Majerhat metro station composite structure (station on viaduct and two concourse buildings on either sides) as seen from Majerhat railway station's foot over bridge
Majerhat metro station is an operational metro station on Line 3 of Kolkata Metro. It is the terminal station of the first phase 1 of this line and the first and only station built over an existing railway network, from Joka to Majerhat. The line was sanctioned in India's railway budget of 2010–11, but due to various hurdles, construction was delayed and missed multiple deadlines. The most notable reason for delays was the Majerhat Bridge collapse in 2018.[1]
Since the 14.215 kilometres (8.833 mi) line was sanctioned by then Railway MinisterMamata Banerjee in the Railway budget of 2010–11, it faced several problems which delayed the project. Originally the contracts of the elevated stretch of the line was awarded to Simplex Infrastructures in 2011, although construction couldn't proceed due to land acquisition problems. The contract for construction of the station was re-awarded to Gammon India, in April 2012 by RVNL. In 2018, the adjacent rail over bridge (known as Majerhat Bridge) along the upcoming metro station collapsed, completely stalling the construction of the station as it ran into design, technical and legal challenges. Gammon pulled out of the project after the bridge collapsed.[3] In August 2020, GPT Infraprojects won the bid for construction.[4] Work started in December 2020, with clearance from India Government Mint, Ministry of Finance; which initially didn't allow any elevated structure within a kilometre radius of the mint.[5][6]
It is an elevated metro station with two side platforms. It is being implemented by Rail Vikas Nigam Limited (RVNL). The station is 180 m (590 ft)180 m long with twelve spans. The platform and concourse area are 3,050 m2 (32,800 sq ft) and 3,100 m2 (33,000 sq ft) respectively. It is catered by five escalators, two elevators and five staircases and the whole station is held in between two massive concourse buildings on either side.[3] It is the final station of the proposed phase 1 (Joka to Majerhat) of the line 3.[8]
Connections
Bus
Mominpur and Majerhat Bus Stop is 242 m (794 ft) and 173 m (568 ft) away from the metro Station respectively.[9][10][11]