Stadthaus

Stadthaus
Stadthaus, Murray Grove in 2014
Map
General information
StatusCompleted
LocationLondon
Address24 Murray Grove
Construction started2007
Completed2009
Height
Architectural29 m (95 ft)
Tip30.3 m (99 ft)
Top floor26 m (85 ft)
Technical details
MaterialTimber
Floor count9
Floor area2,890 m2 (31,100 sq ft)
Lifts/elevators2
Design and construction
Architect(s)Waugh Thistleton Architects
DeveloperTelford Homes
Structural engineerTechniker Ltd
Main contractorTelford Homes
Other information
Parking5
References
[1]

Stadthaus is a nine-storey residential building in Hackney, London, completed in 2009. With nine stories (30 meters/98 feet),[2] it was considered the second tallest timber residential building made of wood in the world at the time of its construction, after the Forte apartment complex in Melbourne, Australia.[3][4][5] It was designed in collaboration between architects Waugh Thistleton,[6] structural engineers Techniker,[7] and timber panel manufacturer KLH.[8]

Stadthaus is the first high-density housing building to be built from pre-fabricated cross-laminated timber panels.[6] It is the first building in the world of this height to construct not only load-bearing walls and floor slabs but also stair and lift cores entirely from timber.[6]

The record was later broken by Mjøstårnet in 2019 and the Ascent MKE high-rise apartment-building in 2022.

Ecological aspects

Timber stores 0.8t of carbon dioxide within 1 cubic metre and is a replenishable material. In comparison, the production of both concrete and steel are one-way energy intensive processes that release large amounts of carbon dioxide into the atmosphere. The panels can also be easily demounted and used as an energy source at the end of the building’s life. So the case for timber was made to the client and London Borough of Hackney's planning department both in terms of the environmental consideration and potential economies to cost and programme.[citation needed]

Design approach

The form of the design was predetermined by a number of factors. Previous architects had received two planning refusals on the site and as a result the acceptable parameters for the building’s approval were clearly defined. The site area is 17m x 17m and bound on all sides by other residential buildings. An extrusion of the site area set the building’s plan form and the height at nine stories was set as a maximum, before overshadowing would become an issue.[9]

The Metropolitan Housing Trust required that a separate ground floor entrance be provided for the affordable units. This resulted in a mirrored floor plan from east to west, with an identical entrance to each aspect. Both tenures are served by an individual staircase and lift. The five upper stories are designated for private sale and the three lower stories for social housing. The majority of social housing is made up of family apartments which overlook the play area to the rear of the building.

Telford Homes specifically required that the interiors were consistent with a standard developer specification, which means that inside the apartments feel completely conventional, belying the revolutionary nature of their structure.

According to the architects,[6] the colour scheme of the exterior façade was inspired by Gerhard Richter’s painting Les gris entre ciel et mer du nord.

Construction method

Cross-Section of Stadthaus

The building was assembled using a structural cross-laminated timber panel system. The timber panels are produced in Austria by KLH using Spruce planks glued together with a non-toxic adhesive. The waste timber is converted to fuel powering both the factory and local village. Each panel is prefabricated including cut-outs for windows and doors and routed service channels. As the panels arrived on site they were immediately craned into position and fixed in place. Four carpenters assembled the eight-story structure in twenty-seven days. The speed of the construction in such a densely populated environment is especially relevant, as was the lack of noise and waste, creating far less intrusion on the local community than a traditional concrete frame construction.[8]

A ‘platform construction’ configuration is used throughout this structure. Each floor is set on the walls below, and then another story of walls is raised and so on up the building. Joints are secured with screws and angle plates. Stresses are generally very low throughout the structure and at points where cross-grain pressures are high, screws have been added to reinforce the timber locally. Progressive collapse is avoided by providing sufficient redundancy so that any single elements can be removed.[citation needed] Designing a building constructed from load bearing panels creates a number of opportunities. Any internal wall can become a party wall and have a significant portion removed from the surface area as openings. This simple flexibility allowed for different plan types up and down the building and an animated façade where windows were placed according to the best advantage.[citation needed]

Typically a new technology in construction provides a reduced volume of building material; lighter weights produce cheaper faster buildings. The impression of solidity once inside this building is evident, the interior spaces and the acoustic they give off affirm a sense of place and home.[citation needed]

Traditional trades and methods followed on once the structure of each floor was complete. The enthusiasm of the work force for the construction and the ease of the build was a benefit beyond anticipation. The building was completed in 49 weeks, estimated to be a saving of five months over a notional concrete frame construction and occupied ahead of programme in January 2009.[citation needed]

Sustainability

Internal Structure

Using a bulk timber panel system affects the carbon footprint of the building in three ways. Firstly, the production of cement produces 237 kg of carbon per tonne.[citation needed] The project's sustainability expert estimates that if this building were to be a concrete structure, it would contain approximately 950 cubic metres of concrete. This would require 285 tonnes of cement and would, therefore, produce approximately 67,500 kg of carbon.[citation needed]

Additionally, the production of steel produces 477 kg of carbon per tonne.[citation needed] It is estimated that the building would, if built in reinforced concrete, require about 120 tonnes of steel, the production of which would have generated 57,250 kg of carbon.

901 cubic metres of timber have been used within the building. Timber absorbs carbon throughout its natural life and continues to store that carbon when cut. The fabric of Stadthaus stores over 186,000 kg of carbon. Thus, the chosen construction method has resulted in a reduction in the carbon load of the building of 67,500 + 57,250 + 186,000 = 310,750 kg of carbon. This is equivalent to over 310 tonnes of carbon. The estimated carbon dioxide produced in the generation of the energy for the building, including the transportation of the timber panels from Austria, is 10,000 kg/c/yr. This has been entirely offset by the building’s carbon saving for some 21 years.[citation needed]

Building high in timber

Concerns associated with timber buildings are predominantly related to acoustics and fire protection. Timber buildings are classified as poor in terms of their acoustic performance due to the light structure as compared to reinforced concrete and masonry. However, cross-laminated solid timber panels have a significantly higher density than timber frame buildings. They provide a solid structural core on which different, independent and separating layers can be added. The layer principal overcomes any acoustic or sound transfer issues. In Stadthaus an economic layering strategy of stud walls, floating floor build-ups and suspended ceilings, gave sound attenuation far in excess of building regulations (58 - 60db).[citation needed]

In a fire, a solid wall of timber benefits from the protection of a charred layer and therefore does not combust in the same way as a single stud. In Stadthaus, five-layer cross-laminated timber panels are used to obtain a fire protection that allows the structure to retain its integrity for at least 90 minutes. This is significantly longer than steel, which fails and buckles at high temperatures. The 90 minutes at Stadthaus have been achieved with the plasterboard finish – two layers of plasterboard provide 60 minutes with the final 30 minutes achieved by the calculation of charring rate of the KLH solid timber panels. Calculations by the project engineers however show that in fact the KLH panels comfortably achieve a 60-minute fire resistance period with the panel thicknesses used for this project so the design team has been slightly modest.[citation needed]

Regulations in Europe have meant there are no precedents for Stadthaus.[10] However, architectural and engineering methods in timber construction pioneered by Waugh Thistleton and Techniker are now accepted internationally.[citation needed] By gaining the necessary certificates from both NHBC and Building Research Establishment, both of which treated Stadthaus as a pilot scheme, the design team considers that timber panels are the building material of an environmentally conscious future.[citation needed]

Awards

The Stadthaus was awarded the Wood Award 2008, Structural category / Judges Special Award[11] and the RIBA President's Award for Research 2009.

Sample buildings

See also

  • Sutyagin House - 44m private residence in northern Russia demolished in 2009

References

  1. ^ "Stadhaus". Skyscraper Center. CTBUH. Retrieved 1 June 2017.
  2. ^ "Can wooden skyscrapers transform concrete jungles?". CNN. 15 March 2012. Retrieved 12 May 2021.
  3. ^ Daclin, Dennis. "6 Building Construction Types | Forte Living". Retrieved 12 May 2021.
  4. ^ "Der erste Siebengeschosser aus Holz". e3berlin.de. Archived from the original on 10 March 2012. Retrieved 12 May 2021.
  5. ^ "The world's tallest wooden buildings". www.designbuild-network.com. Retrieved 12 May 2021.
  6. ^ a b c d "Murray Grove, The original timber tower". waughthistleton.com. Retrieved 11 May 2021.
  7. ^ "Timber tower by Waugh Thistleton". Dezeen. 17 June 2007. Retrieved 12 May 2021.
  8. ^ a b "Nine Storey Apartment Built of Wood in Nine Weeks by Four Workers". Treehugger. Retrieved 12 May 2021.
  9. ^ Planning, building and the environment: Building Regulations
  10. ^ ? questionable, see above link to the Berlin building
  11. ^ "Winner: The Stadthaus". woodawards.com.

Additional References

  • .Yates, Megan et al., "Design of an 8 storey Residential Tower from KLH Cross Laminated Solid Timber Panels", written for World Conference for Timber Engineering, Japan 2008
  • European technical approval, “KLH solid wood slabs”, ETA-06/0138, issued by OIB – Österreichisches Institut für Bautechnik, Wien.
  • Office of the Deputy Prime Minister, “A-3 Disproportionate Collapse”, The Building Regulations 2000, Approved Document A, pp. 39–43.
  • Milner M., Chiltern Clarke Bond, “Design Guidance for Disproportionate Collapse”, UK Timber Frame Association, Number 3, March 2005.
  • Krapfenbauer T. J., “Bautabellen”, Verlag Jugend & Volk GmbH, Wien, edition 2006/07.

Further reading

51°31′51″N 0°05′22″W / 51.5308°N 0.0894°W / 51.5308; -0.0894

Read other articles:

GăeştiKotaNegara RumaniaProvinsiDâmboviţaStatusKotaPemerintahan • Wali kotaAlexandru Toader (Partidul Social Democrat)Luas • Total22,8 km2 (88 sq mi)Populasi (2002) • Total16.598Zona waktuUTC+2 (EET) • Musim panas (DST)UTC+3 (EEST)Situs webhttp://www.primaria-gaesti.ro/ Găeşti adalah kota yang terletak di provinsi Dâmboviţa, Rumania. Kota ini memiliki jumlah penduduk sebesar 16.598 jiwa. Kota ini pertama kali dis...

 

 

Peta menunjukan lokasi Balaoan Data sensus penduduk di Balaoan Tahun Populasi Persentase 199531.420—200033.7861.57%200736.8291.20% Balaoan adalah munisipalitas yang terletak di provinsi La Union, Filipina. Pada tahun 2010, munisipalitas ini memiliki populasi sebesar 40.256 jiwa atau 6.581 rumah tangga. Pembagian wilayah Secara administratif Balaoan terbagi menjadi 36 barangay, yaitu: Almeida Antonino Apatut Ar-arampang Baracbac Este Baracbac Oeste Bet-ang Bulbulala Bungol Butubut Este Butub...

 

 

United States historic placeDe Anza HotelU.S. National Register of Historic Places Location233 West Santa Clara Street,San Jose, CaliforniaCoordinates37°20′3.55″N 121°53′42.06″W / 37.3343194°N 121.8950167°W / 37.3343194; -121.8950167Built1931ArchitectWilliam H. WeeksArchitectural styleArt Deco, Mission/Spanish RevivalNRHP reference No.82002266 [1]Added to NRHPJanuary 21, 1982 The Hotel De Anza is a historic hotel in San Jose, Californ...

Features added to Windows Vista Part of a series of articles onWindows Vista New features Overview Technical and core system Security and safety Networking technologies I/O technologies Management and administration Removed features Vista vs. XP Other articles Editions Windows Server 2008 Windows Mobile 6.0 Windows Mobile 6.1 Windows Mobile 6.5 Development history Criticism Mojave Experiment vte Compared with previous versions of Microsoft Windows, features new to Windows Vista are very numer...

 

 

Geling YanBiographieNaissance 16 novembre 1958 (65 ans)ShanghaiNom dans la langue maternelle 严歌苓 (Yán Gēlíng) ou 嚴歌苓Nationalités chinoise (16 novembre 1958 - 2004)américaine (depuis 2004)Formation Université ColumbiaActivités Écrivaine, scénariste, journalistePère Ma Xiao (d)Autres informationsMembre de Association des écrivains chinois (en)modifier - modifier le code - modifier Wikidata Geling Yan , en chinois simplifié : 严歌苓 ; chinois traditi...

 

 

MuristanLingkunganNegara IsraelProvinsiYerusalemKotaYerusalemZona waktuUTC+3 (EAT) • Musim panas (DST)UTC+3 (EAT) Muristan adalah sebuah lingkungan di kota suci Yerusalem di Provinsi Yerusalem, tepatnya di sebelah timur Israel.[1] Referensi ^ National Geospatial-Intelligence Agency. GeoNames database entry. (search Diarsipkan 2017-03-18 di Wayback Machine.) Accessed 12 May 2011. lbsLingkungan di YerusalemLingkungan-lingkungan Yerusalem sebelah timur garis gencatan sen...

UNESCO World Heritage Site in Grand Est, France UNESCO World Heritage SiteLocationNancy, Lorraine, Grand Est, FrancePart ofPlace Stanislas, Place de la Carrière [fr] and Place d'Alliance [fr] in NancyReference229bisInscription1983 (7th Session)Extensions2016Area7 ha (17 acres)Buffer zone159 ha (390 acres)Coordinates48°41′37″N 6°10′59″E / 48.69361°N 6.18306°E / 48.69361; 6.18306Location of Place Stanislas in Grand Es...

 

 

Cet article est une ébauche concernant un homme politique américain. Vous pouvez partager vos connaissances en l’améliorant (comment ?) selon les recommandations des projets correspondants. Dale Bumpers Fonctions Sénateur des États-Unispour l'Arkansas 3 janvier 1975 – 3 janvier 1999(24 ans) Prédécesseur J. William Fulbright Successeur Blanche Lincoln 38e gouverneur de l'Arkansas 12 janvier 1971 – 3 janvier 1975(3 ans, 11 mois et 22 jours) Prédécesseur ...

 

 

Ираклеониты — ученики гностика Ираклеона (II век). Упоминаются как особая секта Епифанием и Августином; при крещении и миропомазании они соблюдали обряд помазания елеем и при этом произносили воззвания на арамейском языке, которые должны были освободить душу от власт�...

Forbes 30 Under 30PrésentationType Liste, distinctionFondation 2011Site web www.forbes.fr/under-30modifier - modifier le code - modifier Wikidata Forbes 30 Under 30 est un ensemble de listes de personnes de moins de 30 ans publiées chaque année par le magazine Forbes et certaines de ses éditions régionales. Les listes américaines reconnaissent 600 personnalités du monde des affaires et de l'industrie, dont 30 sélectionnées dans vingt industries chacune. L'Asie et l'Europe ont égalem...

 

 

普密蓬·阿杜德ภูมิพลอดุลยเดช泰国先王普密蓬·阿杜德(官方肖像) 泰國國王統治1946年6月9日-2016年10月13日(70年126天)加冕1950年5月5日前任阿南塔玛希敦繼任玛哈·哇集拉隆功总理见列表出生(1927-12-05)1927年12月5日 美國马萨诸塞州剑桥奥本山醫院(英语:Mount Auburn Hospital)逝世2016年10月13日(2016歲—10—13)(88歲) 泰國曼谷西里拉醫院安葬曼谷僧...

 

 

周處除三害The Pig, The Snake and The Pigeon正式版海報基本资料导演黃精甫监制李烈黃江豐動作指導洪昰顥编剧黃精甫主演阮經天袁富華陳以文王淨李李仁謝瓊煖配乐盧律銘林孝親林思妤保卜摄影王金城剪辑黃精甫林雍益制片商一種態度電影股份有限公司片长134分鐘产地 臺灣语言國語粵語台語上映及发行上映日期 2023年10月6日 (2023-10-06)(台灣) 2023年11月2日 (2023-11-02)(香�...

City in Ohio, United StatesMayfield Heights, OhioCityMayfield Heights City HallMotto: A Vibrant CommunityLocation in Cuyahoga County and the state of OhioCoordinates: 41°31′3″N 81°27′21″W / 41.51750°N 81.45583°W / 41.51750; -81.45583CountryUnited StatesStateOhioCountyCuyahogaFounded1920Incorporated1950Government • MayorAnthony DiCicco (R)[1][2]Area[3] • Total4.18 sq mi (10.82 km2) •...

 

 

Lịch sử Hoa Kỳ Tên gọi USS Shirk (DD-318)Đặt tên theo James W. ShirkXưởng đóng tàu Bethlehem Shipbuilding Corporation, Union Iron Works, San FranciscoĐặt lườn 13 tháng 2 năm 1919Hạ thủy 20 tháng 6 năm 1919Nhập biên chế 5 tháng 2 năm 1921Xuất biên chế 8 tháng 2 năm 1930Xóa đăng bạ 22 tháng 7 năm 1930Số phận Bán sau khi tháo dỡ một phần, 27 tháng 1 năm 1931 Đặc điểm khái quátLớp tàu Lớp tàu khu trục ClemsonTr�...

 

 

Michel RouxMichel Roux in 2008Lahir(1941-04-19)19 April 1941Charolles, FranceMeninggal11 Maret 2020(2020-03-11) (umur 78)Bray, Berkshire, EnglandKarier kuliner Rating Michelin stars (1974–2002) Restoran sebelumnya Le Gavroche The Waterside Inn Penghargaan yang dimenangkan Meilleur Ouvrier de France 2008 Lifetime Achievement award by Tatler 2011 Lifetime Achievement award by The Observer Food Monthly Michel Roux, OBE ([mi.ʃɛl u]; 19 April 1941 – 11 Maret 2020), juga dikenal seb...

Character created by Thomas Harris This article is about the character. For the franchise, see Hannibal Lecter (franchise). Hannibal the Cannibal redirects here. For the real-life serial killer given this nickname, see Robert Maudsley. Fictional character Hannibal LecterHannibal Lecter characterAnthony Hopkins as Lecter in 1991's The Silence of the LambsFirst appearanceRed Dragon (1981)Created byThomas HarrisPortrayed byBrian Cox (Manhunter)Anthony Hopkins (The Silence of the Lambs, Hannibal,...

 

 

Engineering college in Tamil Nadu, India This article needs additional citations for verification. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed.Find sources: CSI Institute of Technology – news · newspapers · books · scholar · JSTOR (July 2019) (Learn how and when to remove this message) C.S.I Institute of TechnologyEstablished1994FoundersChurch of South IndiaAcademic affiliat...

 

 

耶萊娜·揚科維奇Jelena Janković2007年的揚科維奇原文名稱Јелена Јанковић國家/地區 南斯拉夫(1985–2003) 塞爾維亞與蒙特內哥羅(2003–2006) 塞爾維亞 (2006–)居住地 阿联酋杜拜出生 (1985-02-28) 1985年2月28日(39歲) 南斯拉夫塞爾維亞貝爾格勒[1]身高1.77米(5英尺10英寸)[2]轉職業年2000退休年2022持拍右手持拍(雙手反拍)職業獎金$19,089,2...

Questa voce o sezione sull'argomento partiti politici nepalesi non cita le fonti necessarie o quelle presenti sono insufficienti. Puoi migliorare questa voce aggiungendo citazioni da fonti attendibili secondo le linee guida sull'uso delle fonti. Partito Comunista del Nepal (marxista unito) Stato Nepal Fondazione2005 Dissoluzione2013 Confluito inPartito Comunista del Nepal IdeologiaMarxismo, leninismo Modifica dati su Wikidata · Manuale Il Partito Comunista Nepalese (...

 

 

Bank of China BuildingChinese: 中國銀行大廈Portuguese: Edifício do Banco da ChinaLocation in MacauGeneral informationStatusCompletedTypeSkyscraperArchitectural styleModernismLocationSé, MacauCountryChinaCoordinates22°11′23″N 113°32′35″E / 22.189861°N 113.542974°E / 22.189861; 113.542974Construction started1989Completed1991Height163 mTechnical detailsFloor count38Floor area2,172 sq mDesign and constructionArchitect(s)P & T Architects & En...