section of the motorway, Jankomir – Zaprešić, is not included in this report, as it is not tolled. However, since the section is a part of Zagreb bypass, it is considered to carry heavier traffic than any other section of the A2 motorway. In 2006, it carried more than 22,000 vehicles per day, and its traffic volume grew considerably since the completion of the motorway in 2007.[26]
Variations between AADT and average summer daily traffic (ASDT) traffic volumes are attributed to the fact that the motorway carries substantial tourist traffic to the Adriatic Sea resorts during the summer. On average, the tolled section of the A2 motorway carries 90% more ASDT than AADT. The largest increase, 125%, of the ASDT relative to the AADT is observed on the Đurmanec–Trakošćan section.[25]
As of July 2011, there are three rest areas along the A2 motorway. Legislation identifies four types of rest areas designated as types A through D: A-type rest areas comprise a full range of amenities, including a filling station, a restaurant and a hotel or motel; B-type rest areas have no lodging; C-type rest areas are very common and include a filling station and a café, but no restaurants or accommodations; D-type rest areas only offer parking spaces, possibly picnicking tables and benches and restrooms. Most rest areas along the A2 motorway generally follow this ranking system, although some offer extra services. Many filling stations have small convenience stores, and some offer LPG fuel.[27]
The primary motorway operator, Hrvatske autoceste (HAC), leases the A, B and C type rest areas to various operators through public tenders. As of July 2011, there are two such rest area operators on the A2 motorway: INA and OMV. The rest area operators are not permitted to sub-lease the fuel operations. The A2 motorway rest areas are accessible from both directions of the motorway and operate 24 hours a day, 7 days a week.[28]
Facilities found at the Jakovlje rest area comprise a filling station selling petrol and diesel fuel, a café and restrooms.[30]
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
Exit list
This article contains a bulleted list or table of intersections which should be presented in a properly formatted junction table. Please consult this guideline for information on how to create one. Please improve this article if you can.(November 2021)
Macelj border crossing to Slovenia where the road extends as A4 motorway and route 9. The northern terminus of the E59 concurrency. The northern terminus of the motorway.
Connection to Zaprešić and Zagreb via Aleja Bologne and Ilica. The northern terminus of the D1 state road concurrency. The D1 road is not physically signposted along the Zagreb bypass.
Connection to A3 motorway in Jankomir interchange and to Zagreb via Ljubljanska Avenue (Ž1035). The southern terminus of the D1 and E59 concurrencies. The southern terminus of the motorway. Southbound A2 traffic defaults to eastbound A3 (E70).