In 2015 a National Energy Forum was founded to decide upon generation mixes to be deployed in the Republic of Ireland,[7] out to 2030. This forum has yet to be convened (Oct 2016).
A nuclear power plant was proposed in 1968, and resulted in the creation of the Nuclear Energy Board. It was to be built during the 1970s at Carnsore Point in County Wexford by the Electricity Supply Board. The plan envisioned four reactors to be built at the site, but was dropped in 1981 after strong opposition from anti-nuclear lobby groups throughout the 1970s, particularly in 1978 with concerts and rallies being held at Carnsore Point attended by popular musician Christy Moore. The intended generating capacity of the planned station was therefore required to be sourced from other energy sources, and such, the construction of the coal burning Moneypoint power station began in 1979.[15]
In April 2006, a government-commissioned report by Forfás pointed to the need for Ireland to reconsider nuclear power in order "to secure its long-run energy security". A relatively small-scale, Generation IV nuclear station was envisaged. In 2007, Ireland's Electricity Supply Board made it known that it would consider a joint venture with a major European Union energy company to build nuclear capacity.[5]
A 2012 International Energy Agency (IEA) report said that Ireland is highly dependent on imported oil and natural/fossil gas. While the push to develop renewable energies is commendable, it will result in an increased reliance on fossil gas, as gas-fired power plants will be required to provide flexibility in electricity supply when wind power is unavailable. About 60% of Ireland's electricity already comes from gas-fired generation, which adds to energy security concerns, particularly as 93% of its gas supplies come from a single transit point in Scotland.[5]
As there is a need to replace the coal burning 900 MWMoneypoint power station, situated in the South West of Ireland, a station which will approach its design life in 2025 [18] and until then it will remain as Ireland's primary emitter of greenhouse gases.[19] A dependable baseload power source with a high capacity factor will be required to keep the grid stable in its absence, a role that is now being filled by Moneypoint station, this role will thus need to be filled by a low carbon power station to mitigate climate change.
In 2015 a National Energy Forum was envisaged to decide on generation mixes to be deployed in Ireland [7]
out to 2030, as of July 2016 this forum has not been convened.
Celtic interconnector
In 2016 proposals for a $1 billion Irish-French subsea cable, with a capacity for 700 MW, close to the 900 MW output of Moneypoint, were discussed between both countries. With over 70% of French electricity generated from its fleet of fission-electric reactors, if connected, Ireland would further receive electricity from overseas nuclear energy suppliers, with the commencement of construction suggested for 2021, the Celtic Interconnector is expected to be completed by 2025. It would then become Ireland's only connection to an EU member state, following the withdrawal of the UK, in Brexit.[20]
Nuclear fusion
As with the other members of the European Atomic Energy Community (Euratom), Ireland funds nuclear fusion energy research, including the International Thermonuclear Experimental Reactor, now known simply as the ITER project, with the Irish contribution being managed by the National Centre for Plasma Science & Technology at Dublin City University.[21]
Donegal uranium prospecting
In 2007, the Green party which were the political architects behind the 1999 prohibition in the Republic of Ireland of the generation of fission-electricity, further prohibited the granting of exploration contracts to 2 unnamed mineral prospecting companies, which were requesting to explore the west of county Donegal.[23] The then energy minister, the Green party's Eamon Ryan, signaled he was denying the exploration licences as he is "against" nuclear energy.[24] Ryan has also stated that "It would be hypocritical to permit the extraction of uranium for use in nuclear reactors in other countries, while the nuclear generation of electricity is not allowed in Ireland".[25] The suggested mining method of In-situ liquid extraction of underground uranium, was deemed the most likely had the prospecting developed into a mining licence.[26]
Ireland is a member state signatory to the Nuclear Exporters Committee, which requires indigenous exploration and processing companies conduct all uranium-ore extraction and handling. The international committee monitors the exporting of process knowledge and techniques and therefore requires each member state to indigenously develop the processing techniques and manufacture all the equipment that relate to natural uranium ore, within its own borders.