On 1 November 2021, a high-rise block of luxury flats under construction in the neighbourhood of Ikoyi in Lagos, Nigeria, collapsed. At least 42 people died. The government of Lagos State is conducting an investigation.
Background
Fourscore Homes Limited,[note 1] based in the neighbourhood of Ikoyi in Lagos, Nigeria,[1] financed and was undertaking (including having commissioned subcontractors for) the construction of a trio of highrise buildings at 44BCD (or 20) Gerrard Road in Ikoyi, known as the 360 Degrees Towers. The company was headed by the Nigerian developer Femi Osibona.[2][3]
One of the buildings was a 21-storey luxury residential high-rise tower, and it was this building that collapsed.[5] In February 2020, the consultancy firm Prowess Engineering Limited withdrew from the project over concerns regarding the integrity of the building.[6] The Lagos State Building Control Agency had approved plans for 15 floors, but 21 had been constructed.[7]
Collapse
The collapse of one of the three 360 Degrees Towers occurred at 14:45 West Africa Time (UTC+1) on 1 November 2021.[8][5][9] As of 6 November, 42 people have been confirmed dead.[10][11] An early official estimate stated that up to 40 workers were on the construction site at the time.[12] Osibona was also at the site, and died in the collapse.[13][14] His body was recovered on 4 November.[14][15][16] The Lagos state emergency agency stated that eight people were critically injured.[17]
As of 6 November, 15 people had been rescued.[20][21][12] As of 3 November, Lagos State governor Babajide Sanwo-Olu said that the search was ongoing.[22]
Investigation
Gbolahan Oki, the general manager of the Lagos State Building Control Agency, announced on 2 November that the owner[who?] of the building has been arrested and would be prosecuted.[23] The state government suspended the chief architect[who?], and is conducting an investigation through an independent panel, which has been allotted 30 days to disclose findings.[12][22] The Special Investigations Panel presented their report to the Council for the Regulation of Engineering in Nigeria (COREN) in February 2022.[24]