StatusOperational
Construction began2012
Opening dateOctober 2019
Construction costUS$3.8 billion
Owner(s)Xayaburi Power Company Limited
Dam and spillways
Type of damRun-of-river concrete barrage[1]
ImpoundsMekong
Height32.6 m (107 ft)
Length820 m (2,690 ft)
Spillway type10 x radial gates
Spillway capacity3,980 m3/s (141,000 cu ft/s)
Reservoir
Total capacity1.3 km3 (1,100,000 acre⋅ft)[2]
Catchment area272,000 km2 (105,000 sq mi)
Surface area49 km2 (19 sq mi)
Power Station
Operator(s)Xayaburi Power Company Limited
Hydraulic head18 m (59 ft) (rated)
TurbinesEDL: 1 × 60 MW
EGAT: 7 x 175 MW
Installed capacity1,285 MW[2]
Annual generation7,370 GWh
Website
www.xayaburi.com/index_eng.aspx

The Xayaburi Dam is a run-of-river hydroelectric dam on the Lower Mekong River, approximately 30 kilometres (19 mi) east of the town of Sainyabuli (Xayaburi) in northern Laos. Commercial operation of the dam started in October 2019.[3][4] The main purpose of the dam is to produce hydroelectric power, 95% of which is to be purchased by the Electricity Generating Authority of Thailand (EGAT).[5] The project is surrounded in controversy due to complaints from downstream riparians and environmentalists. Preliminary construction began in early-2012, but work on the dam itself was suspended shortly thereafter due to complaints from Cambodia and Vietnam downstream.[6] After making modifications to the dam's design, Laos started construction with a ceremony on 7 November 2012.[7] The Xayaburi Dam is the first of the 11 dams planned on the lower Mekong.[8]

History

Site terrain
Construction site

On 4 May 2007, the Lao government signed a memorandum of understanding with Thailand's CH. Karnchang Public Company Limited for the development of this hydropower project. The formal project development agreement followed in November 2008, and a feasibility study was conducted that same year by Swiss-based AF Colenco and Thai TEAM consultants. The environmental impact assessment was submitted in February 2010. In July 2010, a memorandum of understanding for power purchase was signed by EGAT and the Lao government.[9]

According to the 1995 Mekong Agreement, the project is subject to the Mekong River Commission (MRC) Procedures for Notification, Prior Consultation, and Agreement. Under this agreement, the project's host country must notify the governments of the other signatories, namely Cambodia, Thailand, and Vietnam.[10] The process was initiated in September 2010. It is the first project initiated through a regional decision-making process.[9][11]

On 19 April 2011, the MRC Joint Committee announced that the MRC countries could not reach a consensus on how to proceed with the project, and agreed that a decision on the prior consultation process be tabled for consideration at the ministerial level.[citation needed] However, in June 2011, the Laos Government gave the Thai developer CH. Karnchang the go-ahead to resume work on the Xayaburi Dam, informing the company that the Mekong River Commission's decision-making process was completed.[12] Prashanth Parameswaran, a former researcher at the Project 2049 Institute, who is conducting research on dam projects in Southeast Asia, warned, "Laos' actions not only represent a breach of trust, but threaten to undermine already fledgling efforts at regional cooperation in an ecosystem that supports the livelihoods of tens of millions of people."[13]

Dam construction began on 15 March 2012. CH. Karnchang announced on 17 April 2012 the signing of a 52 billion baht contract with the Xayaburi Power Company.[14] Preliminary construction (roads, bridges, support facilities) had accelerated in the prior few months.[15] Cambodia's government immediately reacted to the announcement, threatening to take Laos to international court if they chose to build it unilaterally.[16] Laos announced a halt to construction on 11 May 2012 due to complaints from neighbors and environmental groups.[17] Commercial operation of the dam started in October 2019.[3][4]

Description

The Xayaburi Dam is on a site 350 kilometres (220 mi) upstream of Vientiane and 770 kilometres (480 mi) downstream of Jinhong, the last dam of a Chinese cascade of seven dams, including four existing and three planned dams. In terms of energy supply, it will be the third largest project among those considered for development on the mainstem in the Lower Mekong Basin.

The Xayaburi Dam is 820 metres (2,690 ft) long and 32.6 metres (107 ft) high with a rated hydraulic head of 18 metres (59 ft).[9][18][19] Sitting at the head of a 272,000 square kilometres (105,000 sq mi) catchment area, it will create a reservoir with 1.3 km3 (1,100,000 acre⋅ft) gross storage capacity and a surface area of 49 square kilometres (19 sq mi).[18] The reservoir will reach 30 metres (98 ft) in depth and stretch between 60 and 90 kilometres (37 and 56 mi). The dam features a navigation lock and two fish passes.[20]

The power plant houses seven 175 MW Kaplan turbine-generators and one 60 MW Kaplan turbine generator.[2] The total installed capacity is 1,285 megawatts, with a total annual energy production of 7,406 GWh.[9][18] Around 95% of produced electricity (the seven 175 MW generators) would be exported to Thailand through a planned 200-kilometre (120 mi) long transmission line from the Xayaburi Dam to Loei Province in Thailand. The dam's construction will take 96 months at a cost of approximately US$3.5 billion.[9] It will become operational by 2020.[21][needs update]

Some people[who?] question whether the dam will function in the long term because its reservoir may be filled with silt.[13] A team of international sediment experts engaged by the Mekong River Commission (MRC) looked at this question and concluded that a proper sediment management plan and redesign of sediment passing structure will minimize sediment trapping. The developer stated it has accepted the MRC's conclusions and adopted its recommendations on sediment management.

Developers, engineers, and financiers

The project is developed by Xayaburi Power Company Limited, a subsidiary of the Thai construction company CH. Karnchang Public Company Limited.[22] Ch. Karnchang Public Company is also the leading contractor for the project. A syndicated loan of 80 billion Thai baht (US$2.67 billion at the March 2013 exchange rate) is provided by six Thai banks: Bangkok Bank, Kasikorn Bank, the government-owned Krung Thai Bank, Siam Commercial Bank, TISCO, and the Export-Import Bank of Thailand (EXIM Bank).[8][23] Thailand’s electricity utility, EGAT, has agreed to purchase 95 percent of the dam's electricity.[24]

The engineering firm for the dam is the Finnish company Pöyry. Pöyry carried out a comparison between the original design of the dam and the recommendations of the Mekong River Commission, a body that brings together all riparian states of the lower Mekong and that has carried out a strategic environmental assessment for the impact of the planned cascade of dams on the Mekong. In that comparison, Pöyry recommended improving the sustainability of the dam "including additional environmental studies, installation of additional fish ladders and other measures to improve fish migration as well as technical design modifications to improve the sediment and nutrients handling." After this, Pöyry was contracted to modify the design and to supervise the dam's construction, without awaiting the results of the unspecified "additional environmental studies".[25] Critics point out that analyzing the environmental impact of a dam inherently constitutes a conflict of interest with the more lucrative design and supervision of the dam. Pöyry stated and even guaranteed that the dam's environmental impacts could be mitigated, a statement for which it was severely criticized.[26] The French engineering company Compagnie Nationale du Rhône(CNR) was hired to provide an independent "peer review" of the Pöyry findings related to hydrology, navigation, and, in particular, sediment transport. CNR recommended further studies "to improve the project".[27] This was interpreted as CNR distancing itself from Pöyry's conclusions.[26]

Impact

According to International Rivers, the dam's construction would cause around 2,100 people to be resettled, and more than 202,000 people living in the dam's area would experience impacts due to the loss of agricultural land and riverbank gardens, bring an end to gold panning in the river, and provide less access to the forest resources of the Luang Prabang Range. The Xayaburi Dam would also have a significant effect on the biodiversity of the river ecosystem, and the fisheries within the larger Mekong River basin.[9][11] According to a World Wildlife Fund (WWF) report, the Xayaburi Dam would drive the already critically endangered Mekong giant catfish (Pangasianodon gigas) to extinction.[28]

Because the Mekong is a complex ecosystem that hosts the most productive inland fisheries in the world, the stakes are high for the construction of such a dam. According to a study conducted by WWF and the UN Food and Agriculture Organization, and coordinated by the WorldFish Center, there are 229 fish species whose spawning and migratory patterns would be affected by a mainstream dam. This change in fish biodiversity and abundance would greatly affect the tens of millions of people in the Greater Mekong Sub-region who depend on the river for their food and livelihood. According to Phnom Penh-based WorldFish Center, this damage to fisheries "cannot be mitigated by fish passes and reservoirs".[29]

A strategic environmental assessment commissioned by the Mekong River Commission (MRC) recommends a 10-year deferral of all Mekong mainstream dams in Cambodia, Laos, Thailand, and Vietnam, and calls for further studies.[19] According to an MRC spokeswoman, construction of the Xayaburi Dam "will result in irreversible environmental impacts".[29] The MRC warns that if Xayaburi and subsequent schemes went ahead, it would "fundamentally undermine the abundance, productivity and diversity of the Mekong fish resources".[30]

Milton Osborne, Visiting Fellow at the Lowy Institute for International Policy who has written widely on the Mekong, warns: "The future scenario is of the Mekong ceasing to be a bounteous source of fish and guarantor of agricultural richness, with the great river below China becoming little more than a series of unproductive lakes."[31]

None of the mitigation measures for fish and sediment passage included in the dam's current design have been tested at scale or in this environment. "Nowhere in the tropics has a successful fish passage been built for a dam the size of Xayaburi," said Dr. Eric Baran of the World Fish Centre in Phnom Penh. "It is unreasonable to assume that the proposed fish passage options will be efficient when they are neither based on successful experience in a similar context nor on a study of the local species."

Fish are a staple of the diet in Laos and Cambodia, with around 80% of the Cambodian population's annual protein intake coming from fish caught in the Mekong River system, with no alternative source to replace it. An MRC report claims that dam projects on the Mekong River will reduce aquatic life by 40% by 2020, and predicted that 80% of fish will be depleted by 2040. Thailand will be impacted, as its fish stocks in the Mekong will decline by 55%, Laos will be reduced by 50%, Cambodia by 35%, and Vietnam by 30%.[32] Dams would also restrict the flow of water over agricultural areas linked to the river.[3][31][33]

Record low water levels in the Mekong in July 2019, normally the rainy season, have led critics to point to the Xaraburi Dam as a contributor to the problem. Xayaburi Power counters that the facility is a run-of-river dam, so outflow from the 514 million cubic metre reservoir equals inflow.[34] The power company claims it cannot share the inflow and outflow levels of the dam as the information is classified in accordance with the company's Lao government contract.[35]

References

  1. ^ "Xayaburi Hydroelectric Power Project: Fast Facts". Xayaburi Power Company Ltd (XPCL). Archived from the original on 6 November 2018. Retrieved 25 July 2019.
  2. ^ a b c "Proposed Xayaburi Dam Project – Mekong River" (PDF). Procedures for Notification, Prior Consultation and Agreement (PNPCA). Mekong River Commission Secretariat. 24 March 2011. Retrieved 26 April 2012.
  3. ^ a b c Wipatayotin, Apinya (20 July 2019). "Dam tests spark crisis". Bangkok Post. Retrieved 20 July 2019.
  4. ^ a b "CK gets B19bn environmental contract for Xayaburi dam". Bangkok Post. 18 May 2016. Retrieved 13 July 2017.
  5. ^ "Thai govt urged not to buy power from Laos dam". The Straits Times. 26 July 2019. Retrieved 27 July 2019.
  6. ^ "Construction forges ahead at Xayaburi Dam project". Bangkok Post. 22 July 2012.
  7. ^ Fisher, Jonah (5 November 2012). "Laos approves Xayaburi 'mega' dam on Mekong". BBC News. British Broadcasting Corporation. Retrieved 6 November 2012.
  8. ^ a b "Thai state agencies likely to get away with Xayaburi Dam construction". Prachatai English. 2015-11-30. Retrieved 1 December 2015.
  9. ^ a b c d e f The Xayaburi Dam — A Looming Threat To The Mekong River (PDF). International Rivers. January 2011. Retrieved 2011-02-06.
  10. ^ "The Facts - Proposed Xayaburi Hydropower Project Prior Consultation Process". Mekong River Commission. Retrieved 25 July 2019.
  11. ^ a b Trandem, Ame (2011-01-15). "The Mekong River's Pandora s box". VnnNews. Retrieved 2011-02-06.
  12. ^ Petty, Martin (2011-06-23). "Laos defies neighbours on dam project-environmentalists". Reuters. Retrieved 2011-07-06.
  13. ^ a b Kurlantzick, Joshua (2011-06-30). "In Southeast Asia, Big Dams Raise Big Concerns". The Council on Foreign Relations. Retrieved 2011-07-06.
  14. ^ "Notification of Contract Signing With Xayaburi Power Company Limited" (in Thai). CH.Karnchang. 17 April 2012. Archived from the original on May 9, 2012. Retrieved 20 April 2012.
  15. ^ "Xayaburi dam building pact signed". Radio Free Asia. 17 April 2012. Retrieved 20 April 2012.
  16. ^ "Cambodia Warns Laos Over Mekong Dam". RFA. 19 April 2012. Retrieved 20 April 2012.
  17. ^ "Laos halts Xayaburi dam work". Asia Times. 11 May 2012. Archived from the original on 11 May 2012. Retrieved 11 May 2012.{{cite web}}: CS1 maint: unfit URL (link)
  18. ^ a b c TEAM Consulting Engineering & Management Co., Ltd. (2008-10-21). Xayaburi Hydroelectric Power Project (PDF). The MRC Regional Workshop on Discharge and Sediment Monitoring and Geomorphological Tool for the Lower Tool for the Lower Mekong Basin. Mekong River Commission. Archived from the original (PDF) on July 22, 2011. Retrieved 2011-02-06.
  19. ^ a b Sophat, Soeung (2010-12-20). "Lao Dam Raises Alarm Among Conservationists". VOA Khmer. Archived from the original on 2010-12-23. Retrieved 2011-02-06.
  20. ^ TEAM Consulting Engineering & Management Co., Ltd., Colenco (2012-01-16). "Feasibility Study, Xayaburi Hydroelectric Power Project, Lao PDR". Xayaburi Power Company Limited. Archived from the original on August 29, 2011. Retrieved 2012-01-16.{{cite web}}: CS1 maint: multiple names: authors list (link)
  21. ^ "Xayaburi Hydroelectric Power Project". CH. Karnchang. Retrieved 1 December 2015.
  22. ^ Bloomberg Businessweek. "Company Overview of Xayaburi Power Company Limited". Archived from the original on August 8, 2014. Retrieved 10 March 2013. {{cite web}}: |last= has generic name (help)
  23. ^ Banktrack. "Dodgy Deal: Xayaburi dam project L". Retrieved 10 March 2013.
  24. ^ International Rivers. "Xayaburi Dam". Retrieved 10 March 2013.
  25. ^ Pöyry (9 November 2012). "Pöyry supervises the construction of the Xayaburi hydropower project as Government of Lao Engineer". Archived from the original on January 4, 2015. Retrieved 10 March 2013.
  26. ^ a b International Rivers (26 August 2012). "Pöyry Responds on its Role in the Xayaburi Dam". Retrieved 10 March 2013.
  27. ^ CNR Press Release. "Xayaburi Dam Project:Clarifications by CNR" (PDF). Retrieved 10 March 2013.
  28. ^ "Substandard dam assessment opens way to fisheries destruction on Mekong" (Press release). World Wildlife Fund. Retrieved 31 May 2011.
  29. ^ a b IRIN News "Laos: Decision expected on controversial Mekong dam", 25 February 2011
  30. ^ Buncombe, Andrew (20 April 2011). "Mekong ecology in the balance as Laos quietly begins work on dam". The Independent. London. Archived from the original on 2022-05-07. Retrieved 2011-04-20.
  31. ^ a b "Mekong dam plans threatening the natural order". The Australian. 2011-06-29.
  32. ^ Rujivanarom, Pratch (4 April 2018). "Mekong River dams 'will harm food security'". The Nation. Retrieved 10 April 2018.
  33. ^ "Dam disaster on the way" (Opinion). Bangkok Post. 20 July 2019. Retrieved 20 July 2019.
  34. ^ Wipatayotin, Apinya (28 July 2019). "Xayaburi Dam in clear, says operator". Bangkok Post. Retrieved 28 July 2019.
  35. ^ "Xayaburi Dam partly to blame for Mekong Basin crisis: activists". The Nation. 25 July 2019. Retrieved 25 July 2019.

Read other articles:

This is a list of currently active separatist movements in North America. Separatism includes autonomism and secessionism. Criteria What is and is not considered an autonomist or secessionist movement is sometimes contentious. Entries on this list must meet three criteria: They are active movements with active members. They are seeking greater autonomy or self-determination for a geographic region (as opposed to personal autonomy). They are citizens/people of the conflict area and do not com...

 

 

Pemandangan Pulau Ellaidhoo dan Bathaala dari udara Ellaidhoo (Divehi : އެއްލައިދޫ) adalah sebuah pulau kecil yang merupakan bagian dari Atol Alif Alif di negara Maladewa. Ellaidhoo merupakan salah satu pulau di Maladewa yang telah disulap menjadi hotel untuk wisatawan sejak tahun 1985, dan hotel ini disebut Ellaidhoo Maldives Resort[1] Geografi Ellaidhoo terletak di Maladewa tengah, tepatnya di sebelah timur atoll Ari, dan masuk ke dalam wilayah administratif Alif Alif...

 

 

Kartu kredit Sistem kartu kredit adalah suatu jenis penyelesaian transaksi ritel dan sistem kredit, yang namanya berasal dari kartu plastik yang diterbitkan kepada pengguna sistem tersebut. Kartu kredit adalah salah satu instrumen utang yang dikeluarkan oleh pihak bank serta memiliki nilai peminjaman yang harus dikembalikan ke bank penerbit dalam jangka waktu tertentu.[1] Kartu kredit biasanya mengenakan tingkat persentase tahunan yang lebih tinggi dibandingkan bentuk pinjaman konsume...

Inventions of the Byzantine empire heir of the Roman The characteristic multi-domed profile of the Byzantine Hagia Sophia, the first pendentive dome in history, has shaped Orthodox and Islamic architecture alike.[1] This is a list of Byzantine inventions. The Byzantine or Eastern Roman Empire represented the continuation of the Roman Empire after a part of it collapsed. Its main characteristics were Roman state traditions, Greek culture and Christian faith.[2] Architecture Cro...

 

 

1806 Battle during the War of the Fourth Coalition Battle of CzarnowoPart of the War of the Fourth CoalitionThe Russian army defended the line of the Wkra River.Date23 December 1806[1]LocationCzarnowo, Poland52°28′31″N 20°46′23″E / 52.475278°N 20.773056°E / 52.475278; 20.773056Result French victory[1]Belligerents French Empire Russian Empire Kingdom of PrussiaCommanders and leaders Napoleon Bonaparte Louis Davout Jean Bessières Pierre Auger...

 

 

Airport serving London, England, United Kingdom For other uses, see Luton Airport (disambiguation). Not to be confused with Lutong Airport. This article needs attention from an expert in Photography. The specific problem is: New images are needed as the airport exterior looks considerably different today than pictured after it underwent major expansion. WikiProject Photography may be able to help recruit an expert. (August 2022) London Luton AirportIATA: LTNICAO: EGGWSummaryAirport typePublic...

Head of the United States Department of the Treasury Secretary of the Treasury redirects here. For other uses, see Secretary of the Treasury (disambiguation). Not to be confused with Treasurer of the United States. United States Secretary of the TreasurySeal of the U.S. Department of the TreasuryFlag of the secretaryIncumbentJanet Yellensince January 26, 2021United States Department of the TreasuryStyleMadam Secretary (informal)The Honorable (formal)Member ofCabinet of the United StatesU...

 

 

جي بي لاغونا 2017 تفاصيل السباقسلسلة3. جي بي لاغونامنافسةطواف أوروبا للدراجات 2017 1.2‏التاريخ19 فبراير 2017المسافات158 كمالبلد كرواتيانقطة البدايةفونتانا [الإنجليزية]‏نقطة النهايةبوريكالفرق14عدد المتسابقين في البداية150عدد المتسابقين في النهاية109متوسط السرعة43٫593 كم/سال�...

 

 

Saint-Maurice-la-ClouèrecomuneSaint-Maurice-la-Clouère – Veduta LocalizzazioneStato Francia Regione Nuova Aquitania Dipartimento Vienne ArrondissementMontmorillon CantoneLussac-les-Châteaux TerritorioCoordinate46°22′N 0°25′E / 46.366667°N 0.416667°E46.366667; 0.416667 (Saint-Maurice-la-Clouère)Coordinate: 46°22′N 0°25′E / 46.366667°N 0.416667°E46.366667; 0.416667 (Saint-Maurice-la-Clouère) Superficie39,67 km² Abitanti1...

2016年美國總統選舉 ← 2012 2016年11月8日 2020 → 538個選舉人團席位獲勝需270票民意調查投票率55.7%[1][2] ▲ 0.8 %   获提名人 唐納·川普 希拉莉·克林頓 政党 共和黨 民主党 家鄉州 紐約州 紐約州 竞选搭档 迈克·彭斯 蒂姆·凱恩 选举人票 304[3][4][註 1] 227[5] 胜出州/省 30 + 緬-2 20 + DC 民選得票 62,984,828[6] 65,853,514[6]...

 

 

Montenegrin basketball player This article uses bare URLs, which are uninformative and vulnerable to link rot. Please consider converting them to full citations to ensure the article remains verifiable and maintains a consistent citation style. Several templates and tools are available to assist in formatting, such as reFill (documentation) and Citation bot (documentation). (August 2022) (Learn how and when to remove this message) Jelena DubljevićNo. 37 – Botaş SKPositionPower for...

 

 

Representation of the breadth of the Internet using visual graphics Visualization from the Opte Project of the various routes through a portion of the Internet in 2005 The Opte Project, created in 2003 by Barrett Lyon,[1] seeks to generate an accurate representation of the breadth of the Internet using visual graphics.[2][3] Lyon believes that his network mapping can help teach students more about the Internet while also acting as a gauge illustrating both overall Inte...

Not to be confused with Oakleigh District Football Club. Australian rules football club OakleighNamesFull nameOakleigh Football ClubNickname(s)Devils, Oaks, Purple and GoldsClub detailsFounded1891Dissolved1994Colours  Purple   GoldCompetitionMelbourne District Association (1891–1928)Victorian Football Association (1929–1994)PremiershipsVFA Div 1 (6) 193019311950195219601972 VFA Div 2 (2) 19671988 MDA (3) 190719241928Ground(s)Warrawee ParkUniforms Home The Oakleigh Football Club,...

 

 

Konferensi Tingkat Tinggi Australia G-20 2014Logo KTT G20 Australia 2014Tuan rumahAustraliaTanggal15–16 November 2014TempatBrisbane Convention & Exhibition CentreKotaBrisbanePesertaAnggota G20Undangan: Mauritania, Myanmar, Selandia Baru, Senegal, Spanyol, SingapuraSebelumnyaKTT G20 Sankt-Peterburg 2013SelanjutnyaKTT G20 Antalya 2015Situs web[1] Konferensi Tingkat Tinggi Australia G-20 2014 adalah pertemuan kesembilan para kepala pemerintahan G-20.[1] Acara ini dilangsungkan di B...

 

 

American politician John Dailey127th Mayor of TallahasseeIncumbentAssumed office November 19, 2018Preceded byAndrew Gillum Personal detailsBornJohn Evans Dailey (1972-12-07) December 7, 1972 (age 51)Miami, Florida, U.S.Political partyDemocraticSpouseVirginia DaileyChildren2EducationFlorida State University, Tallahassee (BA, MPA)London School of Economics (MA) John Evans Dailey (born December 7, 1972) is an American politician from the state of Florida. He is the mayor of Tallahassee,...

Abbaye de la Chaise-DieuCloître de l'abbaye de La Chaise-Dieu.PrésentationType AbbatialeCulte Catholique romainRattachement Saint-SiègeFondation 1043Diocèse Diocèse du Puy-en-VelayStyle GothiqueConstruction 1043-1400Religion CatholicismeOrdre religieux Ordre de Saint-BenoîtPatrimonialité Inscrit MH (1941) Classé MH (2009, 2014)Site web Site de l'Abbaye de La Chaise-DieuLocalisationdépartement Haute-LoireCommune La Chaise-DieuCoordonnées 45° 19′ 15″ N, 3...

 

 

2007 Denver mayoral election ← 2003 May 1, 2007 2011 → Turnout41.92%   Candidate John Hickenlooper Danny F. Lopez Party Nonpartisan Nonpartisan Popular vote 68,568 10,053 Percentage 86.30% 12.65% Mayor before election John Hickenlooper Democratic Elected Mayor John Hickenlooper Democratic Elections in Colorado Federal government Presidential elections 1876 1880 1884 1888 1892 1896 1900 1904 1908 1912 1916 1920 1924 1928 1932 1936 1940 1944 1948 1952 1956 1960 ...

 

 

Musical instrument BendirA bendir with snaresHornbostel–Sachs classification211.3(Membranophone) The bendir (Arabic: بندير, bindīr; pl.: بنادير, binādīr) is a wooden-framed frame drum of North Africa and Southwest Asia.[1] The bendir is a traditional instrument that is played throughout North Africa, as well as in Sufi ceremonies; it was played, too, in Ancient Egypt and Mesopotamia.[2] In Turkish, the word bendir means a big hand frame drum.[citation neede...

Ethnic group Caribbean BraziliansCaraíba-brasileiroBarbadian workers in Porto Velho, c.1900Total populationc. UnknownRegions with significant populationsBrazil: Mainly Northern BrazilLanguagesPortuguese, Haitian Creole and many othersReligionPredominantly Roman Catholicism. Minorities practise African diasporic religions, are Irreligious or have another faithsRelated ethnic groupsBritish African-Caribbeans, West Indian Americans, Caribbean Australians, Black Canadians, Afro-Brazilians, Barba...

 

 

Department of the state government of California California State ParksCalifornia Department of Parks and RecreationAgency overviewFormed1864 (First State Park) 1927 (Bureaucratic Forming) [1]Headquarters715 P St, Sacramento, CaliforniaEmployees1,451 permanent staff, 1,416 seasonal (2016-17)[2]Annual budget$1.039 billion (2023)[3]Agency executiveArmando Quintero[4], DirectorParent agencyCalifornia Natural Resources AgencyWebsiteparks.ca.gov The California State...