The project has an installed capacity of 2980 MW consisting of two stages, stage one which got commissioned late was of 3 units of 660 MW each involving super-critical boilers technology and stage two consisted of 2 units of 500 MW each. PM Manmohan Singh inaugurated the Sipat Thermal Power Plant on September 20, 2013.