Timber Trail

Timber Trail
Above the Piropiro Valley; typical of the northern section of the Timber Trail
Length84 km (52 mi)
Locationborder of Waikato region and Manawatu-Wanganui region, New Zealand
TrailheadsPureora and Ongarue
UseWalking, cycling
Elevation change360 m (1,180 ft)
Highest point940 m (3,080 ft)
Lowest point200 m (660 ft)
DifficultyIntermediate to easy
SeasonYear round
SightsSuspension bridges, railway spiral, native bush
Hazardsmud, trees, storms

The Timber Trail, originally known as the Central North Island Rail Trail or Pureora Timber Trail, in the North Island of New Zealand is an 84-kilometre (52 mi) cycleway (also used by walkers and hunters) in Pureora Forest Park, fully opened in 2013, with 35 bridges (built by DoC staff, community max workers,[1] or contractors),[2] including eight large suspension bridges (one of the longest on a New Zealand cycleway, much more stable than the swing bridges used on older tracks). It is one of several cycleways developed as part of the New Zealand Cycle Trail and passes through some of the last remaining podocarp forests of rimu, tōtara, miro, mataī and kahikatea, as well as some exotic forestry and regenerating bush. About half the trail is on the track-bed of the old Ellis and Burnand Tramway, including a spiral and tunnel.

It is easier to start the Timber Trail from Pureora (Northern end of the Timber Trail) to Ongarue.[3] Although there is a hill climb up to Mt Pureora in this direction. Fit riders can cover the trail in a day.

There are three main access points to the Timber Trail:

  • North – Pureora Village, signposted from SH30 between Te Kūiti and Mangakino.
  • Centre – from Piropiro campsite at the end of Kokomiko Rd, Waimiha.
  • South – Ongarue, signposted from SH4.[4]

Northern section

Pureora to Piropiro (39.5 km) Track category: Intermediate/Grade 3

0–8 km Easy/Grade 2 Pureroa DoC Centre to the first shelter.

The trail begins in Pikiariki Ecological Area, about 200 metres (660 ft) from the DOC Pureora Field Base on Barryville Rd, turning left a few metres into the bush, on a boardwalk, then winding some 4 kilometres (2.5 mi) through tall podocarps (frequented by kākā),[4] over Whareana Stream, through a Douglas fir plantation, across Whareana Road and Cabbage Tree Rd before winding up through an area of regenerating toitoi, cabbage tree, five finger and kamahi. It crosses Tui Rd, to the shelter below Mt Pureora.[4]

8–23 kmMt Pureora to Angel's Rest grade 3 (intermediate)

The trail winds to 940 metres (3,080 ft),[4] within a 40-minute walk of the 1,165-metre (3,822 ft) Mt Pureora summit, through various stages of regenerating bush to the existing native bush edge to the top of the Ongarue River and an old logging road.[2]

115-metre (377 ft) Bog Creek bridge

Two large suspension bridges cross tributaries of the river at Bog Inn Creek (115 metres or 377 feet) and the similar sized Orauhora crossing.[5]

23–40 kmAngel’s Rest – Okauaka Ford – Maramataha River

Uses a logging road for some 6 kilometres (3.7 mi), then mainly Okauaka Road. 500 metres (1,600 ft) beyond the concrete ford and neighbouring trail bridge over Okauaka Stream, the track joins a tramway, crosses Okauaka Road again, and continues through the bush to Kokomiko Road and Piropiro campground. After the campground, the track rejoins the tramway to Maramataha Rodd, then follows Piropiro Stream on a new track to the Maramataha Bridge.[2]

Southern section

(Easy/Grade 2) 43 km Piropiro to Ongarue

40–52 kmPiropiro to Angels Rest Intermediate/Grade 3

141-metre (463 ft) Maramataha Bridge over the Maramataha River
Kilometre post 52 – each kilometre is marked

A 30-minute climb from the Piropiro campsite leads to the 141-metre (463 ft) Maramataha Bridge, some 60 metres (200 ft) above the Maramataha Gorge and the largest suspension bridge of its kind along any cycle trail in New Zealand. Construction required much rock drilling and anchor work. It is supported on 12.8-metre (42 ft) high glulam towers.[2]

52–64 kmMaramataha River – Deer Park junction – Waione Stream

South of the bridge the steepest climb on the trail zigzags to a plateau on a new track. From the plateau quad tracks lead to the north end of the Ellis and Burnand Tramway, Ongarue tramway, which the trail then mostly follows on easier gradients to Ongarue. These tramways were cleared in 2011.[6]

64–74 kmWaione Stream – Waikoura Stream – Goat Creek

A 40-metre (130 ft) suspension bridge crosses Waione Stream, then the tramway runs to Waikoura Stream, passing No. 11 and No. 10 camps, and the No. 9 tramway junction.[6] The information board says Waikoura Camp at No. 9 was the largest and last camp on this tramway, built in 1950 and closed in 1963, with 6 houses and 9 single men's huts. A 28-metre (92 ft) suspension bridge crosses Waikoura Stream and a tramway links to the 90-metre (300 ft) Mangatukutuku suspension bridge, then No. 7 tramway runs to Goat Creek.[6]

74–83 kmGoat Creek – Ongarue Spiral – Mangakahu Rd

A three span, curved, timber trestle bridge crosses Goat Creek, resembling many of the tramway bridges,[2] then 4 kilometres (2.5 mi) of tramway cleared in 2011 leads to the spiral.[6]

Ellis and Burnand tramway climbed 43 metres (141 ft) here

The Ongarue Spiral took the tramway up 43 metres (141 ft) on a grade the bush lokeys could cope with (for 6 kilometres or 3.7 miles the gradient averaged 1 in 30).[7] Below the spiral the tramway was built by cutting a ledge in the ignimbrite cliffs. It continues to drop until reaching the bank of the Mangakahu Stream. The final 4 kilometres (2.5 mi) are undulating to the end of the trail in a car park beside Mangakahu Road, 2 kilometres (1.2 mi) from Ongarue.

History

The Timber Trail, originally known as the Central North Island Rail Trail,[8] cost about $5.5m to build.[9] It was one of the seven 'Quick Start' Projects announced in 2009, which were publicised as promoting economic growth[10] The Timber Trail took longer to complete than some later projects, so it was the tenth New Zealand Cycle Trail to be completed since Prime Minister John Key had launched the cycleways with the Green Party.[11]

By mid-2011 only 23 kilometres (14 mi) was open, with tenders still not let for interpretation panels and five bridges.[12] It was then that the contract with the Ministry of Economic Development for community max and taskforce green workers ended. 12 staff had been trained in 12 months in basic woodwork, track construction, quad bike and 4WD driving and health and safety. DoC employed five from the MED scheme for six months to build 6 to 10 metres (20 to 33 ft) bridges, shelters, other structures, and some track construction. Another went on 'community max' with the recreation team.[12]

Ongarue Spiral restoration work began in July 2011. The tunnel was strengthened and the stream re-diverted out of it (it had been diverted in when the tramway was replaced by logging trucks). The tunnel ceiling was reinforced with mesh, a lower bridge built to the right of the original bridge to preserve bits of the original and remnants of the upper bridge preserved in the new trail bridge.[7]

Negotiations were held to build a 30-metre (98 ft) suspension bridge over Mangakahu Stream to end the trail further east on Mangakahu Rd, but the trail as built has another 4 kilometres (2.5 mi) of undulating ride keeping north of the stream, roughly following the tramway (see map below) to within 2 kilometres (1.2 mi) of Ongarue.[12]

In July 2011 Maramataha, Waione, and Waikoura bridges were tested to their 10-person weight limit using water weights to get council consent and 1.6 kilometres (0.99 mi) of track was built (though not surfaced).[12] Maramataha Bridge was finished in early October 2012 and opened on 1 November 2012.[4] The northern end Bog Creek and Orauhora suspension bridges were ready by December 2012.[7]

On 1 December 2012 southern section opening day 150 cyclists rode its four suspension bridges, the tramline, and Ongarue Spiral.[7]

The Timber Trail was declared fully open when the Minister of Conservation cut the ribbon on Saturday, 30 March 2013.[13]

After the opening improvements and maintenance continued; in winter 2013 additional pumice was helicoptered to boggy patches on the Mt Pureora section.[14] Other changes are likely. For example, there were concession negotiations about lodgings at Piropiro Flats to supplement the existing campground, where stumps had been cleared.[12]

Ellis and Burnand Ongarue tramway, now the southern end of the Timber Trail. Sourced from 1956 1" map sheet N92. Crown Copyright Reserved.

Most of the Timber Trail's southern section follows the tramway built by J. W. Ellis and Harry Burnand. Their timber sawmill at Ongarue was fed with logs (especially rimu) by a gradually growing network of tramways from 1903 until floods damaged the lines in 1958. From then until closure in 1966 the tramway was converted for use by logging trucks. However, as one of the best preserved bush tramways, it is considered a nationally significant site.[15]

Economic development

One of the purposes of the cycle trails was to encourage economic development in remote rural areas.[16]

See also

Further reading

  • A national history overview on bush tramways: Mahoney, P, 1998, The Era of the Bush Tramway in New Zealand, IPL, Wellington.[15]
  • Sparse Timber Sawmillers: Ken Anderson, 2007 ISBN 9780958298483 – a history of the logging, tramline and mill from 1903 until the mill closed in 1966.

References

Biographies of Ellis & Burnand directors –

Read other articles:

Beretta Model 12 Beretta M12S dengan popor lipat Jenis Pistol mitraliur Negara asal Italia Sejarah pemakaian Masa penggunaan 1961–present[1] Digunakan oleh See Users Pada perang Vietnam WarThe TroublesOperation Marajoara[2]Afghanistan warsLebanese Civil War[3]Iran-Iraq WarLibyan Civil War[4] Sejarah produksi Perancang Beretta Tahun 1950–1959[1] Produsen Beretta, Taurus, Defence Industries Corporation, MAS, PT Pindad Diproduksi 1...

 

 

Cette page contient des caractères spéciaux ou non latins. S’ils s’affichent mal (▯, ?, etc.), consultez la page d’aide Unicode. Groupe du Parti socialiste européen Chambre Parlement européen Législature(s) 1re, 2e, 3e, 4e5e et 6e Fondation 1953 Disparition 2009 (fondation de l'Alliance progressiste des socialistes et démocrates au Parlement européen avec le parti démocrate italien) Ancien(s) nom(s) groupe socialiste (1953-1992) Idéologie Social-démocratie modifie...

 

 

Mclass=notpageimage| Major mining areas in Colombia Gold    La Colosa, Quinchía Silver    Marmato Nickel    Cerro Matoso Platinum    Nóvita (TL) Emeralds    Muzo, Chivor Coal    Cerrejón, La Francia Salt    Nemocón, Zipaquirá This is a list of mining areas in Colombia.[1] The mineral industry of Colombia is large and diverse; the country occ...

Basilika Santa Perawan Maria Diangkat ke Surga dan Santo Sirilus dan Santo MetodiusBasilika Minor Santa Perawan Maria Diangkat ke Surga dan Santo Sirilus dan Santo Metodiusbahasa Ceska: Bazilika Nanebevzetí Panny Marie a svatého Cyrila a MetodějeBasilika Santa Perawan Maria Diangkat ke Surga dan Santo Sirilus dan Santo MetodiusLokasiVelehradNegara CekoDenominasiGereja Katolik RomaArsitekturStatusBasilika minorStatus fungsionalAktifAdministrasiKeuskupan AgungKeuskupan Agung Olomouc...

 

 

State election Not to be confused with 2022 United States House of Representatives elections in Kansas. 2022 Kansas House of Representatives election ← 2020 November 8, 2022 (2022-11-08) 2024 → All 125 seats in the Kansas House of Representatives63 seats needed for a majority   Majority party Minority party   Leader Daniel Hawkins Tom Sawyer Party Republican Democratic Leader's seat 100th district 95th district Seats before 86 39 Seats&...

 

 

Education policy in England This article is about the education policy in England. For other uses, see Free School. This article needs to be updated. Please help update this article to reflect recent events or newly available information. (February 2018) Michaela Community School is a free school with sixth form in London. A free school in England is a type of academy established since 2010 under the Government's free school policy initiative.[1] From May 2015, usage of the term was f...

Una notte da leoniI tre protagonisti incontrano Mike TysonTitolo originaleThe Hangover Lingua originaleinglese Paese di produzioneStati Uniti d'America Anno2009 Durata99 min Rapporto2,35:1 Generecommedia RegiaTodd Phillips SoggettoJon Lucas e Scott Moore SceneggiaturaJon Lucas e Scott Moore ProduttoreTodd Phillips, Daniel Goldberg Produttore esecutivoChris Bender, J.C. Spink, Thomas Tull, William Fay, Jon Jashni, Scott Budnick Casa di produzioneWarner Bros. Pictures, Legendary Pictures, Bende...

 

 

Le informazioni riportate non sono consigli medici e potrebbero non essere accurate. I contenuti hanno solo fine illustrativo e non sostituiscono il parere medico: leggi le avvertenze. Trombocitopenia indotta da eparinaSpecialitàematologia Classificazione e risorse esterne (EN)ICD-9-CM289.84 ICD-10D69.5 MedlinePlus000556 eMedicine1357846 Modifica dati su Wikidata · Manuale Patogenesi della trombocitopenia indotta da eparina La trombocitopenia indotta da eparina o (piastrinopenia indot...

 

 

This article needs additional citations for verification. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed.Find sources: MTV Desi – news · newspapers · books · scholar · JSTOR (November 2017) (Learn how and when to remove this message) Logo of broadcast channelMTV Desi is a digital platform from MTV that targeted Desis (people of South Asian origin) in the United States, as the n...

Sir Steve RedgraveCBE DLRedgrave pada tahun 2011Informasi pribadiNama lengkapSteven Geoffrey RedgraveKewarganegaraanInggrisLahir23 Maret 1962 (umur 62)Marlow, Buckinghamshire, InggrisPendidikanGreat Marlow SchoolPekerjaanPengayuhTinggi6 kaki 475 inci (13,89 m)Berat16 st 2 pon (103 kg) (2000)PasanganAnn RedgraveSitus webwww.steveredgrave.com OlahragaNegaraBritania RayaOlahragaKayuh putraKlubMarlow Rowing Club Leander ClubTimGB Rowing TeamDilatih oleh...

 

 

Lunar impact craterFeature on the moonDunthorneLunar Orbiter 4 imageCoordinates30°06′S 31°36′W / 30.1°S 31.6°W / -30.1; -31.6Diameter16 kmDepth2.8 kmColongitude32° at sunriseEponymRichard Dunthorne Dunthorne is a small lunar impact crater that is located to the northwest of the small lunar mare called Palus Epidemiarum, in the southwest part of the Moon's near side. It was named after British astronomer Richard Dunthorne.[1] It lies to the southwest of...

 

 

 烏克蘭總理Прем'єр-міністр України烏克蘭國徽現任杰尼斯·什米加尔自2020年3月4日任命者烏克蘭總統任期總統任命首任維托爾德·福金设立1991年11月后继职位無网站www.kmu.gov.ua/control/en/(英文) 乌克兰 乌克兰政府与政治系列条目 宪法 政府 总统 弗拉基米尔·泽连斯基 總統辦公室 国家安全与国防事务委员会 总统代表(英语:Representatives of the President of Ukraine) 总...

Частина серії проФілософіяLeft to right: Plato, Kant, Nietzsche, Buddha, Confucius, AverroesПлатонКантНіцшеБуддаКонфуційАверроес Філософи Епістемологи Естетики Етики Логіки Метафізики Соціально-політичні філософи Традиції Аналітична Арістотелівська Африканська Близькосхідна іранська Буддій�...

 

 

Overview of Barack Obama's career in the Illinois Senate Not to be confused with U.S. Senate career of Barack Obama. Barack ObamaMember of the Illinois Senatefrom the 13th districtIn officeJanuary 10, 1997 – November 4, 2004Preceded byAlice PalmerSucceeded byKwame Raoul This article is part of a series aboutBarack Obama Pre-presidency Early life and career Illinois State Senator 2004 DNC keynote address U.S. Senator from Illinois 2004 election sponsored bills 44th President of the ...

 

 

La actuación trabaja con la imaginación. La actuación es el trabajo realizado por un actor o una actriz mediante sus movimientos, gestos, dichos y entonación al representar a un personaje en una obra teatral, cinematográfica o de otro tipo.[1]​ El trabajo comienza desde una interiorización para conocer el principio del personaje y traerlo desde lo más profundo y transformarlo en un personaje integrado. La actuación se describe como el conjunto de acciones de un personaje dentro ...

Halaman ini berisi artikel tentang Kaisar Romawi abad ke-4. Untuk Kaisar Romawi abad ke-3, lihat Maximinus Thrax. Untuk penggunaan lainnya, lihat Maximin (disambiguasi). Maximinus DaiaKaisar ke-59 Kekaisaran RomawiBerkuasa305–308 (sebagai Caesar di bagian timur, yang berada di bawah naungan Galerius); 310 – Mei 312 (sebagai Augustus di bagian timur, dalam persaingan dengan Licinius)PendahuluGaleriusPenerusLiciniusKelahiran20 November c. 270dekat Felix Romuliana (Gamzigrad, Serbia)Kematian...

 

 

Cave and archaeological site in Spain La Roca dels morosUNESCO World Heritage SiteThe Dance of Cogul. Tracing by Henri Breuil.LocationEl Cogul, Garrigues, Province of Lleida, Catalonia, SpainPart ofRock Art of the Mediterranean Basin on the Iberian PeninsulaCriteriaCultural: (iii)Reference874-021Inscription1998 (22nd Session)Coordinates41°28′0.6″N 0°41′51.5″E / 41.466833°N 0.697639°E / 41.466833; 0.697639Location of Roca dels Moros in CataloniaShow map...

 

 

Firearm cartridge classification 5 mm caliberExamples of 5 mm cartridges, .22 Short (left) and .22 Long Rifle (5.6×10mmR and 5.6×15mmR)«4 mmFirearm cartridges6 mm» This is a list of firearm cartridges which have bullets in the 5.00 to 5.99 mm (0.197 to 0.236 in) caliber range. Length refers to the cartridge case length. OAL refers to the overall length of the cartridge. All measurements are in mm (in). Rimfire cartridges See also: List of rimfire cartridges Name Case type Bullet...

1825 – MDCCCXXV199 år sedan År1822 | 1823 | 182418251826 | 1827 | 1828 Årtionde1800-talet  | 1810-talet 1820-talet1830-talet | 1840-talet Århundrade1700-talet 1800-talet1900-talet Årtusende1000-talet Året Födda | AvlidnaBildanden | Upplösningar Humaniora och kulturKonst, litteratur, musik och teater Samhällsvetenskapoch samhälleKrig | Sport Teknik och vetenskap Vetenskap Andra tideräkningar Grego...

 

 

For another place, see Cooper, Houston County, Texas. City in Texas, United StatesCooper, TexasCityThe gazebo on the square in downtown CooperLocation of Cooper, TexasCoordinates: 33°22′27″N 95°41′24″W / 33.37417°N 95.69000°W / 33.37417; -95.69000CountryUnited StatesStateTexasCountyDeltaFounded1870Named forLeroy CooperArea[1] • Total1.47 sq mi (3.80 km2) • Land1.46 sq mi (3.79 km2) • ...