There are 7 exits, lettered A1, A2, B, C1, C2, D1 and D2. Exit A2 has an accessible elevator.
Exit A1
Exit A2
Exit A2 accessible exit
Exit B
Exit C1
Exit C2
Exit D1
Exit D2
References
^"地名公告" [Place name announcement] (in Simplified Chinese). Beijing Municipal Commission of Planning and Natural Resources. 2024-04-30. Archived from the original on 2023-10-26. Retrieved 2025-01-14. Shifoying Station Dongfeng Township, Chaoyang District, west of the intersection of Yaojiayuan Road and Shifoying Road
^"关于轨道交通3号线一期车站命名预案的公示" [Public announcement of the naming plan for the first phase of Metro Line 3 stations] (in Simplified Chinese). Beijing Municipal Commission of Planning and Natural Resources. 2024-01-18. Archived from the original on 2024-01-18. Retrieved 2025-01-14. Shifoying Station. This station is located in Dongfeng Township, Chaoyang District, west of the intersection of Yaojiayuan Road and Shifoying Road. It is named after Shifoying
^孙宏阳; 李博 (2024-12-12). "官宣!本周日北京新开3条(段)地铁线,朝阳站枢纽同步开通" [Official announcement! Three new subway lines will be opened in Beijing this Sunday, and Chaoyang Station Hub will be opened simultaneously] (in Simplified Chinese). Beijing Daily. Archived from the original on 2024-12-13. Retrieved 2025-01-14.{{cite news}}: CS1 maint: multiple names: authors list (link)
^"北京地铁3号线石佛营站2019年启动施工" [Beijing Metro Line 3 Shifoying Station to start construction in 2019] (in Simplified Chinese). Qianlong.com. 2018-12-20. Archived from the original on 2020-06-26. Retrieved 2025-01-14.
^"【大干快上 喜迎盛会】大家伙"滑"着过站" [[Work hard and fast to welcome the grand event] The big guys "slide" through the station] (in Simplified Chinese). Beijing Municipal Engineering Group Fourth Engineering Department. 2022-09-16. Retrieved 2025-01-14.
^"工程动态 | 集团四处安全生产正当时" [Engineering News | It’s time for the Group to focus on safety production] (in Simplified Chinese). Beijing Municipal Engineering Group Fourth Engineering Department. 2021-04-23. Retrieved 2025-01-14.