18 August 1964; 60 years ago (1964-08-18) (2 lanes) 23 December 1964; 60 years ago (1964-12-23) (4 lanes) 18 March 1965; 59 years ago (1965-03-18) (official) 8 October 1977; 47 years ago (1977-10-08) (reopened)
The Tasman Bridge is a prestressed concretegirder bridge connecting the Tasman Highway over the River Derwent in Hobart, Tasmania, Australia. When it opened on 29 March 1965, the Tasman was the longest prestressed concrete bridge in Australia,[2] with a total length measuring 1,396 metres (4,580 ft), including approaches.[3] The bridge provides a vital link between Hobart's city centre on the western shore and the City of Clarence on the eastern shore. Averaging 73,029 vehicle crossings per day, the bridge is the highest volume road section in Tasmania.[1] It features five lanes of traffic including a central lane equipped for tidal flow operations and separatedshared-use walkways on both sides, with ramp upgrades for improved access and cyclists completed in 2010.[4]
The Tasman Bridge gained national attention following the Tasman Bridge disaster. On 5 January 1975, the bridge was struck by the bulk ore carrierSS Lake Illawarra, bound for EZ Industries' Risdon Zinc Works with a cargo of 10,000 tonnes (9,800 long tons; 11,000 short tons) of zinc concentrate.[5] It caused two piers and three sections of concrete decking totalling 127 metres (417 ft), to collapse and sink the vessel, resulting in the loss of twelve lives. The disaster split the city in half, forcing commuters living on the eastern shore to make a 50-kilometre (31 mi) round trip to the CBD via the next bridge to the north. The crisis is unique in that no similar analysis of a city divided into two parts could be referenced.[6] After two-and-a-half years, the Tasman Bridge reopened on 8 October 1977.[7][8]
The Bowen Bridge was subsequently constructed to mitigate any future failure of the Tasman Bridge.
In June 2022, the Tasmanian transport ministry revealed a $130 million investment in the Tasman Bridge, the largest since its 1977 reconstruction. Designed by GHD Group with a target completion date set for 2025, the upgrades encompass wider dedicated paths for cyclists and pedestrians, increased barriers between vehicles and pedestrians, improved lighting and digital signage.[9][10]
History
During the 1950s, Hobart's eastern shore underwent substantial expansion due to the opening of the Hobart International Airport at Cambridge in 1956.[2] By 1957, the airport was the country's fifth busiest,[11][12] and the surge in air travel, associated automobile usage and surrounding developments led to a notable rise in traffic, overwhelming the capacity of the existing Hobart Bridge. With its single carriageway struggling to manage escalating traffic volumes and frequent disruptions due to the lifting of the bridge's lift span for passing ships, a necessity emerged for a novel bridge solution. These challenges highlighted the pressing need for a new, more accommodating bridge designed specifically for the increased traffic flow without constant interruptions for maritime navigation.
Design
In 1956, Tasmania's Department of Public Works commissioned Maunsell & Partners Pty Ltd to design the new River Derwent crossing. The stable foundation for the bridge was ensured by the favorable conditions of the riverbed between Queens Domain and Montagu Bay on the eastern shore, which includes bedrock, dolerite, and basalt beneath the silt. The engineers recommended a bridge supported by multiple piers due to the width of the water expanse, similar to that of the Sydney Harbour Bridge but requiring a comparable height to accommodate medium-sized cargo vessels. Consequently, a decision was made to construct a girder bridge featuring twenty-two spans, including a navigation span at its apex, with thirteen spans to the west and six spans to the east, each measuring 42.7 meters (140 ft) wide. To achieve the height of the 60.5-metre (198 ft) apex, a large sequence of interval spans was critical in the design to accommodate the weight of concrete required for each heightened pier, with its deepest pile measuring 81 metres (265 ft) below mean sea level.[13]
Criticism of then-Premier Eric Reece arose in 1958 when concerns were raised by engineers about the susceptibility of the concrete design to potential ship collisions. Investigative reports revealed Reece's dismissal of objections during parliamentary proceedings in favor of the $14 million project over a slightly more expensive suspension bridge option.[14][15]
Construction
Tenders were issued in April 1959, and contracts were subsequently awarded to Reed, Braithwaite, Stuart, and Lipscombe in November of the same year.[16]
Construction on the eastern shore viaduct commenced in May 1960. A labour force of over 400 workers were employed during peak construction.[17]
Several prerequisites were crucial during construction. The old Hobart Bridge had to remain operational until the Tasman Bridge's completion, and shipping lanes along the River Derwent needed to stay open. The construction posed significant challenges for Hobart as it marked the city's largest and most expensive undertaking to date. Procuring construction equipment, such as jacks and wires, required sourcing from the UK, while reinforced steel had to be imported from the Australian mainland, contributing to the bridge's elevated cost, totaling £7 million, equivalent to $14 million in 2015.
The first two lanes bridge opened on 18 August 1964.[18][19] The other two lanes opened on 23 December 1964. It was officially opened on 18 March 1965 by Prince Henry, Duke of Gloucester. Upon completion, the Tasman Bridge was the longest prestressed concrete bridge in Australia, utilising 46,000 tonnes (45,000 LT) of concrete and 5,300 tonnes (5,200 LT) of reinforcement steel.[3]
On 5 January 1975, the SS Lake Illawarra, a 140-metre (460 ft) bulk ore carrier, collided bow first with the pile capping of Pier 19 and then amidships with Pier 18[20] while en route to EZ Industries' Risdon Zinc Works with a cargo of 10,000 tonnes (9,800 long tons; 11,000 short tons) of zinc concentrate.[5] These successive impacts led to the collapse of both piers, their supporting pylons, and three unsupported sections of the bridge deck spanning 127 metres (417 ft), causing the vessel to sink and resulting in the deaths of seven crew members. Five motorists lost their lives when four cars drove over the collapsed sections before traffic was halted. A major press shot showed a Holden Monaro HQ and Holden EK perched balancing on the ledge.[21]
The breakage of an important arterial link isolated the residents in Hobart's eastern suburbs – the relatively short drive across the Tasman Bridge to the city suddenly became a 50-kilometre (31 mi) journey via the estuary's next bridge at Bridgewater. The only other vehicular crossing within Hobart after the bridge collapsed was the Risdon Punt, a cable ferry which crossed the river from East Risdon and Risdon, some five kilometres (3.1 mi) upstream from the bridge. It was totally inadequate, carrying only eight cars on each crossing, and although ferries provided a service across the river; it was not until December 1975 that a two lane, 788-metre-long (2,585 ft) bailey bridge was opened to traffic, two kilometres (1.2 mi) to the north from Dowsing Point to Cleburne Point thereby restoring some connectivity.[22] The bailey bridge remained in use until replaced by the Bowen Bridge in 1984.[23]
Following the Tasman Bridge Disaster, former-Premier Eric Reece maintained his defence of the chosen bridge design. Reece argued that the selected design was the sole financially viable option for the state at that time, despite the construction costs doubling throughout the project's execution.[14]
Reconstruction
Reconstruction of the Tasman Bridge by John Holland commenced in October 1975. Due to the amount of debris at the foundations, engineers decided not to rebuild Pier 18. Pier 17 on the western side of the gap was reinforced, and the pile cap and shaft of the pier above water level were replaced. A new pier was built at the site of the decimated Pier 19, and the existing Pier 20, on the eastern side of the gap, was repaired and strengthened. A new span, about 85.5 metres (281 ft) long, was built in steelbox girder construction between piers 17 and 19, and another new, prestressed concrete span, about 42.5 metres (139 ft) meters long, was built from the new Pier 19 to Pier 20.[27]
The annual expenditures on the Tasman Bridge reconstruction were $1.7 m in 1974–75; $12.3 m in 1975–76; $13.2 m in 1976–77 and $6.1m in 1977–78.[28]
After two and half years and an approximate cost of $44 million, the Tasman Bridge reopened to the public on 8 October 1977.[5][29]
Following the reopening of the bridge, the Port of Hobart implemented additional maritime safety measures, including directing large vessels to navigate slightly west of the original main navigation span and providing specialised training to harbour pilots in the use of a laser lighthouse for navigation. Additionally, the City of Hobart configured traffic systems to temporarily halt all road traffic when large vessels approach and pass under the bridge.[5][29][30]
Wreck of SS Lake Illawarra
The average depth of the river between piers 17 and 19 is 35 metres (115 ft), with the wreck of the SS Lake Illawarra lying on the bottom covered by a scattering of concrete debris, presenting no navigational hazard to smaller watercraft. 10,000 tonnes (9,800 long tons; 11,000 short tons) of zinc concentrate remain in the vessel's cargo hold.
The wreck attracts regular visits from divers. In 2019, the Tasmanian University Dive Club shared underwater footage of the wreck on social media. This footage, championed as the clearest footage ever captured, was attributed by the Derwent Estuary Program to decreased sediment levels in the River Derwent, a result of improved stormwater management measures in the city.[31]
In 2022, the CSIRO and Jacobs Engineering Group collaborated to produce the first complete 3D model of the wreck, bridge, riverbed, and shoreline. The mapping unveiled the ship's placement adjacent to the bridge between piers 17 and 19 on the eastern shore, with its bow near Pier 19, angled at 45 degrees toward the centre of the river. The vessel's bow lies roughly 15 metres (49 ft) below the waterline, around 125 metres (410 ft) from the eastern shore.[32]
Upgrades
Addition of fifth lane
The bridge deck was widened to accommodate a fifth traffic lane during the bridge's 1975 reconstruction. Utilising a Japanese construction method dubbed the "Nippon clip-on,"[33] the central lane incorporates a reversible lane management system for tidal flow operations.[34]
Tidal flow operations
Designed to optimise vehicle flow throughout the day, the reversible lane operates with a traffic light system and a sign above each lane. These signs, working in tandem with the traffic lights, utilise a pulley system to periodically shift over their respective lanes. During morning peak hours, the middle lane directs traffic towards the city side (or western shore), while during evening peak hours, it points back towards the eastern shore. Outside of peak hours, the lane generally directs traffic towards the eastern shore. This adaptable lane configuration maximises the bridge's capacity and reduces congestion by efficiently utilising lanes according to current traffic demand.
LED lighting
In 2019 the Hobart City Council commissioned Decrolux to convert the Tasman bridge's fluorescent lighting with modern LED lighting. Spanning almost 3 kilometres (1.9 mi) and utilising 1,930 LEDs, the project was completed in 2021.[35]
These remotely programmable lights have been utilized for various purposes, including commemorating annual events such as Dark Mofo and the TasPride parade, supporting sports teams like the Hobart Hurricanes and Tasmania JackJumpers, marking special occasions like the inauguration of Queen Mary of Denmark, and raising awareness for causes such as Women's Health Week and Men's Health Week.
Sensors
In 1987, a renovation initiative implemented the use of sensors to measure the currents of the river and the strength of winds, assisting ships in determining the optimal route for safe passage beneath the bridge.
Gallery
Panorama of the Tasman Bridge at night.
View of the bridge from the eastern shore
Looking towards the Tasman Bridge from Montagu Bay
^ abStephens, Tom (1880), "Labor's Bridge of Sighs", The Bulletin, John Ryan Comic Collection (Specific issues)., Sydney, N.S.W: John Haynes and J.F. Archibald, p. 12, ISSN0007-4039, nla.obj-1440175956, retrieved 21 November 2023 – via Trove
^"New £4m. Bridge For Derwent". The Canberra Times. Vol. 34, no. 9, 459. Australian Capital Territory, Australia. 28 November 1959. p. 3. Retrieved 28 November 2023 – via National Library of Australia.
^"1977 date for bridge". The Canberra Times. Vol. 49, no. 14, 083. Australian Capital Territory, Australia. 4 June 1975. p. 8. Retrieved 12 February 2024 – via National Library of Australia.
Hensher, David A. (David Alan) (1977), Re-opening of the Tasman bridge: the effect on mode and route of travel for east-west travel, School of Economic and Financial Studies, Macquarie University, ISBN978-0-85837-257-3
Bill Hagerty Senatore degli Stati Uniti per il TennesseeIn caricaInizio mandato3 gennaio 2021 ContitolareMarsha Blackburn PredecessoreLamar Alexander 30º Ambasciatore degli Stati Uniti d'America in GiapponeDurata mandato31 agosto 2017 –22 luglio 2019 PredecessoreCaroline Kennedy SuccessoreJoseph M. Young Dati generaliPartito politicoRepubblicano William Francis Hagerty, detto Bill (Gallatin, 14 agosto 1959), è un politico e diplomatico statunitense, membro del Part...
Katedral San JoséGereja Katedral Metropolitan Santo Yosef di San JoséInggris: Catedral Metropolitanacode: en is deprecated Katedral San JoséLokasiCalle Central dan Avenues 2-4, San JoséNegaraKosta RikaDenominasiGereja Katolik RomaSejarahDedikasiSanto YosefArsitekturStatusKatedralStatus fungsionalAktifAdministrasiKeuskupan AgungKeuskupan Agung San José Katedral San José atau yang secara resmi bernama Katedral Metropolitan Santo Yosef di San José (Inggris: Catedral Metropolitanacode: en ...
Japanese video game designer Yoshio Sakamoto坂本 賀勇Sakamoto at the 2010 Game Developers ConferenceBorn (1959-07-23) July 23, 1959 (age 64)Nara Prefecture, JapanAlma materOsaka University of ArtsOccupation(s)Video game designer, director, producerYears active1982–presentEmployerNintendoNotable workMetroidFamicom Detective ClubWarioWareRhythm TengokuTitleManager at Nintendo SPD Production Group No. 1 (2004-2012)Deputy Manager at Nintendo SPD (2012-2015)Senior Officer at N...
Individual who portrays a disaster victim Crisis Actors redirects here. For the Lemon Demon song, see Spirit Phone. Emergency medical technicians from the 96th Medical Group move an airman pretending to be wounded toward safety during an active shooter exercise at Eglin Air Force Base in Florida in 2014. A crisis actor (aka actor-patient or actor victim) is a trained actor, role player, volunteer, or other person engaged to portray a disaster victim during emergency drills to train first resp...
Untuk other uses of Jolo, lihat Jolo (disambiguation). JoloNama lokal: SūgJolo seperti terlihat dari Space Shuttle pada tahun 1992JoloLokasi dari negara FilipinaGeografiKoordinat5°58′23″N 121°9′0″E / 5.97306°N 121.15000°E / 5.97306; 121.15000KepulauanKepulauan SuluDibatasi olehCelebes SeaSulu SeaPulau besarBasilanJoloTawitawiLuas869 km2Titik tertinggi811 mPemerintahanNegaraPhilippinesRegionAutonomous Region in Muslim MindanaoProvinsiSuluMuni...
ilustrasi Tsurubebi (sesuatu seperti bola api yang jatuh dari pohon) yang ditemukan di dalam Gazu Hyakki Yakō bertahun 1781 Tsurubebi (Jepang: 釣瓶火code: ja is deprecated ) adalah yokai dalam cerita rakyat Jepang yang sering dijumpai di pepohonan jenis konifera di pedalaman hutan Pulau Shikoku dan Kyushu. Menurut legenda tsurubebi adalah roh pohon yang muncul di pelosok-pelosok hutan pada malam hari. Mereka diilustrasikan berbentuk bola api berwarna putih kebiruan yang bergelantungan nai...
Ballet choreographed by Marius Petipa and with music by Alexander Glazunov This article is about the Petipa-Glazunov ballet. For Jerome Robbins' ballet, see The Four Seasons (ballet). For the Cunningham-Cage ballet, see The Seasons (Cage). For other uses, see The Seasons (disambiguation). Anna Pavlova in the Bacchante, St. Petersburg, 1907. The Seasons (Russian: Времена года, Vremena goda; also French: Les Saisons) is an allegorical ballet in one act, four scenes, by the choreograp...
Dalam artikel ini, nama keluarganya adalah Du. Du ChunDu Chun pada saat konferensi persi Down the South We Go tanggal 26 Januari 2010 di BeijingLahir22 Mei 1983 (umur 40)Hebei, TiongkokAlmamaterAkademi Film BeijingPekerjaanPemeranTahun aktif2003–sekarangAgenHuayi BrothersOrang tuaDu Zhiguo (ayah)Yang Li (ibu) Du Chun Hanzi: 杜淳 Alih aksara Mandarin - Hanyu Pinyin: Dù Chún Du Chun (Hanzi: 杜淳; Pinyin: Dù Chún, lahir 22 Mei 1983) adalah pemeran asal Tiongkok. F...
У этого термина существуют и другие значения, см. Горностай (значения). Горностай Научная классификация Домен:ЭукариотыЦарство:ЖивотныеПодцарство:ЭуметазоиБез ранга:Двусторонне-симметричныеБез ранга:ВторичноротыеТип:ХордовыеПодтип:ПозвоночныеИнфратип:Челюстнороты...
Disambiguazione – Se stai cercando altri significati, vedi Cagliari (disambigua). Cagliaricomune(IT) Cagliari(SC) Casteddu (dettagli) (dettagli) Cagliari – VedutaDall'alto in basso, da sinistra a destra: il bastione di Saint Remy, la Sella del Diavolo, il quartiere Castello, la basilica di San Saturnino, il Palazzo Civico, il santuario di Nostra Signora di Bonaria, il Poetto, il parco di Monte Claro e il parco naturale regionale Molentargius-Saline LocalizzazioneStato Italia Regione...
الشركة الوطنية للإذاعة والتلفزةSociété nationale de radiodiffusion et de télévisionJenisPerusahaan milik pemerintahIndustriMedia massaGenreLayanan penyiaran masyarakatPendiriPemerintah MarokoKantorpusatRabat, MarokoWilayah operasiMaroko, Eropa, Timur TengahTokohkunciFayçal Laâraïchi, Presiden (PDG)JasaTelevisi, radio, daringPemilikPemerintahan MarokoKaryawan2,300Situs webwww.snrt.ma Société nationale de radiodiffusion et de télévision (SNRT) adalah penyi...
Emissions, impacts and responses of Jordan related to climate change Jordan is mostly desert. Climate change has serious impacts on the water resources in Jordan. The country needs to prepare for the impacts of climate change. Water resources in Jordan are scarce. Besides the rapid population growth, the impacts of climate change are likely to further exacerbate the problem. Temperatures will increase and the total annual precipitation is likely to decrease, however with a fair share of uncer...
Estadio Tres de MarzoGénéralitésNom complet Estadio Tres de MarzoAdresse Zapopan, Jalisco, MexiqueConstruction et ouvertureOuverture 1971Rénovation 1973, 1975, 1999UtilisationClubs résidents UAG TecosPropriétaire Universidad de GuadalajaraAdministration Tecos Fútbol ClubÉquipementSurface Pelouse naturelleCapacité 30 015LocalisationCoordonnées 20° 41′ 38″ N, 103° 24′ 58″ O Géolocalisation sur la carte : Mexique Géolocalisation sur la car...
في القانون سبب الدعوى هو عبارة عن مجموعة من الحقائق كافية لتبرير حق المدعي في رفع دعوى للحصول على المال والممتلكات، أو إنفاذ الحق ضد طرف آخر (المتهم).[1] يشير هذا المصطلح أيضا إلى النظرية القانونية التي من خلالها يجلب المدعي دعوى قضائية (مثل الاخلال بعقد، أوالضرب، أو الح...
Self-starting process that is supposed to proceed without external input For other uses, see Bootstrapping (disambiguation). This article's lead section may be too short to adequately summarize the key points. Please consider expanding the lead to provide an accessible overview of all important aspects of the article. (September 2024) In general, bootstrapping usually refers to a self-starting process that is supposed to continue or grow without external input. Etymology A pair of boots with ...
شمال الصين منطقة شمالي جمهورية الصين الشعبية الإحداثيات 41°24′N 105°06′E / 41.4°N 105.1°E / 41.4; 105.1 تقسيم إداري البلد الصين خصائص جغرافية المساحة 2,185,105 كم2 (843٬674 ميل2) عدد السكان المجموع 164,823,136 الكثافة السكانية 75/كم2 (200/ميل2) تعديل مصدري - تعديل �...
Keuskupan Aire dan DaxDioecesis Aturensis et Aquae AugustaeDiocèse d'Aire et DaxKatolik Katedral St-Jean-Baptiste, AireLokasiNegaraPrancisProvinsi gerejawiBordeauxStatistikLuas9.364 km2 (3.615 sq mi)Populasi- Total- Katolik(per 2012)377.381264,000 (70%)InformasiDenominasiKatolik RomaGereja sui iurisGereja LatinRitusRitus RomaPendirianPerubahan Nama: 3 Juni 1857KatedralKatedral St-Jean-Baptiste, AireKonkatedralKatedral Nôtre Dame, DaxPelindungNotre-Dame de ...
كادوقلي أسماء أخرى Kaduqli الاسم الرسمي كادقلي الإحداثيات 11°1′0″N 29°43′0″E / 11.01667°N 29.71667°E / 11.01667; 29.71667 تقسيم إداري جمهورية السودان ولاية جنوب كردفان عاصمة لـ ولاية جنوب كردفان ارتفاع 499 م (1٬637 قدم) عدد السكان (2005) المجموع 92,674 نسمة (تقديرا) رمز جيوني�...