Western Freeway (Mumbai)

Western Freeway
Route information
Length30 km (19 mi)
Major junctions
FromMarine Drive
ToKandivli
Location
CountryIndia
StatesMaharashtra
Major citiesMumbai
Highway system

The Western Freeway was a proposed controlled-access highway in Mumbai, India that would stretch from Marine Drive in South Mumbai to Kandivli in the north, a distance of 29 km. The project envisioned the construction of four major sea links over the Arabian Sea along Mumbai's western coastline to reduce traffic-congestion between the Western Suburbs and South Mumbai.

The first sea link, known as the Bandra–Worli Sea Link, was completed in June 2009, and connects Bandra in the north and Worli in the south with a cable-stayed bridge spanning the Mahim Bay. This development relieved congestion on the Mahim Causeway, which until then had been the only road between the Western Suburbs and South Mumbai on the western sea front. The second sea bridge, the Versova–Bandra Sea Link, is currently under construction and is expected to be completed by 2027.

In 2011, the Coastal Road was proposed as a lower-cost alternative to the Western Freeway. The 8-lane, 29.2-km long Coastal Road would run along Mumbai's western coastline connecting Marine Lines to Kandivali. The Coastal Road connects Marine Lines with the Worli end of the Bandra–Worli Sea Link through roads built on reclaimed land and tunnels rendering the proposed Haji Ali–Nariman Point Sea Link and Worli-Haji Ali Sea Link of the Western Freeway redundant. Construction of a 9.98 km section of the Coastal Road between Marine Lines and Worli began in 2018 and is expected to be completed by 2023.

This section would have been an extension of the sea-link from Haji Ali to Priyadarshini Park, and onward to Malabar Hill. The section was sub-divided into the following:

  • Coastal road from north of Princess Street flyover. It would be a cut-and-cover tunnel which would connect to a bored tunnel under Malabar Hill. The tunnel will exit Napean Sea Road beyond Priyadarshini Park.
  • From Priyadarshini Park till Mahalaxmi Temple. The committee has recommended a coastal road through reclamation.
  • A coastal road, at Haji Ali Bay, through reclamation for an 8-lane road.
  • A connector bridge running around the Haji Ali Dargah. This will connect the road to the north end of the Haji Ali Bay till the Baroda Palace Point.[1]

On 16 April 2013, Chief Minister Prithviraj Chavan told the state Assembly that the Nariman Point–Haji Ali sea link was "impractical". Chavan stated, "As far as the sea link is concerned, the consultant had ruled out the possibility of taking it further than Haji Ali. We will look at other alternatives."[2] Chavan also said that he would promote a coastal road as an alternative to the sea link.[3][4]

Worli–Haji Ali Section

This section is the immediate extension of the Bandra–Worli Sea Link further into the heart of Mumbai city. The current design allows for a clover leaf junction at Khan Abdul Ghaffar Khan Marg (at Worli) for ramp up of traffic onto the sea link. This includes twin carriageway of 3.315 km termed as main line and connectors at Worli and Haji Ali. While mainline is to be made of entirely precast segmental spans, the connectors will be made of segmental and I beams. A 10-lane toll plaza is proposed at the start of the section at Worli.

The Bandra-Worli Sea Link

The Bandra-Worli Sea Link was opened to traffic on 30 June 2009. The Sea Link reduces travel time between Bandra and Worli from 45 to 60 minutes to 7 minutes. The link has an average daily traffic of around 37,500 vehicles per day. The toll charged is 70 (82¢ US) for one-way and 105 (US$1.20) for a return journey.

There are plans to add an 800 m bridge to turn the Worli connector from a 4-lane to 8-lane freeway.

The Versova-Bandra Sea Link (VBSL) is an Under Construction 9.89-km long sealink that connects Bandra with Versova. It is a northward extension of the Bandra-Worli Sea Link. The VBSL will be built on pillars 900 metres into the Arabian Sea.[5] Juhu beach will have a 150-metre-long cable-stayed portion.[6] The freeway should reduce congestion on the Western Express Highway and the Western Line of the Mumbai Suburban Railway.[6] The 8-lane sea link will pass through Bandra, Juhu Koliwada, Versova and Carter Road.[7]

The project will be developed through public private partnership on a design, build, finance, operate and transfer basis,[8] The cost of the project was originally estimated as 4,045 crore (US$470 million) in 2012. This escalated to 4,340 crore (US$510 million) in 2013, it is currently estimated to cost 5,975 crore (US$700 million).[9] The project is expected to be completed five years from its commencement.[7]

The Versova-Bandra Sea Link received environmental clearance, under certain conditions, from the Ministry of Environment and Forests (MoEF) in January 2013.[5]

A cabinet sub-committee on infrastructure chaired by Chief Minister Prithviraj Chavan cleared the project on 15 January 2014.[10] Some observers felt that the move was an attempt to keep Nationalist Congress Party (NCP) happy prior to the 2014 Lok Sabha elections, as this project and the Pune Ring Road project which was also approved the sub-committee, would be undertaken by the MSRDC, which was then headed by the NCP.[5][11] The project had been pending for approval for the past three years.[12] The fate of the sealink had been uncertain after Chavan said that coastal roads were less expensive to build. Chavan stated that he also favoured coastal roads because they had less environmental hurdles than a sealink. BMC officials stated that the government had not clarified the future of the coastal road project, after approving the VBSL.[13]

The MSRDC invited request for qualification (RFQ) from companies interested in constructing the VBSL on 2 March 2014. The agency conducted a pre-bid conference for potential bidders on 28 March. The last date for the submission of technical bids was fixed as 30 May, and the MSRDC plans to open technical bids on 31 May, as per the tender notice. The MSRDC estimated that the project concession period to be 35 years in the absence of any viability gap funding (the state's financial contribution in a PPP project). However, after some members of the infrastructure sub-committee expressed reservations about the long concession period, the corporation decided to seek 20% from the Union government, which the MSRDC estimates will reduce the concession period to about 28–30 years.[14]

History

In its report, submitted in January 2012, the Joint Technical Committee advised the government to build a 35.6 km coastal freeway from Manora MLA Hostel at Nariman Point to Kandivali. The project is estimated to cost 10,000 crore.[15]

Coastal Regulation Zone (CRZ) norms in India disallow reclamation of land. Construction of the coastal freeway would require a relaxation of the CRZ norms, as certain sections are proposed on reclaimed land.[16] The change in norms can only be done through an amendment to the law by the Central Government. During a meeting between Prithviraj Chavan and Union environment minister Jayanthi Natarajan on 20 June 2013, Natarajan expressed concerns about the implications of relaxing CRZ norms, on creeks and mangroves. However, the minister stated that she would "put the state's proposal at the next meeting [24 June 2013] of the National Coastal Zone Management Authority".[17] However, despite specific assurance from the minister, the National Coastal Zone Management Authority (NCZMA) decided not to include the coastal road plan in their next meeting's agenda.[16]

Coastal Freeway

The Coastal Freeway is a proposed alternative to the Western Freeway. The 29.2-km freeway is proposed to run along Mumbai's western coastline connecting Marine Lines in the south to Kandivli in the north. The estimated cost of the project is 14,000 crore (US$1.6 billion). In the first phase of the project, the road will connect Princess Street and the Bandra-Worli Sea Link, and is expected be completed by 2019. A tunnel beginning at Chowpatty will link to Priyadarshini park, after which the coastal road will pass through the Bandra-Worli Sea Link.[18] Work on the second phase, a sea link between Bandra and Kandivali, will begin after the completion of the first phase. A further extension of the road to Vasai-Virar has also been proposed.[19]

History

In 2011, Chief Minister Prithviraj Chavan asked the MSRDC to think of building coastal roads instead of capital intensive sea links. He appointed a Joint Technical Committee, comprising experts and officials, in 2012 under the then Municipal commissioner Subodh Kumar to study the plan to build a coastal road. In its report, submitted in January 2012, the committee advised the government to build a 35.6 km coastal freeway from Manora MLA Hostel at Nariman Point to Kandivali to ease traffic congestion. The project was estimated to cost 10,000 crore and would have consisted of roads built on reclaimed land as well as stilts, bridges and tunnels. The committee was against building any more sea links and pointed out that the coastal road would help save 120 billion of public money.[15] The 35.6 km road was proposed to begin near Manora (MLA Hostel), with entry and exit points at Jagannath Bhosale Marg, move along Marine Drive and lead into a tunnel that would go under Malabar Hill and exit on the other side of Priyadarshini Park. This stretch was proposed to be built on reclaimed portions up to Haji Ali, and then to Lala Lajpatrai Road in Worli. The coastal freeway would then be connected to the Worli arm of the Bandra-Worli Sea Link by a bridge. On the Bandra side, the coastal road skirting the fort would connect the coastal freeway up to Chimbai village, where a bridge was proposed. A road by reclamation of mangroves, further north, or a road on stilts, and an elevated road between Oshiwara and Malad was also proposed. The proposed freeway would have had 18 entry and exit points along its route.[20] The project is estimated to cost 8,000-10,000 crore, and take 5 years to complete.[21] Critics of the freeway opposed it due to the reclamation required and have also cited possible environmental degradation along the coast.[17][22]

Coastal Regulation Zone (CRZ) norms in India disallow reclamation of land. Construction of the coastal freeway would require a relaxation of the CRZ norms, as certain sections are proposed on reclaimed land.[16] The change in norms can only be done through an amendment to the law by the Central Government. After discussing the project on 10 April 2013, the Maharashtra coastal zone management authority (MCZMA), the state's apex environment body, urged the centre to amend the CRZ notification to permit "reclamation for roads". The MCZMA stated that reclamation should not be permitted for any other development activity and that the high tide line must not be altered. The MCZMA also argued that the ring road would serve as a protection wall from inland flooding, besides being a vital road link for decongesting traffic.[20] During a meeting between Prithviraj Chavan and Union environment minister Jayanthi Natarajan on 20 June 2013, Natarajan expressed concerns about the implications of relaxing CRZ norms, on creeks and mangroves. However, the minister stated that she would "put the state's proposal at the next meeting [24 June 2013] of the National Coastal Zone Management Authority".[17] However, despite specific assurance from the minister, the National Coastal Zone Management Authority (NCZMA) decided not to include the coastal road plan in their next meeting's agenda.[16]

During the 2014 assembly elections, the BJP promised to implement the project if elected. On 6 June 2015, the State Government signed an MoU with the Dutch Government for technical co-operation in implementing the project. The Netherlands is known for its environment-friendly reclamation and the use of the sea. On 8 June 2015, the coastal road project received clearance from the Union Ministry of Environment and Forests.[21]

Initial work on the project began on 26 November 2016. Shiv Sena president Uddhav Thackeray stated that a survey of the soil at the seabed was being undertaken. The foundation stone for the project for the coastal road project is scheduled for monsoon 2017.[19]

References

  1. ^ "Civic body to amend budget for ambitious coastal freeway plan". Hindustan Times. 23 March 2012.
  2. ^ "Nariman Pt sea link, BRTS projects scrapped". The Times of India. TNN. 17 April 2013. Archived from the original on 21 April 2013. Retrieved 26 June 2013.
  3. ^ "Worli-Haji Ali sea link stuck in cabinet sub-committee". The Indian Express. 18 April 2013. Retrieved 26 June 2013.
  4. ^ "Haji Ali-Nariman Point sealink impractical: CM". Dnaindia.com. 17 April 2013. Retrieved 26 June 2013.
  5. ^ a b c Eye on polls, Prithviraj Chavan clears two mega projects | Latest News & Updates at DNAIndia.com
  6. ^ a b Bandra-Worli sea link may extend to Versova – The Times of India
  7. ^ a b City roundup – Free Press Journal
  8. ^ Jog, Sanjay (3 March 2014). "Maharashtra invites bids for Versova-Bandra Sea Link project". Business Standard. India.
  9. ^ "Global bids floated for Versova-Bandra Sea Link by MSRDC". 3 March 2014.
  10. ^ After a year’s wait, Bandra-Versova sea link project back on table | The Indian Express
  11. ^ A bridge that widens the gap | Latest News & Updates at DNAIndia.com
  12. ^ Bandra-Versova sea link project gets Cabinet nod
  13. ^ Mumbai: Go-ahead to sea link extension makes coastal road plan hazy | Latest News & Updates at DNAIndia.com
  14. ^ "MSRDC invites pre-qualification bids for Bandra-Versova sea link". 3 March 2014.
  15. ^ a b "CM roots for coastal road, says sea links impractical". The Indian Express. 17 April 2013. Retrieved 26 June 2013.
  16. ^ a b c d Sandeep Ashar (26 June 2013). "Mumbai coastal road plan not on Centre's 'agenda' yet". The Times of India. TNN. Retrieved 26 June 2013.
  17. ^ a b c "Hunt resumes for consultant for Rs 8,000-cr western freeway". The Times of India. 21 April 2013. Archived from the original on 24 April 2013. Retrieved 26 June 2013.
  18. ^ "Coastal road will be extended to Mumbai-Ahmedabad highway: Uddhav". Hindustan Times. 27 November 2016. Retrieved 26 November 2016.
  19. ^ a b "Bhoomipujan of Coastal Road project by next monsoon: Uddhav". ptinews.com. Retrieved 26 November 2016.
  20. ^ a b "Coastal road inches closer to reality". The Times of India. 14 June 2013. Archived from the original on 27 September 2013. Retrieved 26 June 2013.
  21. ^ a b "Mumbai: Coastal road from Kandivli to Nariman Point gets the thumbs-up".
  22. ^ "Even Uttarakhand tragedy will not stop reckless development". Dnaindia.com. 8 April 2013. Retrieved 26 June 2013.

Read other articles:

Monumen Bom Bali Bom Bali merujuk pada dua peristiwa pengeboman besar di Bali: Bom Bali 2002 - bom di Kuta Bom Bali 2005 - bom di Jimbaran dan Kuta Selain itu Bombali juga dapat merujuk pada Distrik Bombali di Sierra Leone Halaman disambiguasi ini berisi daftar artikel beberapa peristiwa sejarah yang memiliki nama yang sama. Jika Anda mencapai halaman ini dari sebuah pranala internal, Anda dapat membantu mengganti pranala tersebut ke peristiwa sejarah yang tepat.

 

Nonprofit organization in Washington D.C., United States This article is about the Washington, D.C., think tank. For other uses, see Third Way (disambiguation). This article contains content that is written like an advertisement. Please help improve it by removing promotional content and inappropriate external links, and by adding encyclopedic content written from a neutral point of view. (December 2013) (Learn how and when to remove this template message) Third WayFounded2005; 19...

 

This article needs additional citations for verification. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed.Find sources: New Skin for the Old Ceremony – news · newspapers · books · scholar · JSTOR (July 2014) (Learn how and when to remove this template message) 1974 studio album by Leonard CohenNew Skin for the Old CeremonyStudio album by Leonard CohenReleasedAugust ...

Municipality and town in Córdoba Department, ColombiaPuerto LibertadorMunicipality and town FlagNickname: [Bijao]Location of the municipality and town of Puerto Libertador in the Córdoba Department of Colombia.Country ColombiaDepartmentCórdoba DepartmentPopulation (2020 est.[1]) • Total55,622Time zoneUTC-5 (Colombia Standard Time) Puerto Libertador (Spanish pronunciation: [ˈpweɾto liβeɾtaˈðoɾ]) is a town and municipality located in the Cór...

 

Hj.Sri WahyuniS.Sos. Anggota Dewan Perwakilan Rakyat Republik IndonesiaPetahanaMulai menjabat 1 Oktober 2019PresidenJoko WidodoDaerah pemilihanJawa Timur VII Informasi pribadiLahir8 Juni 1967 (umur 56)Murung Pudak, TabalongPartai politikNasDemSuami/istriIpong MuchlissoniAnakMazaya Zhafarina I.Muhammad Zata M.Muhammad Fitra Y.Alma materUniversitas 17 Agustus 1945 SamarindaPekerjaanPolitikusSunting kotak info • L • B Hj. Sri Wahyuni, S.Sos. (lahir 8 Juni 1967) adalah poli...

 

Questa voce o sezione sull'argomento sport invernali è priva o carente di note e riferimenti bibliografici puntuali. Sebbene vi siano una bibliografia e/o dei collegamenti esterni, manca la contestualizzazione delle fonti con note a piè di pagina o altri riferimenti precisi che indichino puntualmente la provenienza delle informazioni. Puoi migliorare questa voce citando le fonti più precisamente. Segui i suggerimenti del progetto di riferimento. SnowboardUno snowboarder mentre scende...

Сибирский горный козёл Научная классификация Домен:ЭукариотыЦарство:ЖивотныеПодцарство:ЭуметазоиБез ранга:Двусторонне-симметричныеБез ранга:ВторичноротыеТип:ХордовыеПодтип:ПозвоночныеИнфратип:ЧелюстноротыеНадкласс:ЧетвероногиеКлада:АмниотыКлада:СинапсидыКла�...

 

Sexual attraction between members of the same sex The examples and perspective in this article deal primarily with Western culture and do not represent a worldwide view of the subject. You may improve this article, discuss the issue on the talk page, or create a new article, as appropriate. (December 2023) (Learn how and when to remove this message) Saint Sebastian, by Carlo Saraceni (c1610-15), Castle Museum, Prague. The image of Sebastian pierced by arrows has regularly been described as ho...

 

この項目には、一部のコンピュータや閲覧ソフトで表示できない文字が含まれています(詳細)。 数字の大字(だいじ)は、漢数字の一種。通常用いる単純な字形の漢数字(小字)の代わりに同じ音の別の漢字を用いるものである。 概要 壱万円日本銀行券(「壱」が大字) 弐千円日本銀行券(「弐」が大字) 漢数字には「一」「二」「三」と続く小字と、「壱」「�...

此條目没有列出任何参考或来源。 (2013年10月29日)維基百科所有的內容都應該可供查證。请协助補充可靠来源以改善这篇条目。无法查证的內容可能會因為異議提出而被移除。 图帕西瓜拉Tupaciguara市镇图帕西瓜拉在巴西的位置坐标:18°35′34″S 48°42′18″W / 18.5928°S 48.705°W / -18.5928; -48.705国家巴西州米纳斯吉拉斯州面积 • 总计1,826.028 平方公里(7...

 

American jazz ensemble Groove CollectiveCore four in its own imageBackground informationOriginNew York City, United StatesGenresJazz-funk, soul, jazz, Latin, discoYears active1990–presentWebsitewww.instagram.com/groovecollectiveofficial/Musical artist Groove Collective at Celebrate Brooklyn Groove Collective is an American band. In 2007 they were nominated for a Grammy Award for Best Contemporary Jazz Album of the Year for the release People People Music Music on the Savoy Jazz label. S...

 

هنودمعلومات عامةنسبة التسمية الهند التعداد الكليالتعداد قرابة 1.21 مليار[1][2]تعداد الهند عام 2011ق. 1.32 مليار[3]تقديرات عام 2017ق. 30.8 مليون[4]مناطق الوجود المميزةبلد الأصل الهند البلد الهند  الهند نيبال 4,000,000[5] الولايات المتحدة 3,982,398[6] الإمار...

Horse sacrifice ritual followed by the Śrauta tradition of Vedic religion Ashvamedha yajna of Yudhisthira The Ashvamedha (Sanskrit: अश्वमेध, romanized: aśvamedha)[1] was a horse sacrifice ritual followed by the Śrauta tradition of Vedic religion. It was used by ancient Indian kings to prove their imperial sovereignty: a horse accompanied by the king's warriors would be released to wander for a year. In the territory traversed by the horse, any rival could dispute...

 

Location of Queens County in New York Map all coordinates using OpenStreetMap Download coordinates as: KML GPX (all coordinates) GPX (primary coordinates) GPX (secondary coordinates) List of the National Register of Historic Places listings in Queens, New York This is intended to be a complete list of properties and districts listed on the National Register of Historic Places in Queens, New York. The locations of National Register properties and districts (at least for all showing latitude a...

 

OkushiriNative name: 奥尻島, Okushiri-tōRelief MapLocation of Okushiri off HokkaidoGeographyLocationEast AsiaCoordinates42°08′57″N 139°28′02″E / 42.14917°N 139.46722°E / 42.14917; 139.46722ArchipelagoJapanese archipelagoArea142.97 km2 (55.20 sq mi)Length27 km (16.8 mi)Width11 km (6.8 mi)Coastline84 km (52.2 mi)Highest elevation584 m (1916 ft)Highest pointMount KamuiAdministration Japa...

この項目では、兵庫県丹波市について説明しています。 その他の「丹波市」については「丹波市 (曖昧さ回避)」をご覧ください。 ポケットモンスターシリーズに登場する「タンバシティ」については「ジョウト地方」をご覧ください。 「丹波篠山市」あるいは「京丹波町」とは異なります。 たんばし 丹波市 円通寺の紅葉 丹波市旗2004年11月1日制定 丹波市章 国 日...

 

Not to be confused with 2016 United States House of Representatives elections in Massachusetts. 2016 Massachusetts House of Representatives election ← 2014 November 8, 2016 2018 → All 160 seats in the Massachusetts House of Representatives81 seats needed for a majority   Majority party Minority party   Leader Robert DeLeo Bradley Jones Jr. Party Democratic Republican Leader since January 27, 2009 November 21, 2002 Leader's seat 19th Suffolk 20th Midd...

 

North American soccer trophy Cascadia CupThe Cascadia Cup logo, designed by James BullenLocationPacific NortcascahwestTeams Portland Timbers Seattle Sounders FC Vancouver Whitecaps FC First meeting2004Stadiums BC Place Lumen Field Providence Park StatisticsMost winsOverall:Seattle / Vancouver (tie, 7 titles)MLS era:Seattle (5 titles) USL era:Vancouver (3 titles)Longest win streakSeattle (3, 2018–2021)[a]Current win streakVancouver (1, 2023) The Cascadia Cup is the name of the trophy...

Latvian conductor (born 1978) Andris NelsonsNelsons on 9 September 2015Born (1978-11-18) 18 November 1978 (age 45)Riga, Latvian SSROccupationConductorYears active2003–presentOrganizations BSO Leipzig Gewandhaus Orchestra CBSO Nordwestdeutsche Philharmonie LNOB Websitewww.andrisnelsons.com Andris Nelsons OBE (born 18 November 1978) is a Latvian conductor. He is currently music director of the Boston Symphony Orchestra and Gewandhauskapellmeister of the Leipzig Gewandhaus Orchestra....

 

أحمد فرج المصلي معلومات شخصية الميلاد 28 ديسمبر 1979 (العمر 44 سنة)بنغازي الطول 1.79 م (5 قدم 10 1⁄2 بوصة) مركز اللعب مهاجم الجنسية ليبيا  معلومات النادي النادي الحالي الترسانة الرقم 9 مسيرة الشباب سنوات فريق 1993–2000 التحدي المسيرة الاحترافية1 سنوات فريق مشاركات (أهدا�...