Submarine of the Republic of Korea Navy
ROKS Yi Cheon at Guam on 19 March 1999.
|
History |
South Korea |
Name |
- Yi Cheon
- (이천)
- Lee Chun [1]
|
Namesake | Yi Cheon |
Ordered | 12 August 1976 |
Builder | DSME |
Launched | 12 September 1991 |
Acquired | 30 April 1994 |
Commissioned | 20 June 1994 |
Identification | SS-062 |
Status | Active |
General characteristics |
Class and type | Jang Bogo-class submarine |
Displacement |
- 1,180 t surfaced
- 1,285 t submerged
|
Length | 55.9 m (183 ft 5 in) |
Beam | 6.4 m (21 ft 0 in) |
Draft | 5.9 m (19 ft 4 in) |
Propulsion |
- 4 MTU Type 12V493 AZ80 GA31L diesel engines
- 1 Siemens electric motor
- 1 shaft
- 4,600 hp (3,400 kW)
|
Speed | |
Range | 11,300 nmi (20,900 km) surfaced at 4 knots (7.4 km/h) |
Endurance | 50 days |
Complement | 5 officers, 26 enlisted |
Armament | |
ROKS Yi Cheon (SS-062) is the second ship of the Jang Bogo-class submarine of the Republic of Korea Navy, and was the second submarine to serve with the navy. She is one of Jang Bogo-class submarines to be built in South Korea.
Development
At the end of the 1980s the South Korean navy started to improve its overall capability and began to operate more advanced vessels. South Korea purchased its first submarines, German U-209 class in its Type 1200 subvariant, ordered as the Jang Bogo class. These boats are generally similar to Turkey's six Atilay-class submarines, with German sensors and weapons.[2]
The first order placed late in 1987 covered three boats, one to be completed in Germany and the other two in South Korea from German-supplied kits. There followed by two additional three-boat orders placed in October 1989 and January 1994 for boats of South Korean construction. The boats were commissioned from 1993 to 2001.
The older boats were upgraded, it is believed that the modernization included a hull stretch to the Type 1400 length, provision for tube-launched Harpoon missiles and the addition of a towed-array sonar.[3]
Construction and career
ROKS Yi Cheon was built by Daewoo Shipbuilding and launched on 12 September 1991. She was acquired by the navy on 30 April 1994 and commissioned on 20 June 1994.
Exercise Tandem Thrust 1999
She participated in HARPOONEX, part of a live-fire, multinational naval exercise with the United States Navy during which a decommissioned cruiser, USS Oklahoma City (CG-5), was sunk by Yi Cheon.[1]
See also
References
External links