|
History |
United States |
Name | Purdue Victory |
Namesake | Purdue University |
Owner | War Shipping Administration (WSA) |
Operator | Waterman Steamship Corp. |
Ordered | as type (EC2-S-C1) hull, MCV hull 740 |
Awarded | 1 January 1942 |
Builder | Permanente Metals Corporation, Yard No. 2, Richmond, California |
Cost | $1,149,493 |
Yard number | 740 |
Way number | 5 |
Laid down | 11 February 1945 |
Launched | 24 March 1945 |
Sponsored by | Mrs. Paul N. Mulvany |
Completed | 18 April 1945 |
Identification | |
Fate | |
General characteristics |
Class and type | |
Tonnage | |
Displacement | 15,200 long tons (15,444 t) (standard) |
Length |
- 455 feet 3 inches (139 m) oa
- 436 feet 6 inches (133 m) pp
- 444 feet (135 m) lwl
|
Beam | 62 feet (19 m) |
Draft | 28 ft (8.5 m) |
Installed power |
- 2 × Oil fired boilers
- 6,000 hp (4,500 kW)
|
Propulsion | |
Speed | 15 knots (28 km/h; 17 mph) |
Capacity |
- 523,740 cubic feet (14,831 m3) (grain)
- 453,210 cubic feet (12,833 m3) (bale)
|
Complement | |
Armament | |