Rail Splitter II is a wind farm that will be located in Tazewell County, near the townships of Boynton, Hopedale, Hittle, and Little Mackinaw. The expansion will add capacity of 100 megawatts (MW) with 20-28 planned turbines. The model is expected to be determined in 2023.[5][6]
In June 2022, a group of Mackinaw farmers known as United Citizens of Tazewell County LLC presented a rewrite of the county ordinance for wind farms. If passed, this change would affect the turbines at Rail Splitter and the proposed Rail Splitter II.[7]