You can help expand this article with text translated from the corresponding article in German. (April 2024) Click [show] for important translation instructions.
Machine translation, like DeepL or Google Translate, is a useful starting point for translations, but translators must revise errors as necessary and confirm that the translation is accurate, rather than simply copy-pasting machine-translated text into the English Wikipedia.
Do not translate text that appears unreliable or low-quality. If possible, verify the text with references provided in the foreign-language article.
You must provide copyright attribution in the edit summary accompanying your translation by providing an interlanguage link to the source of your translation. A model attribution edit summary is Content in this edit is translated from the existing German Wikipedia article at [[:de:Olympia-Radstadion (München)]]; see its history for attribution.
You may also add the template {{Translated|de|Olympia-Radstadion (München)}} to the talk page.
The track was 285.714 metres (937 ft 5 in) long by 7 metres (23 ft) wide with banking that varied between 11.56 and 48.32 degrees.
Demolition and new arena
The Radstadion was demolished in 2015 to make way for a new multi-purpose arena. The SAP Garden will offer a maximum of 12,500 seats and should cost around 100 million euros. It will be the new home of the ice hockey club EHC Red Bull München and the basketball team of Bayern Munich. The construction of the new arena should begin in the winter of 2019 with the groundbreaking ceremony. In the late summer of 2021, the SAP Garden should be completed. The new building is designed by Danish architects 3XN. The costs are borne by the owner of the EHC Red Bull München, the Red Bull GmbH.[1]