The road starts at Soroti and continues north through Amuria and Abim, to end at Kotido, a distance of approximately 192 kilometres (119 mi).[2] The coordinates of the road near Abim are 2°43'38.0"N, 34°39'51.0"E (Latitude:2.727237; Longitude:33.664159).[3]
Overview
The road is gravel surface and in poor physical state. It is prone to flooding, and, when it does, it adversely disrupts travel between Soroti and Kotido.[4][5][6]
Upgrading to bitumen
During a campaign speech on 2 December 2015, President Yoweri Museveni stated that this road is among the next batch of roads to be considered for upgrading to grade II bitumen surface. No specific timetable has been set.[7]