These functions sometimes create conflicting demands. For flood protection, the reservoir should be as empty as possible; for low water regulation, it is desirable that the reservoir is as full as possible. Accordingly, there are for the water economy an operating plan that is dependent on the time of year and the expected water quantities. e.g. snow meltwaters at the end of winter, droughts in summer.
Dam
The actual barrage is an embankment dam made of rubble (crushed stone) with a central concrete core and a grout curtain of clay. The concrete wall has joints that follow the shape of the whole dam, without leaking. The design is very similar in many respects to the Söse Dam built shortly beforehand.
Pumped storage hydro-electric power station
The reservoir of the dam originally acted as the upper reservoir of the pumped-storage power station. Immediately below the dam is the lower reservoir with a 7.5 m high earth dam that acted as a stilling basin. The power station is also located at the foot of the dam. It has 2 turbines with a combined output of 5.04 MW (possibly as much as 6.2 MW).
The pumped-storage facility has not been used since the 1990s as it was no longer economical. The power station now operates simply as a storage power station with a Francis turbine.
Upgrades
The dam was rehabilitated from 2010 to 2018.[1][2][3][4]