You can help expand this article with text translated from the corresponding article in French. (April 2023) Click [show] for important translation instructions.
View a machine-translated version of the French article.
Machine translation, like DeepL or Google Translate, is a useful starting point for translations, but translators must revise errors as necessary and confirm that the translation is accurate, rather than simply copy-pasting machine-translated text into the English Wikipedia.
Consider adding a topic to this template: there are already 1,685 articles in the main category, and specifying|topic= will aid in categorization.
Do not translate text that appears unreliable or low-quality. If possible, verify the text with references provided in the foreign-language article.
You must provide copyright attribution in the edit summary accompanying your translation by providing an interlanguage link to the source of your translation. A model attribution edit summary is Content in this edit is translated from the existing French Wikipedia article at [[:fr:Piscine olympique de Saint-Denis]]; see its history for attribution.
You may also add the template {{Translated|fr|Piscine olympique de Saint-Denis}} to the talk page.
As early as 2000, Aubervilliers was solicited for a redevelopment project related to the Paris 2012 Olympic Games bid on the site of the Fort d'Aubervilliers. Comprising five pools, including an outdoor one, it was to accommodate 15,000 spectators on removable stands.
The Paris 2024 Olympic Games bid relaunched the project. In June 2016, the public interest group in charge of the Paris 2024 bid decided to locate the Olympic aquatic centre in Saint-Denis on a site then occupied by Engie's research centre, located west of the Stade de France, separated from it by the Avenue du Président-Wilson. The project was launched in March 2017. In June 2017, the future aquatic centre was officially named the Olympic Aquatic Centre. The first stone was laid on 19 December 2017 in the presence of the President of the French Republic, Emmanuel Macron. As of October 2022, construction was underway.
The Paris Aquatic Centre was inaugurated on 4 April 2024. After the Olympics, the venue will reopen for public use in June 2025.[2]
Description
The Olympic Aquatic Centre has a capacity of 5,000 for the Olympics, and will then be reduced to 2,500 following the Games. It was built on the site of the former research centre of Engie, in the Plaine Saint-Denis neighbourhood, west of the Stade de France. It is connected to the stadium by a footbridge spanning the A1 autoroute. The centre has two 50-metre pools, one of which is covered and the other open-air, as well as a diving pool and a water polo pool. It also has a spa and fitness area. The building was designed to be sustainable, including features like seats made of recycled plastic and shallower pools to limit the amount of energy needed for heating.[3] After the Games, the centre will be used for high-level training, as well as for regional and national competitions. It will also be open to the general public. The centre is being built under the management of the Métropole du Grand Paris."