NextEra Energy, Inc. is an American energy company with about 58 GW of generating capacity (24 GW of which were from fossil fuel sources[4]), revenues of over $18 billion in 2020, and about 14,900 employees throughout the US and Canada.[5][4] It is the world's largest electric utility holding company by market capitalization, with a valuation of over $170 billion as of Oct 2024.[6] Its subsidiaries include Florida Power & Light (FPL), NextEra Energy Resources (NEER), NextEra Energy Partners, Gulf Power Company, and NextEra Energy Services.
FPL, the largest of the subsidiaries, delivers rate-regulated electricity to approximately 5 million customer accounts, or an estimated 10 million people, across nearly half of Florida and is the third largest electric utility company in the United States.[7] NEER, together with its affiliated entities, is the world's largest generator of renewable energy from wind and solar.[8] In addition to wind and solar, NextEra Energy Resources owns and operates generating plants powered by natural gas, nuclear energy, and oil.[7] As of 2020, approximately 41% of NextEra Energy's generating capacity was from fossil fuels and non-renewables.[4]
The company ranked 167th on the 2018 Fortune 500 of the largest United States corporations by revenue.[9]
NextEra Energy traces its origins to 1925 with the formation of Florida Power & Light and the formation of FPL Group in 1984.[10][11]
The company purchased Colonial Penn in 1985[12] and sold it in 1991.[13] In 1998, FPL Group created FPL Energy, a subsidiary to manage FPL Group efforts outside of FPL's service area.[12] The same year, the company moved to acquire 37 power stations in Maine, Massachusetts, and New Jersey.[14] After a federal ruling would have limited the company's access to the New Englandpower grid, FPL Group attempted to break off its purchase agreement in Maine,[15] but ultimately completed the purchase in March 1999.[16]
The Environmental Protection Agency recognized FPL Group for achieving its goal to reduce its emissions by 21 percent per kilowatt hour in 2008.[21] The FPL Group Foundation, the company's philanthropic arm, donated $1 million to the Salvation Army in 2009 to help customers in danger of having service turned off pay their power bills.[22] The following year, FPL Group rebranded as NextEra Energy. At the time, it provided power in 28 states and Canada.[12]
In June 2005, FPL Energy, a subsidiary of FPL Group, acquired Houston-based Gexa Energy in June 2005 for $80.6 million.[26]
On December 4, 2014, NextEra Energy announced its plans to purchase Hawaiian Electric Industries for $4.3 billion.[27] However, in July 2016, Hawaii's Public Utilities Commission rejected the offer in a 2-0 vote over doubts of NextEra Energy's commitment to the state's renewable energy goal, which terminated the merger agreement.[28] The proposed merger had support from over 25 local groups, including the Hawaii State AFL–CIO and the HawaiiChamber of Commerce.[29]
NextEra Energy and Energy Future Holdings, parent company of Texas-based utility Oncor Electric Delivery, reached a $18.7 billion merger agreement on July 29, 2016, but the agreement was terminated in July 2017 after the Texas Public Utility Commission rejected the offer over disagreement on the control of Oncor's board of directors. Two other competing bids were submitted in July 2017 for purchasing Oncor, including a $17.5 billion bid from Berkshire Hathaway Energy and a $18.5 billion bid from Elliott Management Corporation.[30]
In January 2018, NextEra Energy expressed interest with members of the South Carolina Senate over a possible purchase of SCANA and Santee Cooper. Dominion Energy offered $14.6 billion to buy SCANA, but South Carolina lawmakers harshly criticized the proposal over a lack of future taxpayer relief.[31] In February 2018, NextEra Energy floated a $15.9 billion proposal to buy Santee Cooper and briefed South Carolina lawmakers.[32]
In May 2018, NextEra Energy announced that it planned to buy Gulf Power Company, the largest electricity producer in Northwest Florida, from Southern Company in a $6.4 billion deal, pending approval from regulators.[33] The acquisition, which expanded NextEra Energy's combined residential customer base in Florida to approximately 51 percent of the state's population and also included Florida City
Gas, was completed on January 1, 2019.
Corporate affairs
Litigation
In 2018, NextEra Energy and Entergy left the Nuclear Energy Institute.[34] In February of that year, it filed a lawsuit against the Institute alleging that the trade group had inappropriately cut off its access to a database of nuclear power workers. The lawsuit stated NEE disagreed with the Institute's priorities and that the trade group was advocating for policies that would be damaging to NextEra Energy's business; it also alleged the group was extorting NextEra Energy for $860,000 to regain access to the database. The Institute called the allegations "baseless".[35] A judge in Florida rejected NEE's claims in September 2018.[36]
In June 2018, the United States Court of Appeals for the Eleventh Circuit rejected NextEra Energy's claim for a $97 million tax deduction for $200 million paid in contract fees to the federal government toward the Nuclear Waste Fund. NextEra Energy sought to deduct payments made between 2003 and 2010 for "the disposal of radioactive waste produced by nuclear power plants".[37]
In August 2018, NextEra Energy received a cease and desist order by Oklahoma state officials concerning the construction of wind turbines violating a state law intended to protect open air space. The law requires that developers obtain appropriate permitting from the Federal Aviation Administration or the United States Department of Defense. NextEra Energy had filed obstruction evaluation cases for the construction of wind turbines in Oklahoma with the FAA in March 2018, but the FAA had yet to issue determinations at the time that the cease and desist order was issued.[38] The construction of the wind farm was cancelled in May 2019.[39]
In 2022, NextEra paid $8 million for the deaths of over 150 eagles at wind farms missing eagle permits.[40]
Criticism
Avangrid transmission line project
In 2021, NextEra was accused of lobbying heavily against a transmission line project proposed by Avangrid, Inc. The 145-mile line, to be known as New England Clean Energy Connect (NECEC), would have delivered hydroelectric power from Quebec to utilities in Massachusetts and Maine.[41] In a complaint to federal regulators, the rival company said NextEra had “taken every opportunity, both in the open and behind the scenes, to oppose, delay, and derail” the project, including funding opposition groups because the hydropower would have provided competition to NextEra's oil-fired power plant in Yarmouth.[42] “In doing so,” Avangrid wrote, “NextEra is purposely trying to thwart the goals of Maine and Massachusetts to obtain more renewable power.”[43] According to Daily Energy Insider, Avangrid had obtained every regulatory approval required at the state and federal levels, and the project was supported by Maine Gov. Janet Mills, Massachusetts Gov. Charlie Baker, U.S. Energy Secretary Jennifer Granholm, and the stateʻs major newspapers.[44] In November 2021, the voters of Maine approved a ballot initiative to prohibit construction of the $1 billion transmission line project, which had been represented as a choice between clean energy and the protection of pristine woodlands.[45]
Solar power ballot initiatives
NextEra Energy has backed failed ballot amendment campaigns to impose fees and barriers to installations of rooftop solar panels. In 2016, Florida Power & Light, which is a subsidiary of NextEra Energy, joined forces with Devon Energy, and Tampa Electric Company.[46] As a group they spent $20 million promoting a failed ballot initiative in Florida that would have curbed rooftop solar installations. It drew criticism from Al Gore. “Over the last several years, NextEra has been very aggressive against customer-owned solar,” says Alissa Schafer, a researcher with the Energy and Policy Institute, a clean energy advocacy group.[43]
In 2021, investigative reporting by the Miami Herald revealed that NextEra Energy had lobbied Florida legislators to undermine rooftop solar by preventing homeowners and businesses to engage in net metering (selling excess power back to FPL).[47] NextEra Energy made a $10,000 donation to Women Building the Future, drafted a bill, had their lobbyist deliver the bill to Florida legislator Jennifer Bradley, and subsequently donated $10,000 to her re-election campaign.[48] “This is a tired tactic that utilities have used to maintain their monopoly grip on electricity markets,” said Will Giese, southeast regional director for the Solar Energy Industries Association.[49] Opponents of the legislation claim that if such bills pass, the fast-growing green power industry would quickly start to collapse.[50]
Florida legislature candidates
In 2021, investigative reporting by the Orlando Sun Sentinel revealed that FPL funded political consultants more than $3 million to promote "ghost" spoiler candidates in key Florida legislature races. The spoiler candidates were on the ballot as a no-party option and were intended to confuse voters and dilute support for the Democratic candidate in each race.[47][51] The accomplice named "Rodriguez" ran as a sham candidate and siphoned away votes from the Democratic candidate, also named Rodriguez. The mailing campaign employed the language of the Democratic candidate and had the accomplice focusing on fixing health care, and fighting climate change, all paid for by new, out-of-state political committees.[52] The Democrats lost by a mere thirty two votes.[53] Former senator Frank Artiles and his accomplice were each charged with three third-degree felony charges related to violating campaign finance law, conspiracy to make campaign contributions in excess of legal limits, also making these excess contributions, and false swearing in connection to an election.[54]
Artiles has for years associated with Florida utilities, including NextEra and its subsidiary FPL. Artiles obtained over $30,000 in political contributions from Florida utilities throughout his time in office, which included a direct contribution of $6,000 from NextEra. Veterans for Conservative Principles, his political committee, accepted close to $13,000 from NextEra.[52] Prior to his resignation from the Florida Senate in April 2017,[55] Artiles fast-tracked pro-utility bills as former chairman of the Florida Senate’s Communications, Energy and Public Utilities Committee, including a bill that would have permitted NextEra to charge its fracking costs to Florida ratepayers.[52]
In 2018, Senator Keith Perry won re-election against Democrat Kayser Enneking by around 2,000 votes, due to independent Charles Goston pulling votes away from Enneking. According to the Sentinel, FPL donated $14.15 million to a political ad nonprofit whose consultants were connected to one of the groups that paid for Goston's ads.[56] FPL has also donated $20,000 to Perry’s political committee, Building a Prosperous Florida. The year before, Perry voted in support of NextEra’s exploratory fracking legislation while serving on the committee chaired by Artiles. Perry has accepted $13,500 in direct political donations from Florida utilities, including $1,000 from NextEra, according to campaign finance filings.[52]
Environmental issues
In 2007, Florida's Public Service Commission rejected a plan by NextEra Energy to build a coal-burning power plant on 5,000 acres (20 km2) in Moore Haven, Florida, near the Everglades National Park. The National Park Service raised concerns that the coal plant would contaminate Lake Okeechobee with mercury and harm the Everglades.[57][58]
On January 5, 2009, 30 environmental activists staged a five-day vigil along the Barley Barber Swamp to draw attention to what they claimed were damages being wrought by the power company's 3,705 megawattMartin County plant. The activists claimed that the Martin County power plant's water use had caused the forest's health to decline. Much of the evidence behind such claims came from research conducted by Hydro-ecologist Dr. Sydney Bacchus. Dr. Bacchus claimed that the power plant's water use had caused "surficial aquifer drawdown". According to Dr Bacchus, the ecosystem perishes when the roots of the trees become exposed due to the lower water table.[59]
In 2018, the 11th Circuit in Atlanta rejected NextEra's request for a $97M refund on costs related to the cleaning up of nuclear waste between 1969 and 1995.[60]
In 2019, the Florida Supreme Court concluded that NextEra Energy could charge Florida ratepayers for over $132M in cleanup costs at its Turkey Point plant, caused by hypersaline water leaking out of the 5,900-acres of old cooling canals that stretch out adjacent to Biscayne Bay.[61]