You can help expand this article with text translated from the corresponding article in Hungarian. (January 2018) Click [show] for important translation instructions.
View a machine-translated version of the Hungarian article.
Machine translation, like DeepL or Google Translate, is a useful starting point for translations, but translators must revise errors as necessary and confirm that the translation is accurate, rather than simply copy-pasting machine-translated text into the English Wikipedia.
Do not translate text that appears unreliable or low-quality. If possible, verify the text with references provided in the foreign-language article.
You must provide copyright attribution in the edit summary accompanying your translation by providing an interlanguage link to the source of your translation. A model attribution edit summary is Content in this edit is translated from the existing Hungarian Wikipedia article at [[:hu:M8-as autópálya (Magyarország)]]; see its history for attribution.
You may also add the template {{Translated|hu|M8-as autópálya (Magyarország)}} to the talk page.
The construction was reported to be started in 2007 (a few tiny sections were built, including the Pentele Bridge over the Danube) and it had been planned to be completed around 2015 but as of 2013 the plans were not even finalized and the even the permission phase for several smaller parts took more than 2 years.
The completed section of motorway is 8 km long, stretching from Baracs to Apostag. Its major junctions are with M6 (Baracs), Route 6 (Kisapostag), and Route 51 (Apostag). It crosses over the Danube river, on the Pentele Bridge.