The line was originally part of the New York, New Haven and Hartford Railroad, forming the southern leg of the New Haven's main line. It is colored red on Metro-North timetables and system maps, and stations on the line have red trim. The red color-coding is a nod to the red paint used in the New Haven's paint scheme for much of the last decade of its history. The section from Grand Central to the New York-Connecticut border is owned by Metro-North and the section from the state line to New Haven is owned by the Connecticut Department of Transportation (CTDOT). From west to east in Connecticut, three branches split off: the New Canaan Branch, Danbury Branch, and Waterbury Branch, all owned by CTDOT.
The Great Blizzard of 1888 blocked the rail line in Westport, between the Saugatuck and Green's Farms stations. It took eight days to restore service, as snow was dug out by hand.[5]
The line was grade separated into a cut in Mount Vernon in 1893 as a result of multiple collisions between trains and horsecars.[6]
As part of the construction of Grand Central Terminal in the early 1900s, all of New York Central's lines that ran into the terminal were electrified. Third rail was installed on the Hudson and Harlem Divisions, while the New Haven Division received overhead wires on the segments that were not shared with the Harlem and Hudson Division.[7]Steam locomotives on the New Haven Division were replaced with electric locomotives, and later electric multiple units.[5][8] New Haven Division electric trains started running to Grand Central in October 1907.[9] The replacement of the Housatonic River Railroad Bridge that year completed quadruple-tracking of the line from Woodlawn Junction to New Haven.[10]
The New Haven was merged into Penn Central in 1969. On November 25, 1969, Penn Central, the Metropolitan Transportation Authority, and the states of New York and Connecticut agreed that New York would buy its section of the line and Connecticut would lease its section as far as New Haven.[11] The acquisition took place on January 1, 1971, and included the three branches.[12] After Penn Central went bankrupt, the Consolidated Rail Corporation (Conrail) took over operations in 1976. The MTA took over operations in 1983, and merged Conrail's former commuter rail lines in the New York area into Metro-North. The MTA undertook to rebuild the railroad, upgrading signals, tracks, ties, roadbeds, and rolling stock.
New and closed infrastructure
Over the years, some stations have been abandoned or closed, and some characteristics of the line have changed. The Columbus Avenue station in Mount Vernon was closed in the Penn Central era, due to its proximity to Mt. Vernon station and the expense of converting it to high-level platforms.[citation needed] It had previously been a transfer station to the overhead viaduct station of the New York, Westchester and Boston Railway; an impressive ruin remains and is easily visible from passing trains.[citation needed] Other stations abandoned along the mainline include Devon, at the junction of the Waterbury Branch, and Norwalk, replaced by South Norwalk.[13] The changeover from catenary to third rail was moved from Woodlawn to just west of Pelham in the early 1990s. The catenary poles are still intact as they carry several communications lines.[14] There is an abandoned rail yard just east of Port Chester station.
The New Haven's Harlem River and Port Chester Railroad, diverging from the main line below New Rochelle, ran local passenger service to the Harlem River Terminal in the South Bronx until 1931, and has several abandoned stations.[15][16] It was a major freight route for the New Haven to Queens, where it interchanged with the Long Island Rail Road and the Pennsylvania Railroad. Four new stations are planned along this route as part of Metro-North's Penn Station Access.
As a largely four-track electrified mainline, the New Haven Line is capable of supporting a mix of local and express service, allowing for a higher density of stations than many other commuter rail lines. By the beginning of the 20th century, there were stations in every population center along the line. Although some of these were dropped over the years due to low ridership, no new stations were added to the New Haven Line mainline for over 100 years (Merritt 7 station on the Danbury Branch opened in 1985).[17]Fairfield Metro (now Fairfield-Black Rock) opened in December 2011 to support a new commercial development.[18] After a decade-long process choosing between locations in West Haven and Orange, West Haven station opened in August 2013, filling the longest gap on the line.[19] Currently, a study is being undertaken to detail the costs and benefits of implementing more frequent service on the line. The line would have to be upgraded to accommodate additional service.[20]
On July 11, 2022, six new express trains were added to the New Haven Line, only stopping at New Haven, Bridgeport, and Stamford, and Grand Central. These trains, of which three would run in the morning, and three would run in the evening, would operate to Grand Central in as little as 99 minutes.[21]
Incidents and accidents
Fatal accidents
The Norwalk rail accident occurred at the Norwalk River bridge in Norwalk, Connecticut, on May 6, 1853, killing 48 people.[22] Another occurred in Westport, Connecticut, in 1895, and another in that town on October 3, 1912.[5][better source needed] Another fatality occurred in August 1969 on the New Canaan Branch, which prompted the line's then-operator, Penn Central, to stop operating northbound and southbound trains simultaneously on the branch.[23] There was also a collision between two trains in Mount Vernon in 1988, which killed an engineer.[24] In 2012 two people were killed by a train-car collision at an ungated grade crossing on the Danbury Branch in Redding, Connecticut,[25] and in 2013 a track worker was struck and killed in West Haven.[26]
All New Haven Line electric trains change over between third rail and overhead catenary between Mount Vernon East and Pelham[29] at normal track speed.[30] Inbound trains to Grand Central lower their pantographs in this area, while outbound trains raise them; the third rail shoes stay in the same position both in and out of third rail territory. Both catenary and third rail overlap for a quarter-mile between Mount Vernon East and Pelham to facilitate this changeover.[citation needed] When the line was first electrified in 1907, trains transitioned between third rail and overhead catenary at Woodlawn Heights,[29][31] approximately 2 miles (3.2 km) southwest of Pelham.[29] This changeover is still needed today since the New Haven Line and Harlem Line share trackage between Grand Central and Mount Vernon; the two lines split just north of the Harlem Line's Woodlawn station.
Stamford Transportation Center divides the New Haven Line's mainline into an "inner zone" and an "outer zone". Inner zone trains run local, serving all stops between Grand Central and Stamford. Outer zone trains run express between Grand Central and Stamford, making only one intermediate stop at Harlem-125th Street, before running local between Stamford and New Haven.
The entire New Haven Line mainline is grade-separated with no grade crossings, although there are several privately marked-pedestrian crossings in many of the storage yards such as the East Side Yard in Bridgeport.[citation needed]
Within the Metro-North system, the New Haven Line is the only line with operating branch lines. These three branch lines are the New Canaan Branch, the Danbury Branch, and the Waterbury Branch. The New Canaan Branch is electrified, and uses the same Kawasaki M8 railcars as the main line. The Danbury Branch and Waterbury Branches, on the other hand, use Shoreliner consists powered by diesel locomotives. Some main line trains will occasionally use diesel equipment in revenue runs for positioning or due to equipment shortages.
The New Haven Railroad, Metro-North's predecessor, had an extensive branch network in Connecticut, including: a branch off the Danbury Branch at the aptly named Branchville, CT to Ridgefield, CT; another branch off the main line for freight at Bridgeport known as the Berkshire (a never-used bridge spans the Merritt Parkway in Trumbull that would have accommodated this branch under potential reactivation scenarios); and the Maybrook line, which connected the Waterbury Branch with the Danbury Branch, with several branches of its own.[citation needed]
Branch line trains generally operate as their own zone and terminate at a main line station; passengers can then transfer to a train bound for another main line station or Grand Central. The southern terminus for each branch line is Stamford on the New Canaan Branch, South Norwalk on the Danbury Branch, and Bridgeport on the Waterbury Branch. All trains run local on their respective branch lines. During peak hours, however, some trains on the New Canaan and Danbury Branches run limited one-seat service to Grand Central; these trains run express on the main line but still make all stops on their respective branch lines.
Unlike the main line, the New Haven Line branches operate almost entirely at grade, with frequent crossings.
Sports special services
Yankee Stadium
Yankees–East 153rd Street station opened on May 23, 2009. Although it is a Hudson Line commuter station, it offers New Haven and Harlem Line commuters direct game-day service on weekends and after weeknight games, and shuttle service from Harlem–125th Street station during peak periods. The Yankee Stadium station, Harlem-125th Street and Fordham are the three Metro-North stations that serve New Haven Line customers without being located on the Line itself.[32]
Meadowlands game day service
The Train to the Game service on the New Haven Line to the Meadowlands Sports Complex operated only for Sunday 1 pm New York Giants and New York Jets NFL games.[33] The first game scheduled was on September 20, 2009, when the New York Jets hosted the New England Patriots, following a successful test of trains in non-revenue service on August 23.[34][35]
The service was operated using NJ Transit equipment under an operating agreement among NJT, Metro-North, and Amtrak. NJT equipment was required as its electric locomotive power was capable of running under the various catenary systems over three separate railroads using different power supplies. The program was only offered for the early afternoon games so that the NJT equipment could be moved back in place for the Monday morning rush hour.[36]
The service made limited stops on New Haven Line, and used the Hell Gate Line to access New York Penn Station and Secaucus Junction. At Secaucus, riders transferred to a shuttle on the Meadowlands Rail Line. Stops included New Haven, West Haven, Bridgeport, Fairfield, Westport, South Norwalk, Stamford, Greenwich, Rye, Larchmont, Penn Station, and Secaucus.[33]
Shared trackage and operating agreements
Although the New Haven Line shares track with the Harlem Line in the Bronx, along this line it stops only at Fordham, due to an 1848 agreement with the Harlem Line's predecessor railroad, the New York Central. This agreement granted the New Haven predecessor New York, New Haven and Hartford Railroad trackage rights over the Harlem Line to Grand Central Terminal, but restricted its service in the Bronx to discharge service only (i.e. no boarding revenue passengers).[37] This agreement continued until 2019, due to the operating agreement between Metro-North and the Connecticut Department of Transportation (CTDOT), which means passengers traveling between Fordham and Manhattan could not ride on a New Haven Line train.[38] Beginning April 14, 2019, passengers heading to and from Grand Central can also travel on New Haven Line trains. This was a result of an agreement reached with CDOT, under which revenue from tickets between Fordham and Manhattan would be split between Metro-North and CDOT.[39][40] While the New Haven Line's one stop in the Bronx is currently at Fordham, from 1848 until the 1920s that stop was instead at Woodlawn.[41]
The New Haven Line is also operated in Connecticut under an agreement between Metro-North and the CTDOT, in which costs for main line operation are shared (currently 65% CTDOT and 35% Metro-North) and costs for branch service are borne 100% by CTDOT.[42] Amtrak pays Metro-North for the right to run its trains on the line using its electrical system and the resulting increase in maintenance needs. This payment totaled approximately $11.8 million in 2013. Metro-North dispatches Amtrak trains on the line and receives bonus payments from Amtrak for keeping its trains running on time. When Metro-North fails to do so, it is required to pay penalties to Amtrak.[43]
Since 1996, the New Haven main line and New Canaan branch have used Automatic Train Control (ATC) in conjunction with cab signals, a safety feature used in routing trains, keeping safe distances, and moderating train speeds.[46][47] Signals are controlled from a centralized location, the Operations Control Center in New York City.[8] Until the 1980s, the New Haven Line had a decentralized signaling system, and each section of track was controlled by a separate switch tower. The switch towers themselves did not get radio communication with each other until the late 1960s, when Penn Central took over the New Haven Line.[48] Track interlockings are governed within Control Point boundaries, or CPs.[49] The New Haven Line is unique in that the CPs are known (informally) by nicknames for their region. In December 2020, Positive Train Control was fully implemented on the mainline and several branch lines.[50]
Signals on the New Haven Line had once been mounted on the catenary bridges; these were all replaced throughout the 1990s and into the early 2000s with wayside "dwarf" signals at track level along the right-of-way. The form of signalization known as Centralized Traffic Control, or CTC, is used on the main line and the New Canaan Branch,[51] as well as on the Danbury and Waterbury Branches starting in 2013 and 2021 respectively.[52]
The New Haven's traction power system was originally constructed to operate at 11 kV, 25 Hz, using power supplied by the Cos Cob Power Station. The power station was shut down around 1986 and Metro-North converted the traction power system to 60 Hz operation. Traction power is converted from utility-supplied 115 kV (single phase) to 27 kV (single phase with center tap), which is distributed using an auto-transformer system.[53] Power is supplied to the catenary at 12.5 kV, 60 Hz.
Amtrak: Hartford Line, Northeast Regional (to Springfield), Valley Flyer CT Rail: Hartford Line, Shore Line East CTtransit New Haven: 204, 212, 213, 215, 223, 224, 237, 274, New Haven Commuter Connection[72] Limited service station
Rolling stock
Electric
M2, M4, M6 cars
Since the main line and the New Canaan Branch are equipped with 12.5 kV 60 Hz overhead catenary, as opposed to just the 750 V DC third rail of the Hudson and Harlem Lines, different rolling stock that can operate with either power system runs on the New Haven Line.[78] This rolling stock, originally produced by General Electric in two batches (144 in 1972–73 and 100 in 1975–77), was initially branded as the M2 Cosmopolitan, with later versions being made on license by Tokyu Car (model M4, 1988) and Morrison-Knudsen (model M6, 1994). Cosmopolitans can be easily spotted by their red stripe along the side, the presence of pantographs on the lead cars in each set, and a dynamic braking grid on the roof.
M2s operated in married pairs, differentiating them from their predecessor equipment of Pullman Standard and 4400-series washboard MU's (retired since the late 1970s and early 1980s). M4s and M6s operated in triplets, with the middle "D" car not having a cab. Many M2s were reconditioned to extend their useful life beyond the expected 25 years, undergoing a Critical Systems Repair (CSR) program.
The CSR program was modified in 2008 as the delivery of M8s neared. Cars that underwent CSR earlier in the program were undergoing additional renovation. Funding was identified in the MTA's 2010 capital program to continue the CSR program if the M4 and M6 cars were not retired; they were ultimately withdrawn in 2015. The M2s were retired in 2018 as sufficient numbers of the Kawasaki-made M8s entered service and alleviated current equipment shortages.
M8 cars
To replace its aging M2 fleet and increase its total fleet size, Metro-North and CTDOT have undertaken to purchase from Kawasaki Rail Car an initial order of 300 M8 EMUs. The initial order consists of a "base order" of 210 and a "first option" of 90 cars. This order is estimated to cost $760 million. The base order cost is to be split as per the CTDOT/MTA operating agreement (65%/35%, respectively).[42] The M8s each have two single-leaf doors on each side and a full-width operator's cab.[79] The cars are capable of using two types of overhead electrical wires, as well as under-running third rail.[78][80] The M8s are equipped with Advanced Civil Speed Enforcement System and positive train control.[81] In order to run from New Rochelle to Penn Station as part of the Penn Station Access project, the cars will be equipped with third rail shoes that can operate on both over- and under-running third rail systems.
Originally, delivery of the first six M8 cars for testing was to be in July 2009, but was delayed until December 2009 for varied reasons such as design revisions and production delays. The contract allows for additional options for CTDOT of an additional 80 cars, an option that has since been exercised.[82] On July 20, 2011, the Connecticut Department of Transportation announced the order of 25 unpowered M8 railcars, with options for up to 25 more, at a cost of US$93 million to replace the 48-car M6 fleet.[83] The original order of 405 cars was completed on July 13, 2015, except for the 25 unpowered cars on option.[84] Sixty additional M8 cars were ordered in 2016.[85]
A new rail car facility to accommodate the new M8 cars was built in New Haven. Originally estimated at $300 million,[86] the facility was expected to cost $1 billion by 2014.[87]
Diesel
As with the Harlem and Hudson Lines, diesel-powered trains are driven by Brookville BL20GH and dual-mode GE Genesis P32AC-DM locomotives, paired with Shoreliner coaches. While some peak-period trains operate directly to and from Grand Central Terminal with Genesis P32AC-DM dual-mode locomotives only, most New Haven Line diesel-only territory is operated as shuttle service between Danbury and South Norwalk, or between Waterbury and Bridgeport.
The P32AC-DMs used on the New Haven Line are in pool service, meaning that locomotives from either Metro-North or CTDOT can be used on the New Haven Line.[88] Coaches with either paint scheme can also be used. Shore Line East uses a dedicated subfleet of M8 cars with third-rail shoes removed, which cannot be operated into Grand Central, but can be operated into NY Penn Station and Boston, if needed.
Service expansions
Planned and proposed stations
Devon
A 2010 study of the New Canaan and Waterbury Branches considered the construction of a station at Devon Wye in Milford, Connecticut, where the Waterbury Branch joins the New Haven mainline. The station would allow service to be increased on the branch by running some trains to the new station with connections to New Haven trains, rather than taking up slots on the busy mainline. The two station alternatives would have cost $73 to $114 million.[89]
For six months in 2015, a temporary Devon Transfer station served as the transfer point between mainline service and Waterbury Branch trains. The first phase of repairs to the adjacent Housatonic River Railroad Bridge over the Housatonic River prevented Waterbury Branch trains from accessing the normal transfer point at Bridgeport, necessitating the temporary transfer station.[90] The Devon Transfer station was re-activated in 2016 from April until October to accommodate additional repairs and catenary wire work.[91]
Barnum
On July 16, 2014, Connecticut Governor Dannel Malloy approved $2.75 million for the planning of a station in the East End of Bridgeport, Connecticut. The new station, was to be called Barnum after showman and former Bridgeport mayor P. T. Barnum,[92] and was planned to open in 2021. The station would have had two island platforms, allowing for improved express service on the New Haven Line, increasing capacity.[77] As of 2019, the project has been cancelled by the Connecticut DOT after determining they were not in the financial position to undertake the project.[93]
Orange
After several years of contention, West Haven was chosen over Orange in December 2001 as the site for a new station, which opened in 2013. However, local advocates continued to push for an additional station in Orange. In July 2011, Governor Malloy signed a bill that sought a funding source, but that committed no funds to the project.[94] On February 1, 2017, the Connecticut State Bond Commission authorized $21 million for design work for the station, in addition to funding for the upgrade of a station on the Danbury Branch.[95] Design on the station began in January 2017, and construction of the station was to begin in spring 2019, before being completed in fall 2021.[20] In November 2017, the Connecticut DOT announced that it would halt funding for the construction of Orange station and the accompanying transit-oriented development as the state was running out of funds for transportation projects.[96]
Georgetown
In connection with the planned redevelopment of the Gilbert & Bennett Wire Mill as a residential neighborhood, reopening a Georgetown station on the Danbury Branch has been approved, though not yet scheduled or funded.[97][98] The previous station was abandoned in the 1970s due to low ridership.
Wilbur Cross Parkway
The Waterbury and New Canaan Branch study also considered a new station on the Waterbury Branch as a park-and-ride station off the Wilbur Cross Parkway near where it meets the Merritt Parkway in Milford. The station was estimated to cost $41 million to construct.[89]
Although not yet past the Draft Environment Impact Statement stage, a study of enhancing service on and extending the Danbury Branch would include additional stations in North Danbury (Federal Road), Brookfield, and New Milford.[99] The draft EIS was due by 2010, and the final EIS by 2011.[100] The Spring 2009 Update for the first time held out the possibility of extension all the way to Pittsfield, MA, the original route of the New Haven Berkshire Division. Trackage rights would have to be negotiated with the Housatonic Railroad, which owns the line beyond Danbury to New Milford.
Enhancements to the Danbury Branch being studied also include re-electrification of the branch (the branch was electrified from 1925 to 1961), addition of passing sidings, realignment and/or super-elevation of track to eliminate or alleviate curvature and enhance speeds, and installation of automated train control signalling. The new signal system finally began operation in 2013, but extensive work was still ongoing in 2014 because of unresolved problems with the drop gates at grade crossings.[101][102]
Earlier versions of the study examined service to Newtown and Brewster along the Beacon/Maybrook line, as additional branches off the Danbury Branch. These options were not recommended due to limited ridership potential versus additional cost.[103]
As part of the 2015–2019 MTA Capital Program, additional service from the New Haven Line will be provided to New York Penn Station over the Hell Gate Line of the Northeast Corridor, owned by Amtrak. Trackage rights and union agreements would have to be negotiated for this service. Commuter service over this line, formerly the Harlem River Branch of the predecessor New Haven, ended in 1931. New stations will be built at Hunts Point, Parkchester, Morris Park, and Co-op City.[104]
This project was dormant from approximately 2002 to 2009, but an environmental assessment was announced by Metro-North and was to be completed by 2011. The study was in conjunction with ongoing studies for the best uses of Penn Station. The study advanced a single option of full (both peak and off-peak) service to Penn on the New Haven and Hudson Lines.[105] However, the project was delayed.[106] On January 8, 2014, New York GovernorAndrew Cuomo voiced support for the project in his 2014 State of the State address.[77]
In its 2015–2019 Capital Program, the MTA budgeted $695 million for New Haven Line Penn Station Access work, including track, structures, signal, power and communications work along the Hell Gate Line, specifications for rolling stock for the line, and construction of the four new stations.[61] New track will be installed between the Parkchester/Van Nest station and north of the Co-op City station. Three bridges along the route will be rehabilitated or replaced.[104] A groundbreaking ceremony for Penn Station Access took place in the Bronx on December 9, 2022.[107]
Service is planned to begin in 2027 at the earliest.[108] The opening of East Side Access in 2023 diverted some Long Island Rail Road trains to Grand Central Terminal,[109] therefore opening up slots at Penn Station for Metro-North service. During peak hours there will be between six and ten trains to Penn Station. There will be four trains per hour to Connecticut in the reverse peak direction, and there will be two trains per hour to and from Penn Station during off-peak and weekends.[65]
In a limited form, it already takes place with the Jets/Giants game-day service to the Meadowlands, although it is not intended as service to Penn.[110]
Waterbury–Bristol–New Britain–Hartford
As of February 2009, Connecticut legislators were discussing service on an old New Haven passenger line that ceased passenger service decades prior known as the Highland Line, part of the original New England Railroad, also known as the Central New England Railway, both eventual subsidiaries of The New York, New Haven and Hartford Railroad.[111]
Currently, this is a freight-only line operated by Berkshire & Eastern. Station stops would include two in Bristol, as well as in New Britain, between Waterbury and Hartford. The next step is a preliminary scoping study, which would be followed by environmental studies.[112] It is unknown if this will be a Metro-North extension of the Waterbury Branch.
^Sprague, J. L.; Cunningham, J. J. (2013). "A Frank Sprague Triumph: The Electrification of Grand Central Terminal [History]". IEEE Power and Energy Magazine. 11 (1). Institute of Electrical and Electronics Engineers (IEEE): 58–76. doi:10.1109/mpe.2012.2222293. ISSN1540-7977. S2CID6729668.