Ponte Morandi (English: Morandi Bridge), officially Viadotto Polcevera (English: Polcevera Viaduct),[1] was a road viaduct in Genoa, Liguria, Italy, constructed between 1963 and 1967 along the A10 motorway over the Polcevera River, from which it derived its official name. It connected Genoa's Sampierdarena and Cornigliano districts across the Polcevera Valley. The bridge was widely called "Ponte Morandi" after its structural designer, engineer Riccardo Morandi.[2]
On 14 August 2018, a 210-metre (690 ft) section of the viaduct collapsed during a rainstorm, killing forty-three people. The collapse led to a year-long state of emergency in the Liguria region, extensive analysis of the structural failure,[3] and widely varying assignment of responsibility.
The remains of the original bridge were demolished in June 2019. The replacement bridge, the Genoa-Saint George Bridge was inaugurated a year later.[4]
History
Design
Ponte Morandi was designed by civil engineer Riccardo Morandi, from whom its unofficial name was derived. It was a cable-stayed bridge characterised by a prestressed concrete structure for the piers, pylons and deck,[5] very few stays, as few as two per span, and a hybrid system for the stays constructed from steel cables with prestressed concrete shells poured on.[6][7] The concrete was prestressed only to 10 MPa (1,500 psi),[citation needed] making it susceptible to cracks, water intrusion, and corrosion of the internal steel.[8][9][10] The bridge was similar to Morandi's earlier 1957 design for the General Rafael Urdaneta Bridge in Venezuela[11] except for the stays, which on the Venezuelan bridge are not covered with prestressed concrete.
Construction
The viaduct was built between 1963 and 1967 by the Società Italiana per Condotte d'Acqua, costing 3.8 billion Italian lire and opened on 4 September 1967. It had a length of 1,182 metres (3,878 ft), a height above the valley of 45 metres (148 ft) at road level, and three reinforced concrete pylons reaching 90 metres (300 ft) in height; the maximum span was 210 metres (690 ft). It featured diagonal cable stays, with the vertical trestle-like supports made up of sets of Vs, one set carrying the roadway deck, while the other pair of inverted Vs supported the top ends of two pairs of diagonal stay cables.[citation needed]
The viaduct was officially opened on 4 September 1967 in the presence of Italian President Giuseppe Saragat.[12]
Maintenance and strengthening
The bridge had been subject to continual restoration work from the 1970s due to an incorrect initial assessment of the effects of creep of the concrete.[13] This resulted in excessive deferred displacement of the vehicle deck so that it was neither level nor flat; at the worst points, it undulated in all three dimensions. Only after continual measurement, redesign, and associated structural work was the vehicle deck considered acceptable, approaching horizontal by the mid-1980s.[14]
In a 1979 report, Morandi himself said "I think [sic] that sooner or later, maybe in a few years, it will be necessary to resort to a treatment consisting of the removal of all traces of rust on the exposure of the reinforcements, to fill the patches, with epoxidic style resins, and finally to cover everything up with elastomers of very high chemical resistance".[6]
In the 1990s, the tendons (the steel wires, cables, and threaded bars, designed to produce the bridge's prestressed concrete) on pillar 11 appeared to be most damaged.[9] About 30% of the tendons had corroded away. The load of the bridge was 7,000 kg (15,000 lb) per tendon, whereas the tendons were originally capable of carrying 15,000 kg (33,000 lb).[citation needed][15] A single truck can weigh as much as 44,000 kg (97,000 lb).[16] As of the collapse of the bridge, only pillar 11 had been internally inspected in the 1990s, showing severed and oxidized strands.[17] From 1990 onward, the easternmost pillar 11 had its stays strengthened by flanking them with external steel cables.[18][19] Pillar 10 had the stays at the top strengthened with steel sheathing in the 1990s.[20] Following the collapse, many questions have been raised about the stays.[21] Morandi's similar[22] bridge in Venezuela suffered one or more stay cable failures in 1979/1980, with collapse imminent.[23][24][25][26][27]
The minister of infrastructures and transport in charge until 1 June 2018, Graziano Delrio, was informed multiple times in the Italian parliament during 2016 that the Morandi bridge needed maintenance.[28][29]
In 2017, a confidential university report in Genoa noted severe disparities in the behaviour of the stays of the pillar 9, which would collapse.[17] The minutes of a February 2018 government meeting report that resistance and reflectometry measurements indicated an "average" reduction of the cross-section of the tendons of 10 to 20%.[30][31] A crack in the road had appeared at least 14 days before the collapse, near the southeastern stay of the subsequently collapsed pillar 9. The crack may have been an indication that the stay had stretched.[32][33] At no point was a suggestion made to reduce the load on the bridge.[30] Traditionally, bridges were designed for a 50-year lifespan;[23] the bridge failed just under 51 years after its opening.
On 3 May 2018, the Autostrade company had announced a call for tenders for a structural upgrade of the viaduct to the value of €20,159,000, with a deadline of 11 June 2018. The work on the reinforcement of the stays on pillars 9 and 10 would have needed to be finished within five years.[34][35]
Workers were installing new heavy concrete Jersey barriers on the Ponte Morandi before it collapsed, reducing the already low-compressive prestress on the concrete of the stays and increasing the loads.[10][21][36]
2017 modal analyses
In 2017, Carmelo Gentile and Antonello Ruccolo of the Polytechnic University of Milan studied the modal frequencies and deformations of the stays of the bridge.[17] On pillar 9, they could identify only four global modes, and the deformations of two of these identified modes were not fully compliant.[37] Modal frequencies were more than 10% different, specifically on the southern stays.[31][38] In pre-stressed concrete beams, such a difference could represent the entire effect of the non-linear pre-stresses. As little as a 2% shift could represent severe damage.[39][40] The prestress in the Ponte Morandi was characterised as relatively small from the start. In contrast, with bare tendons, which are relatively under-constrained like the strings in a piano, the effect of prestress is dominant in determining the resonant frequency. Other than prestress, changes in geometry, such as corrosion in the tendons, could impact the resonant frequency. The effects would be reduced by the composite nature of the stays when observing global modes.[41] Gentile had performed similar modal analyses on pillar 11 in the 1990s.[42] Other related methods were applied on the stays of Ponte Morandi in the 1990s, such as reflectometry, which was able to measure the tension, but not strength of the tendons.[41][43]
Replacement proposals
By the mid-2000s, the A10 route through Genoa and over the bridge had become highly congested. The city council requested proposals for improvement of traffic flow through Genoa, with the Autostrade company in 2009 proposing the "Gronda di Ponente" project to improve flow, by moving traffic to a newly built Autostrada interchange system located to the north of the city. As part of the initial study and report, the Autostrade company measured that the bridge carried 25.5 million transits a year, with traffic having quadrupled in the previous 30 years and "destined to grow, even in the absence of intervention, by a further 30% in the next 30 years".
The study highlighted how the traffic volume, with daily queues at peak hours joining the Autostrada Serravalle, produced "an intense degradation of the bridge structure subjected to considerable stress", with the need for continuous maintenance.[44] The study showed that, in the option for improving what was termed as the "low gutter", it would be more economical to replace the bridge with a new one north of its current location, and then to demolish the existing bridge.[45][failed verification]
On 14 August 2018, around 11:36 local time (09:36 UTC), during a torrential rainstorm, the span around pillar 9 of the Ponte Morandi collapsed and the vehicles on it fell into the Polcevera river.[46][47] Forty-three people were confirmed dead and 16 injured.[48][49] The disaster caused a major political controversy about the poor state of infrastructure in Italy and raised wider questions about the condition of bridges across Europe.[50] It was later decided that the bridge would not be repaired, but demolished. Demolition began in February 2019[51] and was completed on 28 June 2019.[52][53] Construction on the replacement began on 25 June 2019, and it was completed in the spring of 2020. The Genoa-Saint George Bridge was inaugurated on 3 August 2020.[54]
References
^"Expert reaction to Genoa motorway bridge collapse". Science Media Centre. 14 August 2018. Retrieved 15 October 2018. Dr Maria Rosaria Marsico, senior lecturer in Structural Engineering at the University of Exeter, said: 'The bridge that collapsed today is part of the Polcevera Creek Viaduct in Genoa, Italy. It was built in a densely crowded urban area which is occupied by two railroad yards, large industrial plants and the Polcevera Creek. The bridge is known as Morandi Bridge from its designer, the engineer Riccardo Morandi.'
هذه المقالة يتيمة إذ تصل إليها مقالات أخرى قليلة جدًا. فضلًا، ساعد بإضافة وصلة إليها في مقالات متعلقة بها. (أبريل 2019) أوتيس ثورنتون معلومات شخصية الميلاد 30 يونيو 1945 (79 سنة) مواطنة الولايات المتحدة الحياة العملية المهنة لاعب كرة قاعدة الرياضة كرة القاعدة تعديل م�...
Запрос «Удел» перенаправляется сюда; см. также другие значения. Не следует путать с удельным имением. Удельные княжества на Руси в XII веке Уде́льные кня́жества (уде́лы) (от делить[1]) — территории (земли, стороны, страны) на Руси в XII—XVI веках, находившиеся во владен�...
County in Missouri, United States County in MissouriJohnson CountyCountyJohnson County Courthouse in WarrensburgLocation within the U.S. state of MissouriMissouri's location within the U.S.Coordinates: 38°45′N 93°49′W / 38.75°N 93.81°W / 38.75; -93.81Country United StatesState MissouriFoundedDecember 13, 1833Named forRichard Mentor JohnsonSeatWarrensburgLargest cityWarrensburgArea • Total833 sq mi (2,160 km2) • L...
Pangeran DiponegoroSultan Abdul Hamid Kabirul Mukminin Sayyidin Paneteg Panatagama Kalifatu Rosulillah ing Tanah JawaLukisan Pangeran DiponegoroKelahiranBendara Raden Mas Mustahar11 November 1785Ngayogyakarta HadiningratKematian8 Januari 1855(1855-01-08) (umur 69)Makassar, Hindia BelandaPemakamanKampung Melayu, Wajo, Makassar, Sulawesi SelatanWangsaMataramAyahSultan Hamengkubuwana IIIIbuR.A. MangkarawatiPasanganRaden Ajeng Ratu Ratna Ningsih, Bendara Raden Ayu Retno Madubrongto, Raden Ay...
Historic house in Texas, United States United States historic placeCarl Hilmar Guenther HouseU.S. National Register of Historic Places Guenther House in 2012Carl Hilmar Guenther HouseShow map of TexasCarl Hilmar Guenther HouseShow map of the United StatesLocation205 E. Guenther St., San Antonio, TexasCoordinates29°24′41″N 98°29′44″W / 29.41139°N 98.49556°W / 29.41139; -98.49556Arealess than one acreBuilt1880 (1880)Architectural styleVernacular Art...
Insignes de l’ISAF et de la Task Force Lafayette sur des militaires français lors de la prise d'armes au Palais du Gouverneur militaire de Strasbourg, le 31 janvier 2013, en présence du chef d’état-major de l’armée de terre, le général Bertrand Ract-Madoux, à l’occasion du retour en France de la Task force Lafayette. Les forces de l'armée française interviennent dans la guerre d'Afghanistan à partir de la fin 2001 dans deux opérations internationales distinctes : la f...
American geographer (1911–2006) This article needs additional citations for verification. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed.Find sources: Gilbert F. White – news · newspapers · books · scholar · JSTOR (February 2013) (Learn how and when to remove this template message) Gilbert F. WhiteBornNovember 26, 1911 (1911-11-26)Chicago, Illinois, U.S.DiedOctober 5, 20...
Historic house in Washington, D.C., United States This article includes a list of general references, but it lacks sufficient corresponding inline citations. Please help to improve this article by introducing more precise citations. (August 2017) (Learn how and when to remove this template message) President Lincoln and Soldiers' Home National MonumentLocation within Washington, D.C.Show map of District of ColumbiaPresident Lincoln's Cottage at the Soldiers' Home (the United States)Show map o...
This article needs additional citations for verification. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed.Find sources: Windhill and Wrose – news · newspapers · books · scholar · JSTOR (March 2024) (Learn how and when to remove this message) Human settlement in the United KingdomWindhill and Wrose2004 Boundaries of Windhill and Wrose WardPopulation16,308 (ward. 2011)UK ...
Romanesque church in Milan See also: Sant'Ambrogio, Florence Basilica of Sant'Ambrogio(Basilica di Sant'Ambrogio)Exterior view of the basilica.ReligionAffiliationCatholicProvinceMilanEcclesiastical or organizational statusMinor basilicaYear consecrated379StatusActiveLocationLocationMilan, ItalyGeographic coordinates45°27′44.73″N 9°10′32.90″E / 45.4624250°N 9.1758056°E / 45.4624250; 9.1758056ArchitectureTypeChurchStyleRomanesqueCompleted1099 The Basilica of ...
Ryuji Kawai Informasi pribadiNama lengkap Ryuji KawaiTanggal lahir 14 Juli 1978 (umur 45)Tempat lahir Tokyo, JepangPosisi bermain GelandangKarier senior*Tahun Tim Tampil (Gol)1997-2002 Urawa Reds 2003-2010 Yokohama F. Marinos 2011-2018 Hokkaido Consadole Sapporo * Penampilan dan gol di klub senior hanya dihitung dari liga domestik Ryuji Kawai (lahir 14 Juli 1978) adalah pemain sepak bola asal Jepang. Karier Ryuji Kawai pernah bermain untuk Urawa Reds, Yokohama F. Marinos dan Hokkaido Co...
Mexican professional wrestler Atlantis Jr.Birth nameUnrevealed[a]Born1998[2]Mexico City, MexicoParent(s)Atlantis (father)[2]RelativesEl Hijo de Atlantis (brother)Atlantico (uncle)Professional wrestling careerRing name(s)Atlantis Jr.TiburónBilled height1.82 m (6 ft 0 in)Billed weight87 kg (192 lb)Trained byRingo Mendoza[2]Virus[2]Arkangel de la Muerte[2]Último Guerrero[2]Último Dragoncito[2]Franco Colom...
American historian Not to be confused with Walter Johnson (academic). Walter JohnsonWalter Johnson discussing the slave trade in New Orleans, 2000.Born1967Columbia, Missouri, U.S.NationalityAmericanAcademic backgroundAlma materAmherst CollegePrinceton UniversityAcademic workDisciplineHistoryInstitutionsNew York UniversityHarvard University Walter Johnson (born 1967 in Columbia, Missouri) is an American historian, and a professor of History and of African and African-American Studies at Harvar...
For the raid on St Malo later in the year, see Battle of Saint Cast. 1758 military operation Raid on St MaloPart of Seven Years' WarMap of Saint MaloDate5–12 June 1758LocationSt Malo, France48°38′53″N 2°00′27″W / 48.6481°N 2.0075°W / 48.6481; -2.0075Result British victory[1]Belligerents Great Britain FranceCommanders and leaders Duke of Marlborough Richard Howe Lord George SackvilleStrength 13,000 22 Ships of the line 8 FrigatesCasualt...