Throughout her career, the vessel sailed under the names Atlantic Freighter, Merzario Grecia, Stena Grecia, and Tor Felicia.[5]
Operation
Loading and unloading the vessel each take over three hours.[6] Eight trailers are loaded at one time using a "yard tractor train system". The vessel represented 19.6 percent of Marine Atlantic's fleet in 2005.
Asbestos risk
In 1990 asbestos was found in use on the vessel.[7][8] Management made the decision to encapsulate the asbestos. In November 2007, 60 workers on Atlantic Freighter were told they should be tested for asbestos exposure.